Project Proposal Format
Project Proposal Format
Table of Contents
(Separate page, Times New Roman, 12 pt, Double-Spaced)
Title Page 1
Table of Contents 2
I. Project Title 3
II. Proponents 3
V. Project Rationale 4
VI. Objectives 5
VII. Methodology 5
X. Expected Outcomes 8
Content Page Number
XI. Appendices 9
I. Project Title
• A concise and descriptive title reflecting the purpose of the project.
Example: "Clean and Green Barangay: A Community Solid Waste Management Initiative"
II. Proponents
• Names of students or group members submitting the proposal.
Example: NSTP Section A, Group 3
V. Project Rationale
• Explain why the project is necessary, focusing on the community's needs and how the
project addresses them.
Example:
"Barangay Malinis faces challenges with waste disposal, leading to clogged drainage and
increased health risks. This project aims to promote proper waste management practices
and create a cleaner, safer environment for the residents."
VI. Objectives
• State the specific and measurable goals of the project.
Example:
1. To educate residents on proper waste segregation practices.
2. To organize a barangay-wide clean-up drive.
3. To establish a sustainable waste management system (e.g., composting and
recycling).
VII. Methodology
• Describe how the project will be implemented step-by-step.
Example:
1. Pre-Implementation:
▪ Coordinate with barangay officials.
▪ Conduct a needs assessment through surveys and interviews.
2. Implementation:
▪ Organize a seminar on waste segregation.
▪ Facilitate a clean-up drive.
▪ Distribute trash bins labeled for segregation.
3. Post-Implementation:
▪ Monitor the community’s waste management practices.
▪ Evaluate the project’s impact through feedback and observation.
Total ₱10,500.00
X. Expected Outcomes
• Outline the anticipated results of the project.
Example:
o Improved cleanliness in Barangay Malinis.
o Increased awareness among residents about waste management.
o Reduction in waste-related health issues.
XI. Appendices
• Attach any supporting documents, such as:
o Survey results or needs assessment data.
o Photos of the project site.
o Letters of support from barangay officials.