The evening drilling report from ONGC on January 23, 2025, details ongoing drilling operations across multiple sites, including S/BHUSHAN, S/GAURAV, S/JYOTI, S/KIRAN, and S/RATNA. Key activities include wireline logging, casing operations, and drilling with various constraints noted such as the need for additional materials and equipment. Weather conditions and personnel on board are also reported, with no accidents reported during the operations.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
13 views
E2301
The evening drilling report from ONGC on January 23, 2025, details ongoing drilling operations across multiple sites, including S/BHUSHAN, S/GAURAV, S/JYOTI, S/KIRAN, and S/RATNA. Key activities include wireline logging, casing operations, and drilling with various constraints noted such as the need for additional materials and equipment. Weather conditions and personnel on board are also reported, with no accidents reported during the operations.