## **1.0 Introduction/Background**
This business case outlines the strategic rationale, financial implications, and
operational benefits of implementing a state-of-the-art LMS. The system will
replace our outdated, manual processes with an automated, scalable, and
user-friendly solution, positioning our library as a leader in modern
information management.
- **Poor Integration**: The current system does not integrate well with other
institutional systems, creating silos of information.
### **Assumptions**
3. The LMS will integrate seamlessly with existing institutional systems and
infrastructure.
4. Library staff will receive adequate training to ensure smooth adoption and
utilization of the new system.
### **Constraints**
1. **Budget Limitations**: The project must not exceed the allocated budget
of $250,000.
### **Recommendation**
1. **User Interface**:
2. **Circulation Management**:
|-----------------------------------|--------------------|
| **Total** | **$250,000** |
- **Projected Benefits**:
| **Phase** | **Timeline** |
## **10.0 Exhibits**
### **Exhibit A: Project Timeline**
```plaintext
| Month | Activity |
```
```plaintext
| Category | Cost |
|------------------------------|------------|
| **Total** | **$250,000**|
```
```plaintext
| Metric | Value |
|-----------------------|-----------------|
```