The document outlines the course structure for 'Estimating, Costing and Valuation' (Course Code: 314313) in civil engineering, detailing its rationale, expected outcomes, learning objectives, and assessment schemes. It emphasizes the importance of accurate estimation and costing in construction projects and includes specific learning outcomes related to measurement, estimation methods, rate analysis, and valuation. The course aims to equip students with the necessary skills to effectively manage project costs and resources using modern techniques and software.

Uploaded by

ae5418520
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
796 views9 pages

Estimating Costing and Valuation

The document outlines the course structure for 'Estimating, Costing and Valuation' (Course Code: 314313) in civil engineering, detailing its rationale, expected outcomes, learning objectives, and assessment schemes. It emphasizes the importance of accurate estimation and costing in construction projects and includes specific learning outcomes related to measurement, estimation methods, rate analysis, and valuation. The course aims to equip students with the necessary skills to effectively manage project costs and resources using modern techniques and software.

Uploaded by

ae5418520
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

1/10/25, 10:05 AM 314313-ESTIMATING, COSTING AND VALUATION

10-01-2025 10:05:11 AM

ESTIMATING, COSTING AND VALUATION Course Code : 314313


: Civil Engineering/ Civil & Rural Engineering/ Construction Technology/ Civil &
Programme Name/s
Environmental Engineering/
Programme Code : CE/ CR/ CS/ LE
Semester : Fourth
Course Title : ESTIMATING, COSTING AND VALUATION
Course Code : 314313

I. RATIONALE
In the construction of any civil engineering structure, estimating, costing, and valuation are the fundamental
processes that provide valuable insights and support to project planning, budgeting, resource allocation, decision-
making, contract negotiation, compliance, performance evaluation, and investment analysis. Today being the era of
technology, a provision is also required to be made to implement the above mentioned processes through the use of
the various software for achieving the speedy determination of quantities with inbuilt accuracy and precision. This
course is specifically designed to develop the basic competencies among the learners to discharge their duties in the
field with high efficiency and effectiveness to mitigate risks in projects and thereby to achieve the strategic
objective.

II. INDUSTRY / EMPLOYER EXPECTED OUTCOME


Estimate for the given construction materials, labor, and resources required for construction projects accurately.

III. COURSE LEVEL LEARNING OUTCOMES (COS)


Students will be able to achieve & demonstrate the following COs on completion of course based learning

CO1 - Use the relevant modes of measurements for the given item of work.
CO2 - Prepare approximate estimate of a civil engineering works.
CO3 - Prepare detailed estimate of a civil engineering works.
CO4 - Fix the rate for the given item of work using relevant rate analysis technique.
CO5 - Conduct the process of the valuation for the specified purpose.

IV. TEACHING-LEARNING & ASSESSMENT SCHEME


Learning Scheme Assessment Scheme
Actual
Based on LL &
Contact Based on
Theory TL
Course Course Hrs./Week SL
Course Title Abbr Credits Paper Total
Code Category/s SLH NLH Practical
Duration Marks
FA- SA-
CL TL LL Total FA-PR SA-PR SLA
TH TH
Max Max Max Min Max Min Max Min Max Min
ESTIMATING,
314313 COSTING AND ECV DSC 4 - 4 - 8 4 4 30 70 100 40 50 20 25# 10 - - 175
VALUATION

MSBTE Approval Dt. 21/11/2024 Semester - 4, K Scheme


https://services.msbte.edu.in/scheme_digi/pdfdownload/download/ 1/9
1/10/25, 10:05 AM 314313-ESTIMATING, COSTING AND VALUATION
10-01-2025 10:05:11 AM

ESTIMATING, COSTING AND VALUATION Course Code : 314313


Total IKS Hrs for Sem. : 0 Hrs
Abbreviations: CL- ClassRoom Learning , TL- Tutorial Learning, LL-Laboratory Learning, SLH-Self Learning
Hours, NLH-Notional Learning Hours, FA - Formative Assessment, SA -Summative assessment, IKS - Indian
Knowledge System, SLA - Self Learning Assessment
Legends: @ Internal Assessment, # External Assessment, *# On Line Examination , @$ Internal Online
Examination
Note :

1. FA-TH represents average of two class tests of 30 marks each conducted during the semester.
2. If candidate is not securing minimum passing marks in FA-PR of any course then the candidate shall be
declared as "Detained" in that semester.
3. If candidate is not securing minimum passing marks in SLA of any course then the candidate shall be
declared as fail and will have to repeat and resubmit SLA work.
4. Notional Learning hours for the semester are (CL+LL+TL+SL)hrs.* 15 Weeks
5. 1 credit is equivalent to 30 Notional hrs.
6. * Self learning hours shall not be reflected in the Time Table.
7. * Self learning includes micro project / assignment / other activities.

V. THEORY LEARNING OUTCOMES AND ALIGNED COURSE CONTENT


Suggested
Theory Learning Outcomes Learning content mapped with Theory Learning
Sr.No Learning
(TLO's)aligned to CO's. Outcomes (TLO's) and CO's.
Pedagogies.
TLO 1.1 Justify the
importance of an
Administrative Approval and
Technical Sanction in civil
Unit - I Basics of Estimating and costing
engineering projects.
1.1 Introduction: Estimating, Types and purpose,
TLO 1.2 Perform the role of
costing, Administrative Approval, Technical Sanction
an estimator in civil
and Budget provision.
engineering projects
1.2 Roles and responsibility of Estimator.
TLO 1.3 Write the detailed
1.3 SSR: Meaning, Purpose, Checklist and Detailed Lecture Using
specifications for the given
Specification of items of work in load bearing and Chalk-Board
construction project.
1 framed structure as per the Execution. Presentations
TLO 1.4 Undertake the
1.4 Modes of measurement and desired accuracy in Video
relevant modes of
measurements of different items of work as per IS: Demonstrations
measurement as per IS 1200
1200.
TLO 1.5 Apply the rule of
1.5 Rules for deduction in Masonry work, Plastering
deduction for the given
and Pointing and Painting work as per IS: 1200.
construction work as per IS:
1.6 Standard formats of Measurement sheet, Abstract
1200
sheet, Face sheet.
TLO 1.6 Use the various
formats of measurements and
bill of quantities for the given
work.

MSBTE Approval Dt. 21/11/2024 Semester - 4, K Scheme


https://services.msbte.edu.in/scheme_digi/pdfdownload/download/ 2/9
1/10/25, 10:05 AM 314313-ESTIMATING, COSTING AND VALUATION
10-01-2025 10:05:11 AM

ESTIMATING, COSTING AND VALUATION Course Code : 314313


Suggested
Theory Learning Outcomes Learning content mapped with Theory Learning
Sr.No Learning
(TLO's)aligned to CO's. Outcomes (TLO's) and CO's.
Pedagogies.
TLO 2.1 Specify the purpose Unit - II Approximate Estimate
of an approximate estimate in 2.1 Approximate estimate: Definition, Purpose, types.
the given civil engineering 2.2 Methods of approximate estimate: Service unit
project. method, Plinth area rate method, Cubical content Lecture Using
TLO 2.2 Use relevant type of method, Typical bay method, Approximate quantity Chalk-Board
2 method to prepare an method. (Numerical on any one method out of Service Presentations
approximate estimate unit method, Plinth area rate method, Typical bay Flipped
TLO 2.3 Prepare an method). Classroom
approximate estimate for the 2.3 Approximate estimate for roads, Railways,
given civil engineering bridges/culvert, irrigation projects and water supply
structure. projects.
Unit - III Preparation of Detailed Estimate
TLO 3.1 Explain the 3.1 Detailed Estimate: Definition and Purpose, Data
procedure of the detailed required for detailed estimate, Procedure of preparation
estimate for the given project. of detailed estimate, taking out quantities and
TLO 3.2 Classify the detailed Abstracting in prescribed format.
estimate based on the purpose 3.2 Types and Uses of detailed Estimates: Revised
of civil work. estimate, supplementary estimate, revised and
TLO 3.3 Propose the relevant supplementary estimate, repair and maintenance
method of detailed estimate estimate.
for the given project. 3.3 Methods of Detailed Estimate- a) Unit quantity
TLO 3.4 Determine the method and total quantity method. b) Long wall and
quantities for given Load Short wall method (out to out and in to in method or Lecture Using
bearing structure. PWD method), Centre line method. Chalk-Board
TLO 3.5 Calculate the 3.4 Calculate the quantities of the given items for the Presentations
3 quantities of given component given load bearing structure. Video
of RCC framed structure. 3.5 Calculate the quantities of the given items for the Demonstrations
TLO 3.6 Prepare the bar given RCC framed structure. Site/Industry Visit
bending schedule for the given 3.6 Bar bending schedule, Rebar: Meaning, Purposes. Case Study
component of RCC project. 3.7 Steel requirement for footing, column, beam,
TLO 3.7 Estimate the steel Lintel, chajja and slab, Determination of rebar
requirement of given building quantities as per IS 2502:1963.
component. 3.8 Provisions in detailed estimate: contingencies,
TLO 3.8 Prepare the bill of work charged establishment, centage charges, water
quantity for the given civil supply and sanitary Charges and electrification
work. charges.
TLO 3.9 Calculate the 3.9 Earthwork : Quantities for roads, Bunds and canal
earthwork quantity for the by Mid sectional area method, Mean sectional area
given civil Engineering work. method, Prismoidal formula method and trapezoidal
formula method.

MSBTE Approval Dt. 21/11/2024 Semester - 4, K Scheme


https://services.msbte.edu.in/scheme_digi/pdfdownload/download/ 3/9
1/10/25, 10:05 AM 314313-ESTIMATING, COSTING AND VALUATION
10-01-2025 10:05:11 AM

ESTIMATING, COSTING AND VALUATION Course Code : 314313


Suggested
Theory Learning Outcomes Learning content mapped with Theory Learning
Sr.No Learning
(TLO's)aligned to CO's. Outcomes (TLO's) and CO's.
Pedagogies.
TLO 4.1 Explain the
importance of rate analysis in Unit - IV Rate Analysis
civil engineering. 4.1 Rate Analysis: Definition, purpose, importance and
TLO 4.2 Justify the factors affecting.
importance of sundry charges 4.2 Sundry Expenses: Lead (Standard and Extra), lift,
in the estimate of the civil overhead charges, water charges and contractors profit. Lecture Using
work 4.3 Procedure of rate analysis market rate Chalk-Board
TLO 4.3 Fix the market rate of determination etc. Presentations
4 a given item of work using 4.4 Task work- Definition, factors Affecting, types, Video
relevant rate analysis method Task work of different skilled labor for different items. Demonstrations
TLO 4.4 Assign different 4.5 Categories of labors, their daily wages, types and Flipped
skilled labor for different items number of labors for different items of work. Classroom
TLO 4.5 Deploy the relevant 4.6 Preparing rate analysis of different items of work:
type of manpower for the PCC, RCC work in (column, beam, lintel, slab), brick
specified work. masonry, stone masonry, Vitrified tile flooring,
TLO 4.6 Prepare rate analysis plastering.
for the given items of work.
TLO 5.1 Explain the purpose
of valuation of the given civil
structure. Unit - V Valuation
TLO 5.2 Differentiate between 5.1 Definition and purpose of Valuation, role of valuer.
the terms, “cost, value and 5.2 Define: Cost, Price and Value, Characteristics of
price” with their significance Value, Factors Affecting Value.
in civil engineering. 5.3 Types of Value: Book Value, Scrap Value, Salvage
TLO 5.3 Classify the value of Value, Speculative Value, Distress Value, Market
the given structure. Value, monopoly Value, Sentimental Value.
TLO 5.4 Calculate the 5.4 Depreciation, Obsolescence, Sinking Fund.
Presentations
depreciation of the cost of the Methods of Calculation of Depreciation : Straight Line
5 Case Study
given structure using relevant Method, Sinking Fund Method, Constant Percentage
Site/Industry Visit
method of depreciation. Method.
TLO 5.5 Compute the 5.5 Computation of capitalized value, Gross income,
capitalized value of the Outgoings, Net Income, Year Purchase, Types of
structure based on given data. outgoings.
TLO 5.6 Calculate monthly 5.6 Fixation of rent as per PWD Norms and Practice.
rent of the given building as 5.7 Lease : types of lease, lease hold property and free
per PWD norms. hold property, Mortgage : Mortgage deed, precautions
TLO 5.7 Signify the to be taken while making mortgage.
importance of the terms,
“Lease and Mortgage”.

VI. LABORATORY LEARNING OUTCOME AND ALIGNED PRACTICAL / TUTORIAL EXPERIENCES.


Practical / Tutorial / Laboratory Learning Sr Laboratory Experiment / Practical Titles / Number Relevant
Outcome (LLO) No Tutorial Titles of hrs. COs
LLO 1.1 Prepare the check list of items to
be executed with market rates and units for Prepare the checklist of items from given
1 2 CO1
detailed estimate of the given structure from drawing.
the given drawing.

MSBTE Approval Dt. 21/11/2024 Semester - 4, K Scheme


https://services.msbte.edu.in/scheme_digi/pdfdownload/download/ 4/9
1/10/25, 10:05 AM 314313-ESTIMATING, COSTING AND VALUATION
10-01-2025 10:05:11 AM

ESTIMATING, COSTING AND VALUATION Course Code : 314313


Practical / Tutorial / Laboratory Learning Sr Laboratory Experiment / Practical Titles / Number Relevant
Outcome (LLO) No Tutorial Titles of hrs. COs
LLO 2.1 Analyze the SSR of into relevant
*Analysis of SSR for any five item of
categories and subcategories of construction 2 2 CO1
construction.
activities.
LLO 3.1 Prepare the approximate estimate
*Prepare approximate estimate by using
for the given civil engineering works. 3 2 CO2
service unit method.
(service unit method )
LLO 4.1 Prepare the approximate estimate
*Prepare approximate estimate by
for the given civil engineering works. 4 2 CO2
using Typical bay method.
(Typical bay method)
LLO 5.1 Use long wall short wall method to
*Determine the quantities for Excavation,
determine the quantity of items of work
PCC ,UCR, DPC of 1BHK load bearing
(Excavetion,PCC ,UCR,DPC) using 5 2 CO3
residential building using long wall short
standard measurement sheet for 1BHK load
wall method. (Part I)
bearing residential Building (Part-I).
LLO 6.1 Use long wall short wall method to
determine the quantity of items of work *Determine the quantities for Brick Work,
(Brick Work,Plastering, flooring, slab Plastering, flooring, slab of 1BHK load
6 2 CO3
)using standard measurement sheet for bearing residential building using long wall
1BHK load bearing residential Building short wall method. (Part II)
(Part-II
LLO 7.1 Use Center line method to
Determine the quantities for Excavation,
determine the quantity of items of work
PCC ,UCR,DPC of 1BHK load bearing
(Excavetion,PCC ,UCR,DPC) using 7 2 CO3
residential building using Center line
standard measurement sheet for 1BHK load
method (Part I).
bearing residential Building. (Part-I)
LLO 8.1 Use Center line method to
Determine the quantities for Brick Work,
determine the quantity of items of work
Plastering, flooring, slab of 1BHK load
(Brick Work,Plastering, flooring, slab)using 8 2 CO3
bearing residential building using Center
standard measurement sheet for 1BHK load
line method (Part II).
bearing residential Building (Part-II)
LLO 9.1 Prepare detailed estimate for RCC *Prepare detailed estimate with abstract for
(G+1) residential framed structure from the 9 RCC (G+1) residential framed structure. 2 CO3
given drawing. (Part-I) (Part I) (Manual)
LLO 10.1 Prepare detailed estimate for *Prepare detailed estimate with abstract for
RCC (G+1) residential framed structure 10 RCC (G+1) residential framed structure. 2 CO3
from the given drawing. (Part-II) (Part II) (Manual)
LLO 11.1 Use the relevant open source *Prepare detailed estimate with abstract for
software to prepare detailed estimate for RCC (G+1) residential framed structure
11 2 CO3
RCC (G+1) residential framed structure using relevant available open source
from the given drawing. (Part-I) Software.(Part-I)
LLO 12.1 Use the relevant open source Prepare detailed estimate with abstract for
software to prepare detailed estimate for RCC (G+1) residential framed structure
12 2 CO3
RCC (G+1) residential framed structure using relevant available open source
from the given drawing. (Part-II) software.(Part-II)
LLO 13.1 Calculate the reinforcement Prepare the bar bending schedule with
quantities for footing of a room size for 4 m 13 reinforcement estimate for the footing of 2 CO3
X 5 m from the given set of drawings. given structure.

MSBTE Approval Dt. 21/11/2024 Semester - 4, K Scheme


https://services.msbte.edu.in/scheme_digi/pdfdownload/download/ 5/9
1/10/25, 10:05 AM 314313-ESTIMATING, COSTING AND VALUATION
10-01-2025 10:05:11 AM

ESTIMATING, COSTING AND VALUATION Course Code : 314313


Practical / Tutorial / Laboratory Learning Sr Laboratory Experiment / Practical Titles / Number Relevant
Outcome (LLO) No Tutorial Titles of hrs. COs
LLO 14.1 Calculate the reinforcement *Prepare the bar bending schedule with
quantities for column of a room size for 4 m 14 reinforcement estimate for the column of 2 CO3
X 5 m from the given set of drawing. given structure.
LLO 15.1 Calculate the reinforcement Prepare the bar bending schedule with
quantities for beam of a room size for 4 m 15 reinforcement estimate for the beam of 2 CO3
X 5 m from the given set of drawing. given structure.
LLO 16.1 Calculate the reinforcement *Prepare the bar bending schedule with
quantities for slab of a room size for 4 m X 16 reinforcement estimate for the slab of given 2 CO3
5 m from the given set of drawing. structure.
LLO 17.1 Estimate the steel quantity from Prepare the bar bending schedule with
the given drawing using IS code 2502-1963 17 reinforcement estimate for rebaring of 2 CO3
for rebaring of beam structural members. beam to be extended.
LLO 18.1 Estimate the steel quantity from Prepare the bar bending schedule with
the given drawing using IS code 2502-1963 18 reinforcement estimate for rebaring of 2 CO3
for rebaring of column structural members. column to be extended.
LLO 19.1 Use the Trapezoidal method to *Determine the earth work quantity in
determine the earth work quantity in 19 embankment and cutting using Trapezoidal 2 CO3
embankment and cutting. method.
LLO 20.1 Use the Prismoidal method to Determine the earth quantity in
determine the earth work quantity in 20 embankment and in cutting using 2 CO3
embankment and cutting. Prismoidal method.
LLO 21.1 Use the mid sectional area *Determine the earth work quantity in
method to determine the earth work 21 embankment and in cutting using mid 2 CO3
quantity in embankment and cutting sectional area method.
LLO 22.1 Use the mean area method to Determine the earth work quantity in
determine the earth work quantity in 22 embankment and cutting using mean area 2 CO3
embankment and cutting. method.
LLO 23.1 Use the relevant open source Prepare the detailed estimate of W.B.M.
software to prepare detailed estimate of the 23 Road using relevant open source software 2 CO3
WBM Road. (Part I) (Part I)
LLO 24.1 Use the relevant open source Prepare the detailed estimate of W.B.M.
software to prepare detailed estimate of the 24 Road using relevant open source software 2 CO3
WBM Road. (Part II) (Part II)
LLO 25.1 Prepare the detailed estimate for
Prepare the detailed estimate for small
small septic tank from given set of drawing. 25 2 CO3
septic tank (Part I)
(Part I)
LLO 26.1 Prepare the rate analysis for the *Prepare the rate analysis for the given five
26 2 CO3
given five item of work. item of work.
*Carry out survey and prepare a report
LLO 27.1 Carry out survey of different
on different Categories and types of
categories of labor it's types, and no of labor
27 labor required for completion of 2 CO4
for different item of work on site and
various items of work on site.
prepare its report..
(visit and compare any three sites).
LLO 28.1 Prepare the chart reflecting all Create a chart reflecting all values
values pertaining to valuation of residential 28 pertaining to valuation of residential 2 CO5
building with their significance. building with their significance.

MSBTE Approval Dt. 21/11/2024 Semester - 4, K Scheme


https://services.msbte.edu.in/scheme_digi/pdfdownload/download/ 6/9
1/10/25, 10:05 AM 314313-ESTIMATING, COSTING AND VALUATION
10-01-2025 10:05:11 AM

ESTIMATING, COSTING AND VALUATION Course Code : 314313


Practical / Tutorial / Laboratory Learning Sr Laboratory Experiment / Practical Titles / Number Relevant
Outcome (LLO) No Tutorial Titles of hrs. COs
LLO 29.1 Determine the valuation of a
*Prepare the valuation report for the given
given structure and submits the valuation 29 2 CO5
building.
report in prescribed formats.
LLO 30.1 Determine the monthly rent of
*Determine the monthly rent of the given
the given area of the building from the 30 2 CO5
area of building from the given data.
given data.
Note : Out of above suggestive LLOs -
'*' Marked Practicals (LLOs) Are mandatory.
Minimum 80% of above list of lab experiment are to be performed.
Judicial mix of LLOs are to be performed to achieve desired outcomes.

VII. SUGGESTED MICRO PROJECT / ASSIGNMENT/ ACTIVITIES FOR SPECIFIC LEARNING /


SKILLS DEVELOPMENT (SELF LEARNING)

Micro project

Enlist the minimum ten salient provisions made in IS:1200 with special reference to load bearing structure.
Enlist the minimum ten salient provisions made in IS:1200 with special reference to Framed structure.
Prepare detailed estimate of minimum one load bearing structure using available open source software.
Rate analysis by analyzing no of labor required for different items of civil works such as 10 cu. m excavation,
cement concrete in foundation, Bricks work, rubble stone masonry works. Etc. and 100 m2 12mm thick plastering, 20
mm thick Damp proof course, cement pointing, white washing etc.
Collect the rebar reinforcement drawings of minimum one building and interpret the drawings with report.
Prepare rate analysis of Painting work for OBD, Plastic emulsion, Oil paint, luster paint having minimum 150 m2
area.
Prepare approximate estimate of minimum one residential building.
Prepare valuation report of minimum one residential building.
Workout quantities of cement, sand and bricks for 30 m3,40m3.50m3,60m3 in cement mortar 1:6

Note :

Above is just a suggestive list of microprojects and assignments; faculty must prepare their own bank of
microprojects, assignments, and activities in a similar way.
The faculty must allocate judicial mix of tasks, considering the weaknesses and / strengths of the student in
acquiring the desired skills.
If a microproject is assigned, it is expected to be completed as a group activity.
SLA marks shall be awarded as per the continuous assessment record.
For courses with no SLA component the list of suggestive microprojects / assignments/ activities are
optional, faculty may encourage students to perform these tasks for enhanced learning experiences.
If the course does not have associated SLA component, above suggestive listings is applicable to Tutorials
and maybe considered for FA-PR evaluations.

VIII. LABORATORY EQUIPMENT / INSTRUMENTS / TOOLS / SOFTWARE REQUIRED


Sr.No Equipment Name with Broad Specifications Relevant LLO Number
1 Computer systems with internet connection 3
2 Available Software of estimating and Costing. 3

MSBTE Approval Dt. 21/11/2024 Semester - 4, K Scheme


https://services.msbte.edu.in/scheme_digi/pdfdownload/download/ 7/9
1/10/25, 10:05 AM 314313-ESTIMATING, COSTING AND VALUATION
10-01-2025 10:05:11 AM

ESTIMATING, COSTING AND VALUATION Course Code : 314313

IX. SUGGESTED WEIGHTAGE TO LEARNING EFFORTS & ASSESSMENT PURPOSE (Specification


Table)
Aligned Learning R- U- A- Total
Sr.No Unit Unit Title
COs Hours Level Level Level Marks
Basics of Estimating and
1 I CO1 6 2 4 0 6
costing
2 II Approximate Estimate CO2 8 0 4 4 8
Preparation of Detailed
3 III CO3 24 6 14 10 30
Estimate
4 IV Rate Analysis CO4 12 4 4 6 14
5 V Valuation CO5 10 2 4 6 12
Grand Total 60 14 30 26 70

X. ASSESSMENT METHODOLOGIES/TOOLS

Formative assessment (Assessment for Learning)

Two-unit tests of 30 marks will be conducted and average of two-unit test considered.for formative assessment of
exercises writing 50 marks.each exercises will be assessed considering appropriate % weightage to process and
product and other instructions of assessments.

Summative Assessment (Assessment of Learning)

Term Work, Practical Exam, Oral and Written End semester Exam

XI. SUGGESTED COS - POS MATRIX FORM


Programme
Specific
Programme Outcomes (POs)
Outcomes*
(PSOs)
Course PO-5
Outcomes PO-1 Basic Engineering
(COs) PO-3 PO-7
and PO-2 PO-4 Practices for
Design/ PO-6 Project Life PSO- PSO- PSO-
Discipline Problem Engineering Society,
Development Management Long 1 2 3
Specific Analysis Tools Sustainability
of Solutions Learning
Knowledge and
Environment
CO1 2 - 1 1 1 1 2
CO2 2 3 2 1 1 3 3
CO3 3 3 3 3 1 3 3
CO4 3 3 2 2 1 3 3
CO5 3 2 1 3 3 2 3
Legends :- High:03, Medium:02,Low:01, No Mapping: -
*PSOs are to be formulated at institute level

XII. SUGGESTED LEARNING MATERIALS / BOOKS


Sr.No Author Title Publisher with ISBN Number
MSBTE Approval Dt. 21/11/2024 Semester - 4, K Scheme
https://services.msbte.edu.in/scheme_digi/pdfdownload/download/ 8/9
1/10/25, 10:05 AM 314313-ESTIMATING, COSTING AND VALUATION
10-01-2025 10:05:11 AM

ESTIMATING, COSTING AND VALUATION Course Code : 314313


Sr.No Author Title Publisher with ISBN Number
Estimating and Costing in Civil UBS Publishers Distributors Pvt. Ltd. New Delhi.
1 Datta, B.N.
engineering ISBN:9788174767295
Estimating and costing, specification Monojit Chakraborti, Kolkata (2006) ISBN-10:
2 Chakraborti,M.
and valuation in civil engineering 818530436X ISBN-13: 978-8185304366
Civil Engineering Contracts and Orient Longman, Mumbai, Ed.2010 ISBN:
3 Patil, B.S.
Estimates 9788173715594, 8173715599
Charotar Publishing House Pvt. Limited (2008)
4 Rangwala,S.C. Valuation of Real Properties
ISBN:9788185594774, 8185594775
Dhanpat Rai Publishing Company(P)
5 Birdie,G.S. Estimating and Costing
Ltd.NewDelhi110002 ISBN : 978-93-84378-13-4

XIII . LEARNING WEBSITES & PORTALS


Sr.No Link / Portal Description
Schedule Rate (DSR) Maharashtra Jeevan
1 https://mjp.maharashtra.gov.in/schedule-rate-dsr/
Pradhikaran
CPWD in house codes, manuals,
2 https://mjp.maharashtra.gov.in/schedule-rate-dsr/ schedules, technical specifications, design
manuals and technical publications.
3 https://www.microsoft.com/en-in/microsoft-365/excel Microsoft Excel 365 open source software
4 https://www.youtube.com/watch?v=IoBd5UhGifs Full Building Estimation in Excel sheet
https://youtube.com/playlist?
5 list=PLMCExauCXvoOGL3nP49ee_-Ua Estimating, Costing and Valuation
tf1PAJ8q&si=N4gNlyNL3PzLvRTx
Sinking Fund / Book Value / Scrap Value /
6 https://www.youtube.com/watch?v=iry2zEoPvsU
Market Value / Salvage Value / Valuation
Rate Analysis Of Civil Work | How to
7 https://www.youtube.com/watch?v=C6O09yOa45c Prepare Rate Analysis | Rate Analysis for
1000 sqft house plan
https://www.youtube.com/watch?
Administrative approval, Technical
8 v=H5qIwRCOFn4&list=PLv20kpHlal
sanction and Budget provision
H1zD-oueYjooR-KdO6q_NLa&index=4
https://www.youtube.com/watch?
Types of estimates - Approximate estimate
9 v=ZAnIaZIMGtw&list=PLv20kpHlal
and Detailed estimate
H1zD-oueYjooR-KdO6q_NLa&index=5
Valuation of a Property / What is the
10 https://www.youtube.com/watch?v=-BRwUs27ByY purpose of Valuation / What factors
affecting Valuation
http://acl.digimat.in/nptel/courses/video/124105015/lec40.pd
11 Rebar Detailing
f
Note :

Teachers are requested to check the creative common license status/financial implications of the suggested
online educational resources before use by the students

MSBTE Approval Dt. 21/11/2024 Semester - 4, K Scheme

https://services.msbte.edu.in/scheme_digi/pdfdownload/download/ 9/9

You might also like