0% found this document useful (0 votes)
2 views

office 22

The document is a quotation from ZM Associate detailing work for partitions, tables, glass, kitchen cupboards, and an office file rack, totaling 287 square feet. The cost is calculated at a rate of 950, amounting to a total of 272,650. Payment terms require 60% advance and 40% upon completion of the work.

Uploaded by

zaheer10xyz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views

office 22

The document is a quotation from ZM Associate detailing work for partitions, tables, glass, kitchen cupboards, and an office file rack, totaling 287 square feet. The cost is calculated at a rate of 950, amounting to a total of 272,650. Payment terms require 60% advance and 40% upon completion of the work.

Uploaded by

zaheer10xyz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

ZM Associate

All Kind Works


QUOTATION

Work description:

Partition - L/W 11x12 132 sqft


Table size - L/W/D 6x3x3 52 sqft
Glass 2x6 12 sqft

Total Area 168 sqft

Kitchen Cupboard 8x4 32 sqft


O/M office File rick 8x7 56 sqft

Total Area 88 sqft


Total Sqft 287

Rate 950
Total Cost 272,650

Payments Terms:
60% advance
40% after completion of work.

Sector -5 Allah BuckhshVills Ahmadabad Karachi Shop no. R 2202 Karachi Pakistan