The document outlines specifications for reinforced concrete columns and footings, including maximum stirrup spacing and additional cross ties within footings. It details the sizes and reinforcement schedules for various column and footing levels. The design is exclusive to the specified project and must not be reproduced without permission.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views1 page

qs4

The document outlines specifications for reinforced concrete columns and footings, including maximum stirrup spacing and additional cross ties within footings. It details the sizes and reinforcement schedules for various column and footing levels. The design is exclusive to the specified project and must not be reproduced without permission.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

COLUMN TIES AS PER SCHEDULE

MAX STIRRUPS SPACING


=ø6 BARS @ 150mm

CONFINING REINF. ZONE MAXIMUM OF


1. 1/6 CLEAR HEIGHT STRUCTURAL R.C.
2. MAX. COL. DIMENSION COLUMN
3. 450mm.
WHICHEVER IS GREATER
TOP OF FOOTING/
FOOTING TIE BEAM(FTB)

ADD'L 16mmØ CROSS TIES


SPACED @ 300 O.C. W/IN
FOOTING.

COLUMN VERTICAL BARS


EMBEDMENT TO FOOTING DETAIL
ISOLATED FOOTING

TYPICAL CHB WALL DETAIL

SCHEDULE OF COLUMNS
MARK / FLOOR LEVEL C1

Porch BEAM LEVEL


TO
Roof BEAM LEVEL SIZE 300 X 300

REBARS 8-16mmØ
TYPICAL DETAIL OF REINFORCED CONCRETE COLUMN TIES 3-SETS 10mmØ
5@50mm, 8@75, 10@100,
rest @ 125mm to center

1st FLOOR LEVEL


TO
Porch BEAM LEVEL SIZE 300 X 300

REBARS 8-16mmØ
SCHEDULE OF FOOTINGS TIES 3-SETS 16mmØ
5@50mm, 8@75, 10@100,
rest @ 125mm to center

FOUNDATION LEVEL
TO
1st FLOOR LEVEL SIZE 300 X 300

REBARS 8-16mmØ
TIES 3-SETS 10mmØ
5@50mm, 8@75, 10@100,
rest @ 125mm to center

DESIGN AND DRAWN BY: SEAL SIGNED AND SEALED BY: PROJECT TITLE: APPROVED BY: SHEET CONTENTS: SHEET NO. :
THE DE S I GNS , T ECHN I CA L SPE C I F I CA T I ONS A ND
CONSTRUCTION DETAILS HAVE BEEN EXCLUSIVELY PREPARED
FOR THIS PROJECT ONLY. IT SHALL NOT BE REPRODUCED OR
COPIED IN ANY PART OR WHOLE WITHOUT THE DIRECT
PERMISSION FROM THE DESIGNER. THIS DRAWING SHALL BE TABLE OF CONTENTS A - 01
SCALED FOR CONSTRUCTION PURPOSES. ALL DIMENSIONS ARE
TO BE CHECKED ON SITE PRIOR TO MANUFACTURE AND
CONSTRUCTION. NOTIFY ENGINEER/ARCHITECT OF ANY
PERSPECTIVE 01
DISCREPANCIES DISCOVERED BEFORE CONSTRUCTION.
PRC NO. : OWNER
06
VALIDITY : LOCATION: PUROK MABOLO, BRGY. ESPERANZA, ORMOC CITY LEYTE LOCATION: PUROK MABOLO, BRGY. ESPERANZA, ORMOC CITY LEYTE

You might also like