The document is a daily log for manpower, materials, and equipment procurement for various construction sites across different divisions in Bangladesh on March 5, 2025. It details the total manpower utilized, including site engineers, and lists the types and quantities of materials delivered, which were all recorded as zero for the day. The log serves as a record for project management and tracking resource allocation.

Uploaded by

ashraf.tcsk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views44 pages

Daily Summary Report 20250305

The document is a daily log for manpower, materials, and equipment procurement for various construction sites across different divisions in Bangladesh on March 5, 2025. It details the total manpower utilized, including site engineers, and lists the types and quantities of materials delivered, which were all recorded as zero for the day. The log serves as a record for project management and tracking resource allocation.

Uploaded by

ashraf.tcsk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 44

[UITRCE Phase Ⅱ] Daily Manpower & Material & Equipment Procurement Log

March 5, 2025
Division 2 (Khulna) 3 (Rajshahi) 4 (Rangpur) 5 (Dhaka) 7(Sylhet) 8 (Chittagong)

Site No. 16 17 18 19 27 40 50 53 58 64 70 73 77 82 87 92 95 97 101 135 141 142 143 144 Total

Type A3 22.5m 28.5m 22.5m 18m A3 A2 A1 13.5m A3 A1 A1 A1 18m 18m 13.5m A2 A2 18m A2 A2 A2 A2 A2

1. Today's Manpower Total - 12 16 12 17 10 6 - - 17 9 - - 12 6 8 - - 8 - 10 12 9 - 164


Site Engineer - 1 1 1 1 1 1 - - 1 1 - - 1 1 1 - - 1 - 1 1 1 - 15

Temp. Work - - - - - - - - - - - - - - - - - - - - - - - - -

Pile Rebar - - - - - - - - - - - - - - - - - - - - - - - -

Pile Formwork - - - - - - - - - - - - - - - - - - - - - - - -

Pile Casting - - - - - - - - - - - - - - - - - - - - - - -

Test Pile Driving - - - - - - - - - - - - - - - - - - - - - - - -

Pile Load-Test - - - - - - - - - - - - - - - - - - - - - - - -

Service Pile Driving - - - - - - - - - - - - - - - - - - - - - - - -

Excavation - - - - - - - - - - - - - - - - - - - - - - - -

Foundation Rebar - - - - - - - - - - - - - - - - - - - - - - - -

Foundation Formwork - - - - - - - - - - - - - - - - - - - - - - - -

Foundation Casting - - - - - - - - - - - - - - - - - - - - - - - -

Backfilling - - - - - - - - - - - - - 6 - - - - - - - - - - 6

Sand Fill - - - - - - - - - - - - - - - - - - - - - - - -

GF Rebar - - - - - - - - - - - - - 5 - - - - - - - - - - 5

GF Formwork - - - - - - - - - - - - - - - - - - - - - - - -

GF Casting - - - - - - - - - - - - - - - - - - - - - - - - -

1F Rebar - - - 5 - - - - - - - - - - - - - - - - - - - 5

1F Formwork - - 15 3 - - - - - - 8 - - - - - - - - - - - - 26

1F Casting - - - - - - - - - - - - - - - - - - - - - - - -

Activity RF Rebar - - - - - - - - - - - - - - 5 - - 7 - 5 - 3 - 20

RF Formwork - - - - 3 5 - - - - - - - - - 7 - - - - - - - 15

RF Casting - - - - 3 - - - - - - - - - - - - - - - - - - 3

GF Brick - - - - 5 4 - - - - - - - - - - - - - - 4 - 5 - 18

1F Brick - 5 - - - - - - - - - - - - - - - - - - - - - 5

Lime Terracing - - - - - - - - - - - - - - - - - - - - - - - - -

GF Plaster - - - - - - - - - - - - - - - - - - - - - - - - -

1F Plaster - 6 - - 5 - - - - 10 - - - - - - - - - - - 8 - - 29

W.Grill & V.Railing - - - - - - - - - - - - - - - - - - - - - 3 - - 3

Door & Window - - - - - - - - - - - - - - - - - - - - - - - - -

Stair Railing - - - - - - - - - - - - - - - - - - - - - - - - -

GF Tile Work - - - - - - - - - - - - - - - - - - - - - - - - -

1F Tile Work - - - - - - - - - - - - - - - - - - - - - - - - -

GF Paint Work - - - - - - - - - - - - - - - - - - - - - - - - -

1F Paint Work - - - - - - - - - - - - - - - - - - - - - - - - -

GF Aluminum Work - - - - - - - - - - - - - - - - - - - - - - - - -

1F Aluminum Work - - - - - - - - - - - - - - - - - - - - - - - - -

Septic Tank & Soak Well - - - 3 - - - - - - - - - - - - - - - - - - - - 3

Generator Room - - - - - - - - - - - - - - - - - - - - - - - - -

Sanitary Room - - - - - - 5 - - 4 - - - - - - - - - - - - - - 9

Electrical Work - - - - - - - - - 2 - - - - - - - - - - - - - - 2
Division 2 (Khulna) 3 (Rajshahi) 4 (Rangpur) 5 (Dhaka) 7(Sylhet) 8 (Chittagong)

Site No. 16 17 18 19 27 40 50 53 58 64 70 73 77 82 87 92 95 97 101 135 141 142 143 144 Total

Type A3 22.5m 28.5m 22.5m 18m A3 A2 A1 13.5m A3 A1 A1 A1 18m 18m 13.5m A2 A2 18m A2 A2 A2 A2 A2

2. Today's Materials Delivered

Type of Material Unit Daily Quantity Total

8 mm Kg - - - - - - - - - - - - - - - - - - - - - - - - -

10 mm Kg - - - - - - - - - - - - - - - - - - - - - - - - -

12 mm Kg - - - - - - - - - - - - - - - - - - - - - - - - -
Rebar
16 mm Kg - - - - - - - - - - - - - - - - - - - - - - - - -

20 mm Kg - - - - - - - - - - - - - - - - - - - - - - - - -

25 mm Kg - - - - - - - - - - - - - - - - - - - - - - - - -

Stone Cft - - - - - - - - - - - - - - - - - - - - - - - - -

Local Cft - - - - - - - - - - - - - - - - - - - - - - - - -
Delivered
Sand
Sylhet Cft - - - - - - - - - - - - - - - - - - - - - - - - -

Cement Bag - - - - - - - - - - - - - - - - - - - - - - - - -

Bricks Nos - - - - - - - - - - - - - - - - - - - - - - - - -

Brick Chips Cft - - - - - - - - - - - - - - - - - - - - - - - - -

300*300 Sqm - - - - - - - - - - - - - - - - - - - - - - - - -

Tile 600*600 Sqm - - - - - - - - - - - - - - - - - - - - - - - - -

250*300 Sqm - - - - - - - - - - - - - - - - - - - - - - - - -

Paint 250*300 Sqm - - - - - - - - - - - - - - - - - - - - - - - - -

3. Today's Equipment Utilization

Type of Equipment Unit Daily Quantity Total

Excavator Nos - - - - - - - - - - - - - - - - - - - - - - - - -

Mixture Machine Nos - - - - - - - - - - - - - - - - - - - - - - - - -


Utilization

Pile Driving Nos - - - - - - - - - - - - - - - - - - - - - - - - -

Roof Hoist Nos - - - - - - - - - - - - - - - - - - - - - - - - -

Note ※ 7 sites to be cancelled : #49(Restricted area), #113(Pond area), #98(Undemolished existing building), #128(Restricted area), #129(Pond area), #138(Pond area), #148(Island area)
[UITRCE Phase Ⅱ] Daily Work & Issues
March 5, 2025

Division Site Type Status Main Activities Issues

16 Fakirhate A3 Pending No Work An official letter from BANBEIS is required to obtain a work permit from UNO.

1. Brick work for GF.


17 Bagherhat Sadar 22.5m On-going None
2. Plastering work for outside wall.

Division-2 1. Installation formwork for 1F column.


18 Dacope 28.5m On-going None
(Khulna) 2. Dismantle formwork for 1F slab.

1. Installation rebar for 1F column.


(18/20 ea)
19 Batiaghata 22.5m On-going None
2. Installation formwork and rebar for 1F staircase.
3. Brick work for septic tank.

1. Brick work for RF.


2. Plastaring work for 1F ceiling.
27 Keshabpur 18m On-going None
3. Concrete casting for RF short column.
(16/20 ea)

1. Installation formwork for RF beam.


40 Shathia A3 on-going None
2. Brick work for GF.

50 Dhamoirhat A2 on-going 1. Installation deep tubewell for water supply. None

Division-3
(Rajshahi)

53 Godagari A1 Pending No Work An official letter from BANBEIS is required to obtain a work permit from UNO.

58 Singra 13.5m Pending No Work An official letter from BANBEIS is required to obtain a work permit from UNO.

1. Plastering work for outside wall.


64 Patgram A3 on-going 2. Installation electrical conduit pipe and pull box for GF. None.
3. Installation sanitary conduit pipe for GF.

Division-4
70 Nilphamari Sadar A1 On-going 1. Installation formwork for RF beam. None
(Rangpur)

73 Dinajpur Sadar A1 Pending No Work An official letter from BANBEIS is required to obtain a work permit from UNO.
Division Site Type Status Main Activities Issues

Division-4
77 Thakurgaon Sadar A1 Pending No Work An official letter from BANBEIS is required to obtain a work permit from UNO.
(Rangpur)

1. Installation rebar for grade beam.


82 Kotalipara 18m On-going None
2. Backfilling for GF slab.

87 Nagarkanda 18m On-going 1. Installation rebar for RF beam. None

92 Gazaria 13.5m On-going 1. Installation formwork for RF beam. None

Division-5
(Dhaka)

95 Keranigonj A2 On-going No work. Hoban E&C electrical team conducts on-site inspections to monitor the progress of ongoing work.

97 Gazipur Sadar A2 Pending No Work An official letter from BANBEIS is required to obtain a work permit from UNO.

101 Ghior 18m On-going 1. Installation rebar for RF beam. None

Division-7
135 Golapganj A2 Pending No Work Commencement of work is pending due to JAKS issue.
(Sylhet)

1. Installation rebar for RF beam.


141 Lalmai A2 On-going None
2. Brick work for GF.

1. Plastering work for 1F.


142 Hajigonj A2 On-going None.
2. Installation window grill for 1F.
Division-8
(Chittagong)
1. Installation rebar for RF staircase.
143 Haimchar A2 On-going None
2. Brick work for GF.

144 Chandpur Sadar A2 Pending No work. An official letter from BANBEIS is required to obtain a work permit from UNO.

Pending 8 sites
Total 24 sites
On-going 16 sites
Daily Site Report

Site No. 16 Commencement Pending

Site Fakirhate Weather


Date March 5, 2025 Sub-Contractor Amanat Enterprise

Division Khulna Site Engineer


Foundation Type A3 Mobile No.
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer - 79 8 mm Kg - -

Pile Driver - - 10 mm Kg - -

Carpenter - - 12 mm Kg - -
Rebar
Rebar Worker - - 16 mm Kg - -

Concrete Worker - - 20 mm Kg - -

Mason - - 25 mm Kg - -

Electrician - - Stone Cft - -

Plumber - - Local Cft - -


Sand
Painter - - Sylhet Cft - -

Tile Layer - - Cement Bag - -

General Worker - 20 Bricks Nos - -

Security Guard - - Brick Chips Cft - -

Operator - - 300*300 Sqm - -

Total - 99 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -

No Work (Heavy) Equipment


Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -

No Work Pile Driving Nos - -

Roof Hoist Nos - -

Issues

An official letter from BANBEIS is required to obtain a work permit from UNO.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


v

Site No. 40 Commencement Sep 18, 2024 on-going

Site Shathia Weather Sunny / 24℃

Date March 5, 2025 Sub-Contractor BOF Korea

Division Rajshahi Site Engineer Madehi Hasan

Foundation Type A3 Mobile No. +880 1754-210839

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 170 8 mm Kg - -

Pile Driver - - 10 mm Kg - 10,644

Carpenter 5 231 12 mm Kg - 9,568


Rebar
Rebar Worker - 318 16 mm Kg - 8,191

Concrete Worker - 179 20 mm Kg - 6,202

Mason 4 22 25 mm Kg - -

Electrician - 23 Stone Cft - 5,944

Plumber - 13 Local Cft - 7,567


Sand
Painter - - Sylhet Cft - 4,189

Tile Layer - - Cement Bag - 1,545

General Worker - 103 Bricks Nos - 22,300

Security Guard - 1 Brick Chips Cft - 832

Operator - 20 300*300 Sqm - -

Total 10 1,080 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -
1. Installation formwork for RF beam.
(Heavy) Equipment
2. Brick work for GF.
Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -
1. Installation formwork and rebar for RF staircase.
2. Brick work for GF. Pile Driving Nos - -
3. Installation electrical conduit pipe for RF.
Roof Hoist Nos - -

Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 50 Commencement Sep 14, 2024 on-going

Site Dhamoirhat Weather Sunny / 26℃

Date March 5, 2025 Sub-Contractor BOF Korea

Division Rajshahi Site Engineer Ahmed Hoshan

Foundation Type A2 Mobile No. 01874-997634

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 192 8 mm Kg - -

Pile Driver - - 10 mm Kg - 6,764

Carpenter - 159 12 mm Kg - 2,844


Rebar
Rebar Worker - 220 16 mm Kg - 6,921

Concrete Worker - 205 20 mm Kg - 4,242

Mason - 14 25 mm Kg - -

Electrician - 14 Stone Cft - 6,975

Plumber 5 15 Local Cft - 25,705


Sand
Painter - - Sylhet Cft - 4,230

Tile Layer - - Cement Bag - 1,520

General Worker - 118 Bricks Nos - 20,400

Security Guard - - Brick Chips Cft - 580

Operator - 28 300*300 Sqm - -

Total 6 965 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -

1. Installation deep tubewell for water supply. (Heavy) Equipment


Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -
1. Installation rebar for RF slab.
Pile Driving Nos - -
2. Installation deep tubewell for water supply.
Roof Hoist Nos - -

Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 53 Commencement May 13, 2024 Pending

Site Godagari Weather


Date March 5, 2025 Sub-Contractor
Division Rajshahi Site Engineer
Foundation Type A1 Mobile No.
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer - 86 8 mm Kg - -

Pile Driver - - 10 mm Kg - -

Carpenter - - 12 mm Kg - -
Rebar
Rebar Worker - - 16 mm Kg - -

Concrete Worker - - 20 mm Kg - -

Mason - - 25 mm Kg - -

Electrician - - Stone Cft - -

Plumber - - Local Cft - -


Sand
Painter - - Sylhet Cft - -

Tile Layer - - Cement Bag - -

General Worker - 1 Bricks Nos - -

Security Guard - - Brick Chips Cft - -

Operator - - 300*300 Sqm - -

Total - 87 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -

No Work (Heavy) Equipment


Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -

No Work Pile Driving Nos - -

Roof Hoist Nos - -

Issues

An official letter from BANBEIS is required to obtain a work permit from UNO.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Report

Site No. 64 Commencement Sep 21, 2024 on-going

Site Patgram Weather Sunny / 25℃

Date March 5, 2025 Sub-Contractor Masud & Brothers

Division Rangpur Site Engineer Mohammad Ali

Foundation Type A3 Mobile No. 01722-213900

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 261 8 mm Kg - -

Pile Driver - - 10 mm Kg - 10,572

Carpenter - 406 12 mm Kg - 4,105


Rebar
Rebar Worker - 417 16 mm Kg - 9,761

Concrete Worker - 259 20 mm Kg - 5,711

Mason 10 548 25 mm Kg - -

Electrician 2 64 Stone Cft - 9,400

Plumber 4 22 Local Cft - 27,150


Sand
Painter - - Sylhet Cft - 7,200

Tile Layer - - Cement Bag - 1,790

General Worker - 147 Bricks Nos - 45,000

Security Guard - 2 Brick Chips Cft - -

Operator - 22 300*300 Sqm - -

Total 17 2,148 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -
1. Plastering work for outside wall.
2. Installation electrical conduit pipe and pull box for GF. (Heavy) Equipment
3. Installation sanitary conduit pipe for GF.
Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -

1. Plastering work for outside wall. Mixture Machine Nos - -


2. Installation electrical conduit pipe and pull box for GF.
Pile Driving Nos - -
3. Installation sanitary conduit pipe for GF.
4. Installation window grill for GF. Roof Hoist Nos - -

None.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 70 Commencement Dec 23, 2024 On-going

Site Nilphamari Sadar Weather Sunny / 24℃

Date March 5, 2025 Sub-Contractor BOF Korea

Division Rangpur Site Engineer Md Alamgir Hossain

Foundation Type A1 Mobile No. 01798-775449

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 171 8 mm Kg - 60

Pile Driver - - 10 mm Kg - 10,929

Carpenter 8 200 12 mm Kg - 3,135


Rebar
Rebar Worker - 227 16 mm Kg - 7,817

Concrete Worker - 180 20 mm Kg - 6,108

Mason - 8 25 mm Kg - -

Electrician - 25 Stone Cft - 4,906

Plumber - 44 Local Cft - 7,150


Sand
Painter - - Sylhet Cft - 3,560

Tile Layer - - Cement Bag - 1,261

General Worker - 42 Bricks Nos - 16,500

Security Guard - 4 Brick Chips Cft -

Operator - 20 300*300 Sqm - -

Total 9 921 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -

1. Installation formwork for RF beam. (Heavy) Equipment


Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -

1. Installation formwork and rebar for RF beam. Pile Driving Nos - -

Roof Hoist Nos - -

Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 73 Commencement Pending

Site Dinajpur Sadar Weather


Date March 5, 2025 Sub-Contractor Masud & Brothers

Division Rangpur Site Engineer


Foundation Type A1 Mobile No.
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer - 62 8 mm Kg - -

Pile Driver - - 10 mm Kg - -

Carpenter - - 12 mm Kg - -
Rebar
Rebar Worker - - 16 mm Kg - -

Concrete Worker - - 20 mm Kg - -

Mason - - 25 mm Kg - -

Electrician - - Stone Cft - -

Plumber - - Local Cft - -


Sand
Painter - - Sylhet Cft - -

Tile Layer - - Cement Bag - -

General Worker - - Bricks Nos - -

Security Guard - - Brick Chips Cft - -

Operator - - 300*300 Sqm - -

Total - 62 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -

No Work (Heavy) Equipment


Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -

No Work Pile Driving Nos - -

Roof Hoist Nos - -

Issues

An official letter from BANBEIS is required to obtain a work permit from UNO.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Report

Site No. 77 Commencement Pending

Site Thakurgaon Sadar Weather


Date March 5, 2025 Sub-Contractor Masud & Brothers

Division Rangpur Site Engineer


Foundation Type A1 Mobile No.
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer - 103 8 mm Kg - -

Pile Driver - - 10 mm Kg - -

Carpenter - - 12 mm Kg - -
Rebar
Rebar Worker - - 16 mm Kg - -

Concrete Worker - - 20 mm Kg - -

Mason - - 25 mm Kg - -

Electrician - - Stone Cft - -

Plumber - - Local Cft - -


Sand
Painter - - Sylhet Cft - -

Tile Layer - - Cement Bag - -

General Worker - 6 Bricks Nos - -

Security Guard - - Brick Chips Cft - -

Operator - - 300*300 Sqm - -

Total - 109 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -

No Work (Heavy) Equipment


Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -

No Work Pile Driving Nos - -

Roof Hoist Nos - -

Issues

An official letter from BANBEIS is required to obtain a work permit from UNO.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Report

Site No. 95 Commencement June 6, 2024 On-going

Site Keranigonj Weather Sunny / 24℃

Date March 5, 2025 Sub-Contractor BOF Korea

Division Dhaka Site Engineer MD Solaiman

Foundation Type A2 Mobile No. +880 1783-266065

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer - 276 8 mm Kg - 99

Pile Driver - - 10 mm Kg - 11,123

Carpenter - 345 12 mm Kg - 3,073


Rebar
Rebar Worker - 364 16 mm Kg - 7,990

Concrete Worker - 190 20 mm Kg - 5,856

Mason - 580 25 mm Kg - -

Electrician (Welder) - 162 Stone Cft - 6,203

Plumber - 122 Local Cft - 10,021


Sand
Painter - 151 Sylhet Cft - 3,833

Tile Layer - 116 Cement Bag - 2,417

General Worker - 808 Bricks Nos - 55,000

Security Guard - 111 Brick Chips Cft - 1,560

Operator - 12 300*300 Sqm - 375

Total - 3,237 Tile 600*600 Sqm - 414

Today's Work 200*300 Sqm - 223


Paint Sqm - 2,453

No work. (Heavy) Equipment


Type Unit Qt'y Cumulative
Tomorrow's Work (planned) Excavator Nos - -
Mixture Machine Nos - -

No Work Pile Driving Nos - -

Roof Hoist Nos - -

Issues

Hoban E&C electrical team conducts on-site inspections to monitor the progress of ongoing work.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 97 Commencement Jun 18, 2024 Pending

Site Gazipur Sadar Weather


Date March 5, 2025 Sub-Contractor Masud & Brothers

Division Dhaka Site Engineer


Foundation Type A2 Mobile No.
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer - 7 8 mm Kg - -

Pile Driver - - 10 mm Kg - -

Carpenter - - 12 mm Kg - -
Rebar
Rebar Worker - - 16 mm Kg - -

Concrete Worker - - 20 mm Kg - -

Mason - - 25 mm Kg - -

Electrician - - Stone Cft - -

Plumber - - Local Cft - -


Sand
Painter - - Sylhet Cft - -

Tile Layer - - Cement Bag - -

General Worker - - Bricks Nos - -

Security Guard - - Brick Chips Cft - -

Operator - - 300*300 Sqm - -

Total - 7 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -

No Work (Heavy) Equipment


Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -

No Work Pile Driving Nos - -

Roof Hoist Nos - -

Issues

An official letter from BANBEIS is required to obtain a work permit from UNO.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Report

Site No. 135 Commencement Pending

Site Golapganj Weather


Date March 5, 2025 Sub-Contractor
Division Sylhet Site Engineer
Foundation Type A2 Mobile No.
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer - 93 8 mm Kg - -

Pile Driver - - 10 mm Kg - -

Carpenter - - 12 mm Kg - -
Rebar
Rebar Worker - - 16 mm Kg - -

Concrete Worker - - 20 mm Kg - -

Mason - - 25 mm Kg - -

Electrician - - Stone Cft - -

Plumber - - Local Cft - -


Sand
Painter - - Sylhet Cft - -

Tile Layer - - Cement Bag - -

General Worker - - Bricks Nos - -

Security Guard - - Brick Chips Cft - -

Operator - - 300*300 Sqm - -

Total - 93 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -

No Work (Heavy) Equipment


Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -

No Work Pile Driving Nos - -

Roof Hoist Nos - -

Issues

Commencement of work is pending due to JAKS issue.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Report

Site No. 141 Commencement On-going

Site Lalmai Weather Sunny / 24℃

Date March 5, 2025 Sub-Contractor Provat Kumar Kundu

Division Chittagong Site Engineer Nahid Ahmed Shamim

Foundation Type A2 Mobile No. 01917-793780

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 258 8 mm Kg - -

Pile Driver - - 10 mm Kg - 14,326

Carpenter - 331 12 mm Kg - 3,915


Rebar
Rebar Worker 5 387 16 mm Kg - 7,784

Concrete Worker - 162 20 mm Kg - 7,661

Mason 4 31 25 mm Kg - -

Electrician - 20 Stone Cft - 6,617

Plumber - 7 Local Cft - 18,514


Sand
Painter - - Sylhet Cft - 2,200

Tile Layer - - Cement Bag - 1,275

General Worker - 149 Bricks Nos - 12,500

Security Guard - - Brick Chips Cft - 600

Operator - 18 300*300 Sqm - -

Total 10 1,363 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -
1. Installation rebar for RF beam.
(Heavy) Equipment
2. Brick work for GF.
Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -
1. Installation rebar for RF slab.
Pile Driving Nos - -
2. Brick work for GF.
Roof Hoist Nos - -

Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 142 Commencement May 26, 2024 On-going

Site Hajigonj Weather Sunny / 21℃

Date March 5, 2025 Sub-Contractor Provat Kumar Kundu

Division Chittagong Site Engineer Sibgatullah Bipul

Foundation Type A2 Mobile No. 0164848-9852

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 320 8 mm Kg - -

Pile Driver - - 10 mm Kg - 7,486

Carpenter 3 330 12 mm Kg - 2,749


Rebar
Rebar Worker - 418 16 mm Kg - 8,801

Concrete Worker - 191 20 mm Kg - 4,362

Mason 8 491 25 mm Kg - -

Electrician - 53 Stone Cft - 5,596

Plumber - 30 Local Cft - 3,500


Sand
Painter - - Sylhet Cft - 2,650

Tile Layer - - Cement Bag - 1,499

General Worker - 500 Bricks Nos - 33,000

Security Guard - - Brick Chips Cft - 400

Operator - 18 300*300 Sqm - -

Total 12 2,351 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -
1. Plastering work for 1F.
(Heavy) Equipment
2. Installation window grill for 1F.
Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -
1. Plastering work for 1F.
2. Installation window grill for 1F. Pile Driving Nos - -
3. Installation electrical conduit pipe and pull box for GF.
Roof Hoist Nos - -

Issues

None.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 143 Commencement May 15, 2024 On-going

Site Haimchar Weather Sunny/ 17℃

Date March 5, 2025 Sub-Contractor Provat Kumar Kundu

Division Chittagong Site Engineer Ahmed Sumon

Foundation Type A2 Mobile No. 0177107-9483

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 293 8 mm Kg - -

Pile Driver - - 10 mm Kg - 10,864

Carpenter - 334 12 mm Kg - 3,398


Rebar
Rebar Worker 3 411 16 mm Kg - 7,786

Concrete Worker - 210 20 mm Kg - 6,290

Mason 5 270 25 mm Kg - -

Electrician - 32 Stone Cft - 6,720

Plumber - - Local Cft - 12,900


Sand
Painter - - Sylhet Cft - 2,600

Tile Layer - - Cement Bag - 1,240

General Worker - 213 Bricks Nos - 26,000

Security Guard - - Brick Chips Cft - 750

Operator - 24 300*300 Sqm - -

Total 9 1,787 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -
1. Installation rebar for RF staircase.
(Heavy) Equipment
2. Brick work for GF.
Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -
1. Installation rebar for RF staircase.
2. Brick work for 1F. Pile Driving Nos - -
3. Installation electrical concealed work for GF.
Roof Hoist Nos - -

Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 144 Commencement Pending

Site Chandpur Sadar Weather Sunny / 28℃

Date March 5, 2025 Sub-Contractor Provat Kumar Kundu

Division Chittagong Site Engineer


Foundation Type A2 Mobile No.
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer - 142 8 mm Kg - -

Pile Driver - - 10 mm Kg - -

Carpenter - - 12 mm Kg - -
Rebar
Rebar Worker - - 16 mm Kg - -

Concrete Worker - - 20 mm Kg - -

Mason - - 25 mm Kg - -

Electrician - - Stone Cft - -

Plumber - - Local Cft - -


Sand
Painter - - Sylhet Cft - -

Tile Layer - - Cement Bag - -

General Worker - 20 Bricks Nos - -

Security Guard - - Brick Chips Cft - -

Operator - - 300*300 Sqm - -

Total - 162 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -

No work. (Heavy) Equipment


Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -

No Work Pile Driving Nos - -

Roof Hoist Nos - -

Issues

An official letter from BANBEIS is required to obtain a work permit from UNO.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Report

Site No. 17 Commencement May 07, 2024 On-going

Site Bagherhat Sadar Weather Cloudy/ 28℃

Date March 5, 2025 Sub-Contractor Amanat Enterprise

Division Khulna Site Engineer MD. Aoshan Habib

Foundation Type 22.5m Mobile No. +880 1783-266065

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 312 8 mm Kg - 120

Pile Driver - 226 10 mm Kg - 16,239

Carpenter - 311 12 mm Kg - 2,557


Rebar
Rebar Worker - 533 16 mm Kg - 17,217

Concrete Worker - 302 20 mm Kg - 7,328

Mason 11 308 25 mm Kg - 80

Electrician - 17 Stone Cft - 8,171

Plumber - - Local Cft - 11,080


Sand
Painter - - Sylhet Cft - 7,980

Tile Layer - - Cement Bag - 2,436

General Worker - 386 Bricks Nos - 48,200

Security Guard - 28 Brick Chips Cft - -

Operator - 36 300*300 Sqm - -

Total 12 2,459 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -
1. Brick work for GF.
(Heavy) Equipment
2. Plastering work for outside wall.
Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -
1. Brick work for 1F.
2. Plastering work for outside wall. Pile Driving Nos - -
3. Installation formwork for GF false slab.
Roof Hoist Nos - -

Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Issues
Daily Site Report

Site No. 18 Commencement May 14, 2024 On-going

Site Dacope Weather Cloudy/ 27℃

Date March 5, 2025 Sub-Contractor BOF Korea

Division Khulna Site Engineer SM Nasir Rahman

Foundation Type 28.5m Mobile No. 01312-340760

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 283 8 mm Kg - -

Pile Driver - 202 10 mm Kg - 12,744

Carpenter 15 276 12 mm Kg - 3,064


Rebar
Rebar Worker - 588 16 mm Kg - 21,217

Concrete Worker - 265 20 mm Kg - 6,901

Mason - 38 25 mm Kg - 90

Electrician - 23 Stone Cft - 7,832

Plumber - 102 Local Cft - 14,957


Sand
Painter - - Sylhet Cft - 5,440

Tile Layer - - Cement Bag - 1,905

General Worker - 371 Bricks Nos - 7,900

Security Guard - 42 Brick Chips Cft - 115

Operator - 34 300*300 Sqm - -

Total 16 2,224 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -
1. Installation formwork for 1F column.
(Heavy) Equipment
2. Dismantle formwork for 1F slab.
Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -

1. Concrete casting for 1F column and staircase. Pile Driving Nos - -

Roof Hoist Nos - -

General Worker

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 19 Commencement May 07, 2024 On-going

Site Batiaghata Weather Cloudy/ 29℃

Date March 5, 2025 Sub-Contractor KTM

Division Khulna Site Engineer Kawsar Hossen Khan

Foundation Type 22.5m Mobile No. 01648-489852

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 279 8 mm Kg - -

Pile Driver - 92 10 mm Kg - 10,866

Carpenter 3 309 12 mm Kg - 1,982


Rebar
Rebar Worker 5 519 16 mm Kg - 15,624

Concrete Worker - 209 20 mm Kg - 4,641

Mason 3 36 25 mm Kg - 80

Electrician - 26 Stone Cft - 6,299

Plumber - 2 Local Cft - 29,294


Sand
Painter - - Sylhet Cft - 3,797

Tile Layer - - Cement Bag - 1,200

General Worker - 332 Bricks Nos - 10,600

Security Guard - 28 Brick Chips Cft - -

Operator - 20 300*300 Sqm - -

Total 12 1,852 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -

1. Installation rebar for 1F column. Paint Sqm - -


(18/20 ea)
(Heavy) Equipment
2. Installation formwork and rebar for 1F staircase.
3. Brick work for septic tank. Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -
1. Installation formwork and rebar for 1F column
Pile Driving Nos - -
and staircase.
Roof Hoist Nos - -

Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 27 Commencement May 9, 2024 On-going

Site Keshabpur Weather Cloudy/ 28℃

Date March 5, 2025 Sub-Contractor Amanat Enterprise

Division Khulna Site Engineer Shamshu Ali

Foundation Type 18m Mobile No. 01978-584811

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 288 8 mm Kg - -

Pile Driver - 96 10 mm Kg - 13,066

Carpenter 3 395 12 mm Kg - 3,855


Rebar
Rebar Worker - 605 16 mm Kg - 18,838

Concrete Worker 3 323 20 mm Kg - 6,545

Mason 10 157 25 mm Kg - -

Electrician - 35 Stone Cft - 7,520

Plumber - - Local Cft - 4,750


Sand
Painter - Sylhet Cft - 5,713

Tile Layer - - Cement Bag - 2,030

General Worker - 783 Bricks Nos - 20,400

Security Guard - 44 Brick Chips Cft - 450

Operator - 37 300*300 Sqm - -

Total 17 2,763 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -

1. Brick work for RF. Paint Sqm - -


2. Plastaring work for 1F ceiling.
(Heavy) Equipment
3. Concrete casting for RF short column.
(16/20 ea) Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -
1. Brick work for 1F.
2. Plastaring work for 1F ceiling. Pile Driving Nos - -
3. Concrete casting for RF short column.
Roof Hoist Nos - -

Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 58 Commencement Pending

Site Singra Weather Cloudy / 28℃

Date March 5, 2025 Sub-Contractor KTM

Division Rajshahi Site Engineer


Foundation Type 13.5m Mobile No.
Daily Manpower Material Delivered
Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer - 83 8 mm Kg - -

Pile Driver - - 10 mm Kg - -

Carpenter - - 12 mm Kg - -
Rebar
Rebar Worker - - 16 mm Kg - -

Concrete Worker - - 20 mm Kg - -

Mason - - 25 mm Kg - -

Electrician - - Stone Cft - -

Plumber - - Local Cft - -


Sand
Painter - - Sylhet Cft - -

Tile Layer - - Cement Bag - -

General Worker - - Bricks Nos - -

Security Guard - - Brick Chips Cft - -

Operator - - 300*300 Sqm - -

Total - 83 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -

No Work (Heavy) Equipment


Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -

No Work Pile Driving Nos - -

Roof Hoist Nos - -

Issues

An official letter from BANBEIS is required to obtain a work permit from UNO.

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Report

Site No. 82 Commencement May 12, 2024 On-going

Site Kotalipara Weather Cloudy/ 28℃

Date March 5, 2025 Sub-Contractor Ahmed Traders.

Division Dhaka Site Engineer Ashraf Uddin

Foundation Type 18m Mobile No. 01793-092038

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 271 8 mm Kg - -

Pile Driver - 196 10 mm Kg - 5,390

Carpenter - 36 12 mm Kg - 2,193
Rebar
Rebar Worker 5 236 16 mm Kg - 13,507

Concrete Worker - 120 20 mm Kg - 5,173

Mason - 8 25 mm Kg - -

Electrician - 2 Stone Cft - 4,812

Plumber - - Local Cft - 8,590


Sand
Painter - - Sylhet Cft - 2,750

Tile Layer - - Cement Bag - 1,201

General Worker 6 397 Bricks Nos - 4,350

Security Guard - 11 Brick Chips Cft - 115

Operator - 53 300*300 Sqm - -

Total 12 1,330 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -
1. Installation rebar for grade beam.
(Heavy) Equipment
2. Backfilling for GF slab.
Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -
1. Installation rebar for grade beam.
Pile Driving Nos - -
2. Making the bed on the GF.
Roof Hoist Nos - -

Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 87 Commencement June 1, 2024 On-going

Site Nagarkanda Weather Cloudy/ 29℃

Date March 5, 2025 Sub-Contractor Ahmed Traders.

Division Dhaka Site Engineer Md Ripon Mia

Foundation Type 18m Mobile No. 01768-478645

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 283 8 mm Kg - -

Pile Driver - 239 10 mm Kg - 14,880

Carpenter - 294 12 mm Kg - 3,014


Rebar
Rebar Worker 5 397 16 mm Kg - 16,904

Concrete Worker - 242 20 mm Kg - 8,163

Mason - 29 25 mm Kg - -

Electrician - 20 Stone Cft - 6,201

Plumber - 4 Local Cft - 27,800


Sand
Painter - - Sylhet Cft - 3,900

Tile Layer - - Cement Bag - 1,485

General Worker - 383 Bricks Nos - 5,450

Security Guard - 45 Brick Chips Cft - 240

Operator - 57 300*300 Sqm - -

Total 6 1,993 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -

1. Installation rebar for RF beam. (Heavy) Equipment


Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -

1. Installation rebar for RF beam. Pile Driving Nos - -

Roof Hoist Nos - -

Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 92 Commencement June 12, 2024 On-going

Site Gazaria Weather Cloudy/ 19℃

Date March 5, 2025 Sub-Contractor BOF Korea

Division Dhaka Site Engineer Fuyad Hasan Khan

Foundation Type 13.5m Mobile No. 01959-535416

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 263 8 mm Kg - -

Pile Driver - 131 10 mm Kg - 14,177

Carpenter 7 97 12 mm Kg - 3,038
Rebar
Rebar Worker - 212 16 mm Kg - 12,359

Concrete Worker - 182 20 mm Kg - 7,159

Mason - 12 25 mm Kg - -

Electrician - 11 Stone Cft - 5,648

Plumber - 25 Local Cft - 5,300


Sand
Painter - - Sylhet Cft - 3,150

Tile Layer - - Cement Bag - 1,592

General Worker - 266 Bricks Nos - 7,500

Security Guard - 30 Brick Chips Cft - 400

Operator - 40 300*300 Sqm - -

Total 8 1,269 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -

1. Installation formwork for RF beam. (Heavy) Equipment


Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -

1. Installation formwork for RF beam. Pile Driving Nos - -

Roof Hoist Nos - -

Issues

None

ITP Check Result Planned ITP check

None None

Signed BOF Rep: SAM Nayeem


Daily Site Photos

Daily Activities

Manpower Material

Equipment Inspection
Daily Site Report

Site No. 101 Commencement May 09, 2024 On-going

Site Ghior Weather Cloudy/ 26℃

Date March 5, 2025 Sub-Contractor KTM

Division Dhaka Field Engineer Md. Mahmud

Foundation Type 18m Mobile No. 01829-968545

Daily Manpower Material Delivered


Role Workers Cumulative Type Unit Qt'y Cumulative

Site Engineer 1 279 8 mm Kg - -

Pile Driver - 153 10 mm Kg - 9,538

Carpenter - 337 12 mm Kg - 2,810


Rebar
Rebar Worker 7 367 16 mm Kg - 13,507

Concrete Worker - 247 20 mm Kg - 6,182

Mason - 24 25 mm Kg - -

Electrician - 32 Stone Cft - 6,388

Plumber - - Local Cft - 12,100


Sand
Painter - - Sylhet Cft - 4,010

Tile Layer - - Cement Bag - 1,643

General Worker - 352 Bricks Nos - 12,300

Security Guard - 54 Brick Chips Cft - 200

Operator - 40 300*300 Sqm - -

Total 8 1,885 Tile 600*600 Sqm - -

Today's Work 200*300 Sqm - -


Paint Sqm - -

1. Installation rebar for RF beam. (Heavy) Equipment


Type Unit Qt'y Cumulative

Tomorrow's Work (planned) Excavator Nos - -


Mixture Machine Nos - -

1. Installation rebar for RF beam. Pile Driving Nos - -

Roof Hoist Nos - -

Issues

None

foundation Type Planned ITP check

None None

Signed BOF Rep: SAM Nayeem