DPS
DPS
APPLICABLE TAG
HP LP
510 510
530A 530A
510 514
577A 577A 514
510 577A 522A
522A 1:
12 12
1: 577A
BOM
522A
522A
SR. ITEM DESCRIPTION SIZE MATERIAL UNIT TOTAL
522A 522A
NO NO QTY QTY
518A 518A
BY INST BY INST
CS as per IS 1239 4 8
1 530A HEX PLUG, 3000# 1/2" NPT(M)
Part 2
BY MECH BY MECH
530A 530A
FORGED EQUAL TEE CS as per
2 577A 1/2" NPT(F) 4 8
3000# IS 1239 Part 2
1/2" O.D. X
5 514 SEAMLESS TUBE SS304 10 M 20 M
1.6mm THICK
UPSTREAM DOWNSTREAM
MALE CONNECTOR 1/2" NPT(M)
6 510 WITH DOUBLE 4 8
(SUITABLE
SS304, 3000#
COMPRESSION TYPE FOR 1/2"
FERRULES & NUT OD TUBE)
DO NOT SCALE
OWNER.
BOP CONTRACTOR.
2. 3-WAY VALVE MANIFOLD (1/2 "NPTF) WILL PUNJ LLOYD LIMITED
BE SUPPLIED ALONG WITH THE INSTRUMENT. GURGAON
PROJECT.
FOR R0 ISSUE ONLY CLEARED
ISSUE REVISIONS DRN APPD DATE FILE NAME :
2 x 300 MW COAL BASED THERMAL
CLEARED CHEM CIVIL ELEC I&C MECH POWER PROJECT AT HALDIA
DEPT SIGNATURE DATE R1 REVISED AS PER CLIENT’S COMMENTS AB SN SB 18-10-2012 ‘P’ (PRELIMINARY) ISSUES ARE NOT TO BE
APPROVED BY
USED FOR CONSTRUCTION / FABRICATION TITLE
BUT ARE ISSUED FOR LIMITED PURPOSES SCALE:NTS
CHEM SB
-- ONLY AS INDICATED IN THE SMALL BLOCK
AT THE TOP RIGHT HAND CORNER OF
HOOK-UP FOR DIFF. PRESS. INDCATING SWITCH
THE TITLE BLOCK. OFFICE-DISC: PROJECT MANAGER
CIVIL -- CONSTRUCTION / FABRICATION WORK IS (ACW SERVICE)
PERMITTED ON ‘R’ (RELEASED) ISSUES DK-IC SB
ONLY.
ELEC -- INFORMATION CONTAINED WITHIN ’HOLD’
DATE (R0 ISSUE)
IS NOT RELEASED FOR CONSTRUCTION / SHEET DRAWING NO. REV.
FABRICATION. FIELD MUST GET
DRN:AB 16-08-2012
I&C SUJAY NANDI 16-08-2012 DESIGN OFFICE TO CLEAR ’HOLDS’ IN
TIME BEFORE PROCEEDING WITH ANY DATE(CURRENT ISSUE)
MECH --
CONSTRUCTION / FABRICATION WORK
RELATED TO ‘HOLDS’.
CHD:SN
18-10-2012
19 OF 33 TCE.6428A-IC-613-IN-1701 R1
SIZE-A3