0% found this document useful (0 votes)
15 views6 pages

Proctor CBR DENSITY Format

The document outlines the field density test results and compaction test for the upgradation of Mangalapur - Kanchhibazar Road under the Nepal Urban Governance and Infrastructure Project. It includes details on various tests conducted, including moisture content, density determination, and relative compaction. The contractor and consultant information is also provided, along with approvals from relevant personnel.

Uploaded by

imcrestha69
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views6 pages

Proctor CBR DENSITY Format

The document outlines the field density test results and compaction test for the upgradation of Mangalapur - Kanchhibazar Road under the Nepal Urban Governance and Infrastructure Project. It includes details on various tests conducted, including moisture content, density determination, and relative compaction. The contractor and consultant information is also provided, along with approvals from relevant personnel.

Uploaded by

imcrestha69
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Tilottama Municipality

Office of Municipal Executive, Lumbini Province, Manigram, Rupandehi


NepaL Urban Governance and Infrastructure Project (NUGIP)
WB Loan No / Credit No.: IDA-6778-NP
Upgradation of Mangalapur - Kanchhibazar Road
Contract No.: NP-DUDBC-273140-CW-RFB

M/S BN-PEA J.V.


M/S SHARMA-SAGUN J.V.
New Baneshwor, Kathmandu
Tested By: Submitted By: Witnessed By: Verified By: Approved By:

___________ ________________ ________________ ____________


Sr. Lab Technician Contract Manager Sr. Lab. Tech Material Engineer Resident Engineer

Contractor: M/S SHARMA-SAGUN J.V. Consultant: M/S BN-PEA J.V. New Baneshwor, Kathmandu
.V.
hmandu
Approved By:

____________
Resident Engineer
Tilottama Municipality
Office of Municipal Executive, Lumbini Province, Manigram, Rupandehi
NepaL Urban Governance and Infrastructure Project (NUGIP)
WB Loan No / Credit No.: IDA-6778-NP
Upgradation of Mangalapur - Kanchhibazar Road
Contract No.: NP-DUDBC-273140-CW-RFB

Field Density Test Results


Location/Chainage:- Date:
Sample :

Cone Constant: gm
Pour Density of Sand: gm/cc

Sample : Fill Material


Pit No. 1 2 3 4 5 6
Chainage :
Depth Of Test Hole :cm

VOLUME OF TEST HOLE


Initial weight of cone,jar+sand,gm
Final weight of cone,jar+sand,gm
Weight of sand in test hole,gm
Volume of the test hole,cc
SSD Sp. Gravity of Aggregate

MOISTURE CONTENT (By Moisture Meter)


Can No.
Can Weight,gm
Wt of can+ moist sample of test hole,gm
Wt of can+dry sample of test hole,gm
Weight of moisture,gm
Weight of dry sample,gm
Moisture content %

FIELD DENSITY
Wt of moist sample removed from test hole,gm

Weight of moist sample (+4.75mm), gm


Weight of moist sample (-4.75mm), gm
Volume of sample (+4.75mm),cc
Volume of sample (-4.75mm),cc
Total Moist Density of sample,gm/cc
Total Moist Density (-4.75mm),gm/cc
Dry density of all soil, gm/cc
Maximum Dry density (MDD), gm/cc
Dry density of sample (-4.75mm), gm/cc
Relative Compaction (%)
Remarks:
Contractor Consultant

________________________________ _________________________
Tested & Prepared By: Sr Lab Technician Witness By: Lab Technician/QC Engineer
Tilottama Municipality
Office of Municipal Executive, Lumbini Province, Manigram, Rupandehi
NepaL Urban Governance and Infrastructure Project (NUGIP)
WB Loan No / Credit No.: IDA-6778-NP
Upgradation of Mangalapur - Kanchhibazar Road
Contract No.: NP-DUDBC-273140-CW-RFB

Field Density Test Results


Description of Sample : Sub-Base
Source : Date :-
Layer Lab Ref. No :-

S. No. Description Unit Test No :-


1 Bulk Density of Sand g/cc
2 Wt. of sand in Cone g
3 Sp. Gr. of particles + 3/4"
4 Max. Dry Density g/cc
VOLUME OF HOLE
Chainage Remarks
Depth of hole cm
offset
5 Wt of sand & apparatus before test g
6 Wt of sand & apparatus after test g
7 Wt of sand in test hole (5-6-2) g
8 Volume of test hole (7/1) cc
DENSITY
9 Wt. of total wet soil g Remarks
10 Wt. wet soil (+3/4") g
11 Wt. wet soil (-3/4") (9-10) g
12 Volume of soil (+3/4) (10/3) cc
13 Volume of soil (-3/4") (8-12) cc
14 Total wet Density (9/8) g/cc
15 Wet Density (-3/4")(11/13) g/cc

16 Dry Density(-3/4")(15*100/(100+23) g/cc

17 Field Compaction(16/4)*100 %

MOISTURE CONTENT %

Rapid Moisture Meter used for Moisture Calculation

Test SUMMARY
Lab. Test Field Test

Maximum
Test No. Chainage Side Optimum Field Relative Compaction (%) Remarks
Dry Field Dry
Moisture Moisture
Density Density g/cc
Content % Content %
g/cc

95
95
95
95
95
95
Comments ;

Contractor: Consultant/Client:

_________________________ ________________ ________________ __________________________________


Tested By Prepared & Checked By Recommended By
Lab Technician Sr. Lab Technician Contract Manager Witnessed By
Tilottama Municipality
Office of Municipal Executive, Lumbini Province, Manigram, Rupandehi
NepaL Urban Governance and Infrastructure Project (NUGIP)
WB Loan No / Credit No.: IDA-6778-NP
Upgradation of Mangalapur - Kanchhibazar Road
Contract No.: NP-DUDBC-273140-CW-RFB

COMPACTION TEST (MODIFIED PROCTOR )


Source/ Location of Material: Karahiya Rice Field (Kewat) Test No. : 5
Sample Description: Embankment Filling/Sub-Grade Date of Sampling : 28-Apr-23
Quantity Represented: Date of Test : 2-May-23
Sampled By: Jointly Lab Ref No: UMKR-02-05
LOCATION 1+715
Mould Diameter (cm) 15
Height of Mould (cm) 12.8
Volume of mould (cm3) 2262.86
Water Content Determination
Sample No 1 2 3 4 5
Can no.
Wt. of wet soil + Can
Wt. of dry soil + Can
Wt. of Can
Wt. of dry soil
Wt. of moisture
Water Content, W %
Avg. water content % 4.6% 8% 9.3% 11.1% 12.9% 15.2%
Density Determination
Water Content, W% 4.6% 8% 9.3% 11.1% 12.9% 15.2%
Wt. of Soil + mould 10553 10867 11073 11217 11322 11347
Wt. of mould 6600 6600 6600 6600 6600 6600
Wt. of Soil in mould (gm) 3953 4267 4473 4617 4722 4747
Wet Density, gm/cm3 1.747 1.886 1.977 2.040 2.087 2.098
Dry Density, gm/cm3 1.67 1.75 1.81 1.84 1.85 1.82

Dry density/Moisture content relationship


2.15

2.1

2.05
Dry Density g/cc

1.95

1.9

1.85

1.8

1.75
6 7 8 9 10 11 12 13 14 15
Moisture content %

Optimum Moisture Content: 12.95 MDD: 1.848


REMARKS ………………………………………………………………………………………

________________________________ _________________________
Tested & Prepared By Witness By:
Sr Lab Technician QC Engineer