Technical Specification: Client: Axion Energy Project: U&O

The document outlines the technical specifications for the Fire and Gas Detection System for the Axion Campana Refinery Expansion Project in Argentina. It includes system descriptions, reference documents, standards, and detailed requirements for various detection devices such as smoke, gas, and hydrogen detectors. The specifications emphasize compliance with relevant codes and the need for certification and proper installation of the detection systems.

Uploaded by

Han Huang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views13 pages

Technical Specification: Client: Axion Energy Project: U&O

The document outlines the technical specifications for the Fire and Gas Detection System for the Axion Campana Refinery Expansion Project in Argentina. It includes system descriptions, reference documents, standards, and detailed requirements for various detection devices such as smoke, gas, and hydrogen detectors. The specifications emphasize compliance with relevant codes and the need for certification and proper installation of the detection systems.

Uploaded by

Han Huang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

Page: 1

10668-I-ET-001
Of: 13

CLIENT: AXION ENERGY


PROJECT: U&O

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION

SE CWT-FGT (FASE 1) - FIRE & GAS SYSTEM – TECHNICAL


SPECIFICATION

0 28-06-2016 ISSUE FOR BID YSL JFO JCU


A 16-06-2016 FOR COMMENTS YSL JFO JCU
REV DATE DESCRIPTION BY CHK. APPR.

10668-I-ET-001-0 F-ING-002 (I) Rev. 0 15/10/10


Page: 2 Of: 13
10668-I-ET-001
Rev: 0

CLIENT: AXION ENERGY


PROJECT: U&O
TECHNICAL SPECIFICATION

Index

1. SYSTEM DESCRIPTION ........................................................................................... 3


2. REFERENCE DOCUMENTS ...................................................................................... 3
3. REFERENCE STANDARDS ....................................................................................... 3
4. FIRE AND GAS DETECTION SYSTEM ........................................................................ 5
4.1. Fire Central....................................................................................................... 5
4.2. HVAC Gas Detectors ....................................................................................... 7
4.2.1. Flammable gas detectors ...................................................................................... 7
4.2.2. Toxic gas detectors ............................................................................................... 7
4.3. Hydrogen Detectors ......................................................................................... 8
4.4. Smoke Detectors .............................................................................................. 9
4.5. Manual Call Point ........................................................................................... 10
4.6. Notification Device – Audible and Visual (Inside the Building) ....................... 10
4.7. Notification Device – Audible (Outside the Building) ...................................... 11
4.8. Notification Device – Visual (Outside the Building)......................................... 11
4.9. Heat Detectors ............................................................................................... 12
5. PROVISION OF MATERIAL ..................................................................................... 13
6. DOCUMENTATION ................................................................................................ 13

10668-I-ET-001-0 F-ING-002 (I) Rev. 0 15/10/10


Page: 3 Of: 13
10668-I-ET-001
Rev: 0

CLIENT: AXION ENERGY


PROJECT: U&O
TECHNICAL SPECIFICATION

1. SYSTEM DESCRIPTION
This Technical Specification sets out the requirements governing the design of
Fire and Gas Detection System for the Axion Campana Refinery Expansion
Project, Argentina.

2. REFERENCE DOCUMENTS
The reference documents listed below form an integral part of this Specification
unless otherwise stipulated, the applicable version of these documents,
including relevant appendices and supplements.

Document Number Description


A7XN-RC-45-TD-0001 FIRE PROTECTION BASIS OF DESIGN
A7XN-RC-45-TD-0002 FIRE & GAS SYSTEM (FGS) BASIS OF DESIGN
DESIGN OF COMBUSTIBLE AND TOXIC GAS
A7XN-RC-70-SP-0910
DETECTION SYSTEMS
A7XN-ATTACHMENT 4 SE-CWT PHASE I – OPTION TRUCK
A7XN-ATTACHMENT 5 SE-CWT PHASE I – OPTION BARGE
ELECTRICAL DISTRIBUTION SYSTEM
A7XN‐RC‐65‐SP‐0101
PHILOSOPHY AND DESIGN CRITERIA
A7XN‐RC‐65‐SP‐0201 HAZARDOUS AREA CLASSIFICATION
A7XN‐RC‐65‐SP‐0301_R1 LOW VOLTAGE CABLE SPECIFICATION
A7XN‐RC‐65‐SP‐0302_R1 INSTRUMENT CABLE SPECIFICATION

3. REFERENCE STANDARDS
Fire protection equipment, systems and devices shall be designed, installed
and tested in accordance with the most recent edition of the following Codes and
Standards:

- International Electromechanical Commission (IEC)

- International Building Code (IBC)

- International Fire Code (IFC)

- Local Argentina Code - Regulation LAW 13660 & other applicable regulation

- National Fire Protection Association (NFPA)

10668-I-ET-001-0 F-ING-002 (I) Rev. 0 15/10/10


Page: 4 Of: 13
10668-I-ET-001
Rev: 0

CLIENT: AXION ENERGY


PROJECT: U&O
TECHNICAL SPECIFICATION

 NFPA 72 National Fire Alarm Code


 NFPA 101 Life Safety Code
 NFPA 497 Recommended Practice for the Classification of Flammable
Liquids, Gases or Vapors and Hazardous (Classified) Locations for
Electrical Installation in Chemical Process Areas

- American Petroleum Institute (API)

 API RP 500 Recommended Practice for Classification of Locations for


Electrical Installations at Petroleum Facilities Classified as Class I,
Division I and Division 2.
 API RP 505 Recommended Practice for Classification of Locations for
Electrical Installations at Petroleum Facilities Classified as Class I, Zone
0, and Zone 2.
 API RP 2001 Recommended Practice for Fire Protection in Refineries.
 API 2031 Combustion Gas Detector Systems and Environmental and
Operational Factors Influencing Their Performance.

The foregoing standards shall be complementary to this document, as long as


they do not contradict its spirit.
The supplier will be responsible for the compliance with the applicable codes
and standards.
Conflicts between the requirements of this document, related specifications,
standards, codes and drawings must be submitted to the Contractor for
classification prior to manufacturing the affected parts.

10668-I-ET-001-0 F-ING-002 (I) Rev. 0 15/10/10


Page: 5 Of: 13
10668-I-ET-001
Rev: 0

CLIENT: AXION ENERGY


PROJECT: U&O
TECHNICAL SPECIFICATION

4. FIRE AND GAS DETECTION SYSTEM


The Fire & Gas System shall be composed of an Addressable Fire Central
(FACP) located in the SE’s electrical cabinets room. The Fire Central shall monitor
the facilities of the SE to detect any incidents in it. The fire panel will report through
Modbus Protocol TCP/IP.
The detection system shall consist of a network of addressable smoke detectors,
manual call point, flammable gas and H2S detectors in HVAC air intake, hydrogen
detector in battery room, thermal detectors in transformers enclosure.
Audible and visual notification devices shall be installed inside and outside the
SE.
All devices listed shall report to the Fire Central.
In case of activation of any detector, the fire panel must identify the detector and
report it, with no action execution.

The system must be certified by FM as a combined system of fire and gas


detection in accordance with NFPA 72.

4.1. FIRE CENTRAL


- The fire panel shall monitor all the items listed in this technical specification,
it shall inspect all communications, commands and control functions and the
annunciation’s logics.
- The addressable fire central shall have its own alphanumeric operation
panel for local indication, reporting the status of detectors (alarms, failures
and diagnostics).
- It shall have LEDs status for a quick viewing of events, real time clock, self-
diagnostic system reporting on the display/LEDs, at least: failures in the
loop, grounding failures, power failures, status of each detector
(alarm/failure), etc.
- The addressable central will be powered with 220 Vac from UPS.
- The central must have its own 24 VDC power supplies to power the devices
it must monitor/control.
- Each power supply shall have supervision capable of detecting at least:
220Vac failure; PAT+ failure, PAT- failure, in 24 Vdc with ECT IT; batteries
failure, power supply failure.
- The central must have a backup batteries bank calculated to allow the
system to continue operating at main power supply failure (220 VAC) for at
least 24 hours in Stand-by mode followed by 5 minutes in alarm mode.

10668-I-ET-001-0 F-ING-002 (I) Rev. 0 15/10/10


Page: 6 Of: 13
10668-I-ET-001
Rev: 0

CLIENT: AXION ENERGY


PROJECT: U&O
TECHNICAL SPECIFICATION

- Devices shall be connected to the fire panel by class A circuits.


- The fire central shall have communication ports for configuration as well as,
at least, two ports for Modbus communications.
- The central will report to the plant system through Modbus TCP/IP
communication protocol.
- It shall not execute any action when a fire is detected.
- The central shall stop the HVAC system when detectors installed in HVAC
air intake indicate this action.
- The fire panel must have the ability to communicate with at least 240
addressable loop devices such as:
 IR3 Multispectrum Flame Detectors
 UV/IR, UV, IR flame detectors
 IR and Catalysts explosive mixture detectors
 Toxic Gas Detectors
 Inputs/Outputs digital programmable modules
 Relay Output Module
 Analog Inputs Module for integration to the 4-20 mA signal System
 Power Supply Monitoring Module
 Loop Extender Module
 Smoke/Heat Detectors Module
- The fire central provider shall supply all the necessary information and
assistance for communication establishment, configuration and reporting.
- The fire central provider shall supply all the equipment and/or materials
necessary (although not listed in this specification) for the proper
performance of the addressable central.

10668-I-ET-001-0 F-ING-002 (I) Rev. 0 15/10/10


Page: 7 Of: 13
10668-I-ET-001
Rev: 0

CLIENT: AXION ENERGY


PROJECT: U&O
TECHNICAL SPECIFICATION

4.2. HVAC GAS DETECTORS

4.2.1. FLAMMABLE GAS DETECTORS


Flammable gas detectors shall be Infrared (IR) type. They must be
equipped with an automatic testing system, which allows a regular test of
the optical system operation (including the lens transparency).

The following characteristics will apply to each detector:


- Output signal: 4-20 mA + HART.
- Power supply: 24 VDC. The wiring is done through a triad.
- Degree of protection: IP 65.
- Detectors will be calibrated according to corresponding explosive
mixture.
- Gas detection system shall provide two levels of alarm:
o Gas: 20% LEL
o Confirmed Gas: 40% LEL
- Location of detectors will be according to the guidelines indicated in
NFPA 72.
- Supplier shall include the mounting accessories for detectors.
- Supplier shall provide Certificates of Conformity according to the
standards applicable to the device.
- Detectors shall be calibrated on site.
- Gas detectors shall be directly wired to the Electrical Substation Fire
Alarm Control Panel.

4.2.2. TOXIC GAS DETECTORS


Toxic gas detectors shall be electrochemical type. They must be equipped
with an automatic testing system.
The following characteristics will apply to each detector:
- Output signal: 4-20 mA + HART.
- Power supply: 24 VDC. The wiring is done through a triad.
- Degree of protection: IP 65.
- Detectors will be calibrated according to corresponding Toxic gas.
- Toxic Gas detection system shall provide two levels of alarm:

10668-I-ET-001-0 F-ING-002 (I) Rev. 0 15/10/10


Page: 8 Of: 13
10668-I-ET-001
Rev: 0

CLIENT: AXION ENERGY


PROJECT: U&O
TECHNICAL SPECIFICATION

o Toxic Gas: 5 ppm H2S


o Confirmed Toxic Gas: 10 ppm H2S
- Location of detectors will be according to the guidelines indicated in
NFPA 72.
- Supplier shall include the mounting accessories for detectors.
- Supplier shall provide Certificates of Conformity according to the
standards applicable to the device.
- Detectors shall be calibrated on site.
- Toxic Gas detectors shall be directly wired to the Electrical Substation
Fire Alarm Control Panel.

Service Qty. Notes


Gas detector in HVAC air intake 1 a)
Toxic Gas detector in HVAC air intake 1 a)

a) Quantity and distribution of gas detectors and toxic gas shall be specified by
supplier according to NFPA Standards.

4.3. HYDROGEN DETECTORS


Hydrogen detectors shall be Catalytic type.
The following characteristics will apply to each detector:
- Output signal: 4-20 mA + HART.
- Power supply: 24 VDC. The wiring is done through a triad.
- Degree of protection: IP 65.
- Detectors will be calibrated according to corresponding explosive
mixture.
- Set point alarm 4% LFL H2; Action Set point 10% LEL H2.
- Location of detectors will be according to the guidelines indicated in
NFPA 72.
- Supplier shall include the mounting accessories for detectors.
- Supplier shall provide Certificates of Conformity according to the
standards applicable to the device.
- Detectors shall be calibrated on site.
- Hydrogen detectors will be installed in battery rooms.
- Hydrogen detectors shall be directly wired to the Electrical Substation
Fire Alarm Control Panel.

10668-I-ET-001-0 F-ING-002 (I) Rev. 0 15/10/10


Page: 9 Of: 13
10668-I-ET-001
Rev: 0

CLIENT: AXION ENERGY


PROJECT: U&O
TECHNICAL SPECIFICATION

Service Qty. Notes


Hydrogen detector in batteries room. 1 b)

b) Quantity and distribution of hydrogen detectors shall be specified by supplier


according to NFPA standards.

4.4. SMOKE DETECTORS


Smoke detectors shall be photoelectric type.
They shall be addressable in order to provide the exact location of the detector.
The following characteristics will apply to each detector:
- Power supply: 24 VDC (SLC two wires).
- Degree of protection: IP 54.
- Detector’s enclosure shall be made of a flame retardant material.
- The equipment shall be provided with a base of two (2) wires.
- Supplier shall include the mounting accessories for detectors.
- Supplier shall provide Certificates of Conformity according to the
standards applicable to the device.
- Location of detectors will be according to the guidelines indicated in
NFPA 72.
- Smoke detectors shall be directly wired to the Electrical Substation Fire
Alarm Control Panel addressable by loops (SLC).

Service Qty. Notes


Room electrical cabinets 8 c)
Room batteries 1 c)

c) Quantity and distribution of smoke detectors shall be specified by supplier


according to NFPA standards.

10668-I-ET-001-0 F-ING-002 (I) Rev. 0 15/10/10


Page: 10 Of: 13
10668-I-ET-001
Rev: 0

CLIENT: AXION ENERGY


PROJECT: U&O
TECHNICAL SPECIFICATION

4.5. MANUAL CALL POINT


The following characteristics will apply to each manual call point:
- They shall be addressable.
- They shall be red colour.
- Manual call points must be installed at a height of 1.50 m above the
floor.
- Supplier shall include their mounting accessories.
- Supplier shall provide Certificates of Conformity according to the
standards applicable to the device.
- Location of manual call point will be according to the guidelines indicated
in NFPA 72.
- Manual call point shall be directly wired to the Electrical Substation Fire
Alarm Control Panel addressable by loops (SLC).

Service Qty. Notes


Exit from the electrical cabinets room. 2 d)
Exit from the batteries room. 1 d)

d) Quantity and distribution of smoke detectors shall be specified by supplier


according to NFPA standards.

4.6. NOTIFICATION DEVICE – AUDIBLE AND VISUAL (INSIDE THE BUILDING)


- Audible and visual device must be perfectly seen and heard by people in
the affected area.
- Supplier shall include the mounting accessories for audible and visual
notification device.
- Supplier shall provide Certificates of Conformity according to the
standards applicable to the device.
- Location of audible and visual notification device shall be according to
the guidelines indicated in NFPA 72.
- Audible and visual notification device shall be directly wired to the
Electrical Substation Fire Alarm Control Panel addressable by loops
(SLC).

Service Qty. Notes


Exit of the electrical cabinets room 3 e)
Exit of the batteries room 1 e)

10668-I-ET-001-0 F-ING-002 (I) Rev. 0 15/10/10


Page: 11 Of: 13
10668-I-ET-001
Rev: 0

CLIENT: AXION ENERGY


PROJECT: U&O
TECHNICAL SPECIFICATION

e) Quantity and distribution of devices shall be specified by supplier according to


NFPA standards.

4.7. NOTIFICATION DEVICE – AUDIBLE (OUTSIDE THE BUILDING)


- Audible device must be clearly heard by people in the affected area.
- Supplier shall include the mounting accessories for audible notification
device.
- Supplier shall provide Certificates of Conformity according to the
standards applicable to the device.
- Location of audible notification device will be according to the guidelines
indicated in NFPA 72.
- Audible notification device shall be directly wired to the Electrical
Substation Fire Alarm Control Panel addressable by loops (SLC).

Service Qty. Notes


Outside the electrical cabinets room 3 f)

f) Quantity and distribution of audible notification devices shall be specified by


supplier according to NFPA standards.

4.8. NOTIFICATION DEVICE – VISUAL (OUTSIDE THE BUILDING)


- Visual device must be perfectly seen by people in the affected area.
- Supplier shall include the mounting accessories for visual notification
device.
- Supplier shall provide Certificates of Conformity according to the
standards applicable to the device.
- Location of visual notification device will be according to the guidelines
indicated in NFPA 72.
- Visual notification device shall have the following three lenses:
o Blue (Flammable gas)
o Red (Fire and Manual Station)
o Orange (Toxic gas)
- Visual notification device shall be directly wired to the Electrical
Substation Fire Alarm Control Panel addressable by loops (SLC).

Service Qty. Notes


Outside the electrical cabinets room 3 g)

10668-I-ET-001-0 F-ING-002 (I) Rev. 0 15/10/10


Page: 12 Of: 13
10668-I-ET-001
Rev: 0

CLIENT: AXION ENERGY


PROJECT: U&O
TECHNICAL SPECIFICATION

g) Quantity and distribution of smoke detectors shall be specified by supplier


according to NFPA standards.

4.9. HEAT DETECTORS


Heat detectors will be placed in transformers enclosure to detect any increase
in temperature.
Heat detectors shall be thermo-velocimetric type (TV).
TV detectors shall be addressables in order to provide their exact location.
The following characteristics will apply to each detector:
- Power supply: 24 VDC (SLC two wires).
- Degree of protection: IP65.
- Detector’s enclosure shall be made of a flame retardant material.
- The equipment shall be provided with a base of two (2) wires.
- Supplier shall include the mounting accessories for detectors.
- Supplier shall provide Certificates of Conformity according to the
standards applicable to the device.
- Location of detectors will be according to the guidelines indicated in
NFPA 72.
- Heat detectors shall be directly wired to the Electrical Substation Fire
Alarm Control Panel addressable by loops (SLC).

Service Qty. Notes


Enclosure transformers 8 h; i; j

h) Quantity and distribution of heat detectors shall be specified by supplier


according to NFPA standards.
i) Two heat detectors for each transformer.
j) Heat detectors will not be provided with this technical specification, but they
should be considered to be mounted on site in the future.

10668-I-ET-001-0 F-ING-002 (I) Rev. 0 15/10/10


Page: 13 Of: 13
10668-I-ET-001
Rev: 0

CLIENT: AXION ENERGY


PROJECT: U&O
TECHNICAL SPECIFICATION

5. PROVISION OF MATERIAL
The supplier shall provide the necessary tools for testing detectors (aerosols or
any other method approved by the manufacturer), and gas calibration kit.
There shall also be provided engineering tools, software and hardware for
programming, monitoring and diagnostic the system.

6. DOCUMENTATION
The Fire & Gas System shall be provided in full accordance with this technical
specification.
The supplier shall execute the following documentation:
 F&G Data sheet Fire Alarms Control Panel
 F&G Data sheet Flammable gas Detectors
 F&G Data sheet Toxic gas Detectors
 F&G Data sheet Hydrogen Detectors
 F&G Data sheet Smoke Detectors
 F&G Data sheet Manual Call Point
 F&G Data sheet Notification Device – Audible and Visual (Inside the Building)
 F&G Data sheet Notification Device - Audible (Outside the Building)
 F&G Data sheet Notification Device - Visual (Outside the Building)
 F&G Data sheet Heat Detectors
 F&G Location
 F&G Cable Routing
 F&G Wiring Diagram
 F&G Electrical Wiring Diagram
 F&G Cable Schedule
 F&G Bill of Materials

10668-I-ET-001-0 F-ING-002 (I) Rev. 0 15/10/10