0% found this document useful (0 votes)
18 views1 page

1571

The TRS Tool Inspection Report for Work Order CTR25/029, dated March 19, 2025, details an inspection conducted by Waqas Babar at the WFT Base Taymsa for Weatherford Oil Tools ME Limited. The inspection utilized various equipment and methodologies, adhering to API standards, and ultimately determined that the tool with serial number 1571 was deemed scrap due to a crack. The report includes calibration due dates for the instruments used and highlights the critical areas inspected.

Uploaded by

tpstrs34
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views1 page

1571

The TRS Tool Inspection Report for Work Order CTR25/029, dated March 19, 2025, details an inspection conducted by Waqas Babar at the WFT Base Taymsa for Weatherford Oil Tools ME Limited. The inspection utilized various equipment and methodologies, adhering to API standards, and ultimately determined that the tool with serial number 1571 was deemed scrap due to a crack. The report includes calibration due dates for the instruments used and highlights the critical areas inspected.

Uploaded by

tpstrs34
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

TRS TOOL INSPECTION REPORT

Work Order No CTR25/029 Date Of Inspection 19-Mar-25 Inspection Report No TRS-250319-05-02 Customer WO no N/A Location WFT Base Taymsa
Rig No TRS Inspected by Waqas Babar QC No QC-05 Customer Weatherford Oil Tools ME Limited
EQUIPMENT & CONSUMABLES USED
AC Yoke Lifting Block Lux Meter Telescoping Gauge Vernier Caliper Feeler Gauge White Contrast Paint Black Ink Solvent remover
Serial No 202407163 TPS-316 S484940 TPS-TSG-04 426383 MW390M20-B MR72 2408012 MR76 2404036 MR85
Calibration Due Date 16-08-2025 19-08-2027 03-05-2025 16-08-2025 16-08-2025 16-08-2025 Aug-29 Apr-29 Dec,2028
METHODOLOGY AND DOCUMENTATION
Specifications Used API RP 8B ,API RP 7L Procedure No TPS-OPS-SOP-02 R 04 Cust Procedure No GL-TRS-OEPS-L4-732/WT-811 Area of Inspection Critical Area Assembled Welded Areas
White Light Intensity >1076 Lux Lighting Type Sunlight Mag Field Direction Longitudinal Technique Wet Visible Continuous

TOOL SERIAL NO 1571 DESCRIPTION 7 5/8 STD JAWS


Inspection Picture / Drawings DIMENSIONAL INSPECTION RESULTS
Dimensions in Inch
Location Description Observed Tolerance Status

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

FINAL STATUS

SCRAP DUE TO CRACK

INSPECTED BY : WAQAS BABAR APPROVED BY : KARTIK

FORM NO :TPS-OPS-FO-70-REV 00 DATED 01 SEP 2024 MT,PT.UT,VT LEVEL II

You might also like