LF RPT

The document is a load flow and voltage drop analysis report generated by SKM Power*Tools for Windows, intended for review by registered engineers. It includes detailed information on voltage criteria, generator data, and voltage drop analysis across various buses and branches. The report highlights voltage drops, projected power flows, and losses through feeders, providing a comprehensive overview of the electrical system's performance.

Uploaded by

estevaomoraes
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views10 pages

LF RPT

The document is a load flow and voltage drop analysis report generated by SKM Power*Tools for Windows, intended for review by registered engineers. It includes detailed information on voltage criteria, generator data, and voltage drop analysis across various buses and branches. The report highlights voltage drops, projected power flows, and losses through feeders, providing a comprehensive overview of the electrical system's performance.

Uploaded by

estevaomoraes
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

Mar 22, 2025 16:55:40

------------------------------------------------------------------------------
ALL INFORMATION PRESENTED IS FOR REVIEW, APPROVAL
INTERPRETATION AND APPLICATION BY A REGISTERED ENGINEER ONLY
SKM DISCLAIMS ANY RESPONSIBILITY AND LIABILITY RESULTING
FROM THE USE AND INTERPRETATION OF THIS SOFTWARE.
------------------------------------------------------------------------------
SKM POWER*TOOLS FOR WINDOWS
LOAD FLOW AND VOLTAGE DROP ANALYSIS REPORT
COPYRIGHT SKM SYSTEMS ANALYSIS, INC. 1995-2012
------------------------------------------------------------------------------
Mar 22, 2025 16:55:40 PAGE 2

*** SOLUTION COMMENTS ***


=========================

SOLUTION PARAMETERS

BRANCH VOLTAGE CRITERIA : 3.00 %


BUS VOLTAGE CRITERIA : 5.00 %

UTILITY IMPEDANCE : YES


TRANSFORMER PHASE SHIFT : NO
LTC TRANSFORMER : NO
CALCULATION NETHOD : Newton Method
SOLUTION METHOD : APPROXIMATION
ALL PU VALUES ARE EXPRESSED ON A 100 MVA BASE
LOAD FLOW IS BASED ON CONNECTED LOADS.
LOAD ANALYSIS INCLUDES ALL LOADS.
<<PERCENT VOLTAGE DROPS ARE BASED ON NOMINAL DESIGN VOLTAGES>>

SWING GENERATORS
SOURCE NAME VOLTAGE ANGLE
================================
UTIL-0002 1.000 0.00
GEN-0001 1.000 0.00
440 VCA 1.000 0.00

PV GENERATORS
SOURCE NAME VOLTAGE kW kVARMIN kVARMAX PARTICIPATION
==================================================================

BUS VOLTAGE CONVERGENCY CRITERIA: 0.00001000 PU

LARGEST BUS VOLTAGE MISMATCH BUS-0037 -0.05630019 PU


LARGEST BUS VOLTAGE MISMATCH BUS-0037 0.00021644 PU
LARGEST BUS VOLTAGE MISMATCH BUS-0037 0.00000000 PU
Mar 22, 2025 16:55:40 PAGE 3

BALANCED VOLTAGE DROP AND LOAD FLOW ANALYSIS (SWING GENERATORS)


***********************************************************************************
SOURCE VOLTAGE ANGLE KW KVAR VD% (UTILITY IMPEDANCE)

UTIL-0002 1.000 0.00 82.55 61.74 0.72 1.23298 +j 9.86384


GEN-0001 1.000 0.00 -0.00 -0.00 0.00 6.66667 +j 100.00001
440 VCA 1.000 0.00 234.74 77.80 0.90 0.39731 +j 9.93266
Mar 22, 2025 16:55:40 PAGE 4

BALANCED VOLTAGE DROP AND LOAD FLOW ANALYSIS (PV GENERATOR SCHEDULE REPORT)
***********************************************************************************
---VOLTAGE--- -KVAR LIMITS- ---ACTUAL----
PV SOURCE NAME SCHED. ACTUAL MIN MAX KW KVAR
Mar 22, 2025 16:55:40 PAGE 5

BALANCED VOLTAGE DROP AND LOAD FLOW ANALYSIS

*******************************************************************************************
*****
VOLTAGE EFFECT ON LOADS MODELED
VOLTAGE DROP CRITERIA: BRANCH = 3.00% BUS = 5.00%

==== BUS: BUS-0001 DESIGN VOLTS: 440 BUS VOLTS: 435 %VD: 1.04
======================== PU BUS VOLTAGE: 0.990 ANGLE: -1.3 DEGREES

LOAD FROM: BUS-0048 CBL-0004 FEEDER AMPS: 327.4 VOLTAGE DROP: 1. %VD:
0.14
PROJECTED POWER FLOW: 234.4 KW 77.6 KVAR 246.9 KVA 0.95 LAGGING
LOSSES THRU FEEDER: 0.3 KW 0.2 KVAR 0.4 KVA

LOAD TO: BUS-0045 CBL-0029 FEEDER AMPS: 26.5 VOLTAGE DROP: 0. %VD:
0.11
PROJECTED POWER FLOW: 16.0 KW 12.0 KVAR 20.0 KVA 0.80 LAGGING
LOSSES THRU FEEDER: 0.0 KW 0.0 KVAR 0.0 KVA

LOAD TO: BUS-0044 CBL-0030 FEEDER AMPS: 0.0 VOLTAGE DROP: 0. %VD:
0.00
PROJECTED POWER FLOW: 0.0 KW 0.0 KVAR 0.0 KVA 0.00 LAGGING
LOSSES THRU FEEDER: 0.0 KW 0.0 KVAR 0.0 KVA

LOAD TO: BUS-0002 XF2-0001 TRANSF AMPS: 302.4 VOLTAGE DROP: 8. %VD:
1.88
PROJECTED POWER FLOW: 218.4 KW 65.6 KVAR 228.0 KVA 0.96 LAGGING
LOSSES THRU TRANSF: 2.1 KW 8.6 KVAR 8.9 KVA

==== BUS: BUS-0002 DESIGN VOLTS: 380 BUS VOLTS: 369 %VD: 2.92
======================== PU BUS VOLTAGE: 0.971 ANGLE: -3.3 DEGREES

LOAD TO: BUS-0003 CBL-0001 FEEDER AMPS: 350.1 VOLTAGE DROP: 0. %VD:
0.01
PROJECTED POWER FLOW: 216.3 KW 57.0 KVAR 223.7 KVA 0.97 LAGGING
LOSSES THRU FEEDER: 0.0 KW 0.0 KVAR 0.0 KVA

LOAD FROM: BUS-0001 XF2-0001 TRANSF AMPS: 350.1 VOLTAGE DROP: 7. %VD:
1.88
PROJECTED POWER FLOW: 216.3 KW 57.0 KVAR 223.7 KVA 0.97 LAGGING
LOSSES THRU TRANSF: 2.1 KW 8.6 KVAR 8.9 KVA

==== BUS: BUS-0003 DESIGN VOLTS: 380 BUS VOLTS: 369 %VD: 2.93
======================== PU BUS VOLTAGE: 0.971 ANGLE: -3.3 DEGREES
Mar 22, 2025 16:55:40 PAGE 6

BALANCED VOLTAGE DROP AND LOAD FLOW ANALYSIS

*******************************************************************************************
*****
VOLTAGE EFFECT ON LOADS MODELED
VOLTAGE DROP CRITERIA: BRANCH = 3.00% BUS = 5.00%

LOAD FROM: BUS-0002 CBL-0001 FEEDER AMPS: 350.1 VOLTAGE DROP: 0. %VD:
0.01
PROJECTED POWER FLOW: 216.3 KW 57.0 KVAR 223.7 KVA 0.97 LAGGING
LOSSES THRU FEEDER: 0.0 KW 0.0 KVAR 0.0 KVA

LOAD TO: BUS-0037 CBL-0028 FEEDER AMPS: 46.5 VOLTAGE DROP: 1. %VD:
0.20
PROJECTED POWER FLOW: 29.7 KW 0.0 KVAR 29.7 KVA 1.00 LAGGING
LOSSES THRU FEEDER: 0.1 KW 0.0 KVAR 0.1 KVA

BRANCH DIVERSITY LOAD: 186.6 KW 57.0 KVAR

==== BUS: BUS-0006 DESIGN VOLTS: 440 BUS VOLTS: 437 %VD: 0.72
======================== PU BUS VOLTAGE: 0.993 ANGLE: -0.4 DEGREES

LOAD TO: BUS-0008 XF2-0002 TRANSF AMPS: 31.6 VOLTAGE DROP: 15. %VD:
3.39$
PROJECTED POWER FLOW: 19.2 KW 14.2 KVAR 23.9 KVA 0.80 LAGGING
LOSSES THRU TRANSF: 0.7 KW 0.4 KVAR 0.8 KVA

BRANCH DIVERSITY LOAD: -19.2 KW -14.2 KVAR

==== BUS: BUS-0008 DESIGN VOLTS: 380 BUS VOLTS: 364 %VD: 4.11
======================== PU BUS VOLTAGE: 0.959 ANGLE: -0.1 DEGREES

LOAD TO: BUS-0007 CBL-0002 FEEDER AMPS: 36.6 VOLTAGE DROP: 1. %VD:
0.15
PROJECTED POWER FLOW: 18.5 KW 13.8 KVAR 23.1 KVA 0.80 LAGGING
LOSSES THRU FEEDER: 0.0 KW 0.0 KVAR 0.0 KVA

LOAD FROM: BUS-0006 XF2-0002 TRANSF AMPS: 36.6 VOLTAGE DROP: 13. %VD:
3.39$
PROJECTED POWER FLOW: 18.5 KW 13.8 KVAR 23.1 KVA 0.80 LAGGING
LOSSES THRU TRANSF: 0.7 KW 0.4 KVAR 0.8 KVA

==== BUS: BUS-0037 DESIGN VOLTS: 380 BUS VOLTS: 368 %VD: 3.14
======================== PU BUS VOLTAGE: 0.969 ANGLE: -3.3 DEGREES

LOAD FROM: BUS-0003 CBL-0028 FEEDER AMPS: 46.5 VOLTAGE DROP: 1. %VD:
0.20
PROJECTED POWER FLOW: 29.6 KW -0.0 KVAR 29.6 KVA 1.00 LAGGING
LOSSES THRU FEEDER: 0.1 KW 0.0 KVAR 0.1 KVA

BRANCH DIVERSITY LOAD: 29.6 KW -0.0 KVAR


Mar 22, 2025 16:55:40 PAGE 7

BALANCED VOLTAGE DROP AND LOAD FLOW ANALYSIS

*******************************************************************************************
*****
VOLTAGE EFFECT ON LOADS MODELED
VOLTAGE DROP CRITERIA: BRANCH = 3.00% BUS = 5.00%

==== BUS: BUS-0044 DESIGN VOLTS: 440 BUS VOLTS: 435 %VD: 1.04
======================== PU BUS VOLTAGE: 0.990 ANGLE: -1.3 DEGREES

**** NO LOAD SPECIFIED ****

==== BUS: BUS-0045 DESIGN VOLTS: 440 BUS VOLTS: 435 %VD: 1.15
======================== PU BUS VOLTAGE: 0.988 ANGLE: -1.3 DEGREES

LOAD FROM: BUS-0001 CBL-0029 FEEDER AMPS: 26.5 VOLTAGE DROP: 0. %VD:
0.11
PROJECTED POWER FLOW: 16.0 KW 12.0 KVAR 20.0 KVA 0.80 LAGGING
LOSSES THRU FEEDER: 0.0 KW 0.0 KVAR 0.0 KVA

BRANCH DIVERSITY LOAD: 16.0 KW 12.0 KVAR

==== BUS: BUS-0048 DESIGN VOLTS: 440 BUS VOLTS: 436 %VD: 0.90
======================== PU BUS VOLTAGE: 0.991 ANGLE: -1.3 DEGREES
*** SWING GENERATOR:440 VCA 234.74 KW 77.80 KVAR

LOAD TO: BUS-0001 CBL-0004 FEEDER AMPS: 327.4 VOLTAGE DROP: 1. %VD:
0.14
PROJECTED POWER FLOW: 234.7 KW 77.8 KVAR 247.3 KVA 0.95 LAGGING
LOSSES THRU FEEDER: 0.3 KW 0.2 KVAR 0.4 KVA
Mar 22, 2025 16:55:40 PAGE 8

BALANCED VOLTAGE DROP AND LOAD FLOW BUS DATA SUMMARY


***********************************************************************
BUS NAME BASE VOLT PU VOLT BUS NAME BASE VOLT PU VOLT
BUS-0001 440. 0.9896 BUS-0002 380. 0.9708
BUS-0003 380. 0.9707 BUS-0004 440. 1.0000
BUS-0005 440. 0.9928 BUS-0006 440. 0.9928
BUS-0007 380. 0.9575 BUS-0008 380. 0.9589
BUS-0037 380. 0.9686 BUS-0044 440. 0.9896
BUS-0045 440. 0.9885 BUS-0048 440. 0.9910
Mar 22, 2025 16:55:40 PAGE 9

BALANCED VOLTAGE DROP AND LOAD FLOW BRANCH DATA SUMMARY


***************************************************************************************
BRANCH NAME FROM NAME TO NAME TYPE VD% AMPS KVA RATING%
AUTO-0001 BUS-0004 BUS-0005 FDR 0.00 136.24 103.09 UNKOWN
CBL-0001 BUS-0002 BUS-0003 FDR 0.01 350.12 223.72 38.77
CBL-0002 BUS-0008 BUS-0007 FDR 0.15 36.55 23.07 26.11
CBL-0004 BUS-0048 BUS-0001 FDR 0.14 327.44 247.29 31.82
CBL-0028 BUS-0003 BUS-0037 FDR 0.20 46.46 29.68 40.40
CBL-0029 BUS-0001 BUS-0045 FDR 0.11 26.55 20.02 26.55
CBL-0030 BUS-0001 BUS-0044 FDR 0.00 0.00 0.00 0.00
XF2-0001 BUS-0001 BUS-0002 TX2 1.88 302.38 228.05 76.81
XF2-0002 BUS-0006 BUS-0008 TX2 3.39 31.57 23.89 80.20

NOTE: FDR RATING% = % AMPS RATING BASED ON LIBRARY FLA OR BRANCH INPUT FLA
TX2 RATING% = % KVA RATING BASED ON TRANSFORMER NOM/FL KVA

*** T O T A L S Y S T E M L O S S E S ***
3. KW 9. KVAR

***WARNING*** STUDY CONTAINS 2 VOLTAGE CRITERIA VIOLATIONS


VIOLATIONS DENOTED BY ($) AT BUS AND BRANCH %VD LOCATIONS