Disassembling and adjustment of
B240P series components
--Pipettor
ITSD
FOCUS MAKES PROFESSION
01 Introduction
02 Disassemble steps
03 Motor and sensors
04 01-E01 board
05 Replacement of pipetting needle
FOCUS MAKES PROFESSION
1. Introduction
Sample & Reagent probe
Motion mechanism
2. Disassemble steps
1. disconnect the linking pipeline. 2. remove these four screws.
2. Disassemble steps
3. disconnect these two black cables 4. Take the pipettor out gently and slowly.
3. Motor and sensors
the motor for the
horizontal movement of
Sample & Reagent Probe
the motor for the vertical
movement of Sample &
Reagent Probe
6
3.Motor and sensors
Initialization sensor of
horizontal movement
3.Motor and sensors
Initialization sensor of
vertical movement
4. 01-E01 board
Yellow cable :
Liquid level detection signal cable
cables for motors
cables for Signal and power cable
initialization sensor
5. Replacement of pipetting needle
2
1
3
Replacement of pipetting needle:
1. Loose the screw of the tubing
2. Loose the screw which fixed the needle in the pipetting arm
3. Remove the cable