0% found this document useful (0 votes)
15 views6 pages

TAX INVOICE 2ND R.a.bill For 4th Floor Office Civil & Structure Repair Work at Sir Vitha

This document is a tax invoice dated March 2, 2025, for a second running account bill related to civil and structural repair work at Sir Vithaldas Chembers, amounting to a grand total of ₹2,63,256.00. The invoice includes detailed descriptions of demolition and structural repair work, along with corresponding quantities and costs. The total amount for the second R.A. bill is ₹2,23,098.00 after deducting the first R.A. bill amount of ₹3,78,105.00.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views6 pages

TAX INVOICE 2ND R.a.bill For 4th Floor Office Civil & Structure Repair Work at Sir Vitha

This document is a tax invoice dated March 2, 2025, for a second running account bill related to civil and structural repair work at Sir Vithaldas Chembers, amounting to a grand total of ₹2,63,256.00. The invoice includes detailed descriptions of demolition and structural repair work, along with corresponding quantities and costs. The total amount for the second R.A. bill is ₹2,23,098.00 after deducting the first R.A. bill amount of ₹3,78,105.00.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

TAX INVOICE Date: -02-MARCH-2025.

GST NO. 27AIYPS9455M1ZU


To,
M/S. CAPRICON REALTY PRIVATE LIMITED.
Sir Vithaldas Chembers,
16, Samachar marg, Fort Mumbai.

GST No. 27AAACC4297J1ZE.

WORK ORDER NO. WO/ 01 DATE: - 24-DECEMBER-2024.

BILL NO: - 16 DATE: - 02-MARCH-2025.

Sub: - 2ND R.A.BILL for 4th Floor Office civil & Structure repair work at Sir Vithaldas Chembers.

Sr.no Description SAC CODE AMOUNT


1 BILL SHEET ATTACHED 995429

TOTAL Amount 2,23,098.00

Add: - 9% CGST 20,078.82

Add: - 9% SGST 20,078.82

Add: - Round Off. +0.36

Grand Total Amount 2,63,256.00

(Rupees: - TWO LAKH SIXTY-THREE THOUSAND TWO HUNDRED FIFTY-SIX RUPEES ONLY)

FOR RIZVI BUILD CON.

AUTHORISED SIGNATORY

1|Page
To, DATE: - 02-MARCH-2025.
M/S. CAPRICON REALTY PRIVATE LIMITED.
Sir Vithaldas Chembers,
16, Samachar marg, Fort Mumbai.

KINDLY ATTN: - PANORA INFRASTRUCTURE PVT LTD.

Sub: - 2nd R.A.BILL ABSTARCT SHEET for 4th Floor Office civil & Structure repair work at Sir Vithaldas
Chembers.

Sr.no Description Unit 1st RA 2nd RA Total Rate Amount


Qty. Qty. Qty.
A Demolition work.
1. Removing old Pantry loft tank with
Plumbing Fitting, stacking at one place,
complete. L.S 4,650.00
2. Removing M S Loft Toilet & Pantry, cleaning
complete. L.S 2,790.00
3. Remove old Wooden window, shifting to Gr.
Floor, etc. Complete. No 17 0 17 930 15,810.00
4. Breaking Existing Brick wall, Pantry & basin
platform Wooden Partition, etc. complete. Sft 530 0 530 27.90 14,787.00
5. Removing existing flooring tile with bedding
material up to slab, cleaning complete. Sft 3817 275 4092 23.25 95,139.00
6. Removing existing plaster from ceiling,
beam, column & wall, complete. Sft 1577 854 2431 23.25 56,520.75
7. Debris removal by truck cleaning complete. No 7 2 9 7440 66,960.00
8. Gr. floor flooring upto lift & 1st floor
staircase covering with plastic complete. LS 1 23250 23,250.00
Total A 2,79,906.75
B Structure Repair & Civil Work.
1. Providing & applying Rusticide to existing
steel, Cleaning by wire brush etc. Complete.
Providing & Applying Fixoprime with
cement slurry to existing reinforcement
steel etc. Complete. Sft 0 391 391 209.25 81,816.75
Providing & applying hand packing by using
Polymer ready-mix bag (Fosroc make),
curing etc. upto 25mm 1st layer
2. Providing New reinforcement steel for
Ceiling, beam & Column, cutting placing,
tieing with binding tar, complete. Kg 0 93 93 93 8,649.00
4. Providing & Filling Micro Concrete for beam
& Column, curing complete. Kg 0 200 200 74.40 14,880.00
2|Page
5. Providing & Making plywood shuttering for
Beam & Column. The same will be removed
after completing of work. Complete. Sft 0 12 12 97.65 1,171.80
6. Providing & applying Cement plaster in
C.M.1:3, curing etc. Complete. Ceiling Beam
Column & Wall. Sft 1577 854 2431 88.35 2,14,778.85

Total B 3,21,296.40

Total A + B 6,01,203.15

Less: - 1st R A bill Amount. -3,78,105.00

2nd R A Bill Amount Total. 2,23,098.00

(Rupees: - TWO LAKH TWENTY-FOUR THOUSAND ONE HUNDRED FORTY-FOUR RUPEES ONLY)

FOR RIZVI BUILD CON.

AUTHORISED SIGNATORY

3|Page
M/s. RIZVI BUILD CON.
Site: 4TH FLOOR OFFICE NO. 401 AT SVC FORT MUMBAI. DATE : 02-03-2025
2nd R A Bill of MEASUREMENT SHEET
Sr No Description No Lenght widht Height Qnty Unit
A Demoilition work.
5 Breaking old brick bat coba,…….complete.
bathroom sunk portoin 2 16.5 8.33 274.89
Total. 275 Sft
6 Removing old plaster from wall,…....etc. complete.
partition wall 1 25.83 8.92 230.40
bathroom staircase wall 1 16.08 9.75 156.78
bathroom window wall 1 9.5 8.92 84.74
less;- window -1 5.5 5 -27.50
window jam (5.5+5) x 2 = 23 1 23 1.33 30.59
beam above window 1 5 1.25 6.25
sunk portion ceiling 0.5 4.5 1.25 2.81
beam side bottom 1 4 1.25 5.00
bathroom ceiling 1 3 3 9.00
ceiling 1 0.67 0.67 0.45
beam bottom 1 16.5 2.5 41.25
ceiling 1 13 7.42 96.46
ceiling 1 4 2 8.00
ceiling 1 7.5 5 37.50
ceiling 1 1.5 1.5 2.25
beam bottom 1 7 1.5 10.50
column bathroom side 1 1.58 6.58 10.40
ceiling gabda 17 1 1 17.00
Bank of baroda side window above 5 6 0.42 12.60
hindustan unilever window above 5 4.5 0.5 11.25
beam 1 2.25 1 2.25
window dhar beam road side 1 4 0.58 2.32
window dhar beam road side 1 6.83 0.58 3.96
window dhar beam road side 1 6.83 0.67 4.58
window dhar beam road side 2 6.83 0.83 11.34
window dhar beam road side 1 6.83 1.58 10.79
window dhar beam road side 1 1.75 0.83 1.45
centre beam 1 10.25 1.83 18.76
Chajja bottom 1 1 7 1.25 8.75
Chajja bottom 2 1 6 1.5 9.00
Chajja bottom 3 1 7 1.33 9.31
Chajja bottom 4 1 3.5 1 3.50
road side column 1 3.83 2.42 9.27
4|Page
column 1 1.33 1.25 1.66
column 1 1 1.5 1.50
column 1 1.17 0.75 0.88
Total. 845 Sft
7 Debris remove by truck,…..complete.
date:- 27-January-2025 1 1
date:- 14-Febuary-2025 1 1
Total. 2 No
B Structure repair work.
1 P & L Polymer Treatment,…….complete.
column 1) BARODA 14/01/25. 1 1.25 7.5 9.38
column 2) BARODA 14/01/25. 1 1.25 4.42 5.53
column 3) BARODA 14/01/25. 1 1.25 1.67 2.09
window lintel BARODA 14/01/25. 2 1.25 0.5 1.25
window lintel BARODA 14/01/25. 1 4.33 0.5 2.17
column 4) BARODA 14/01/25. 1 1.25 2.75 3.44
window beam 14/01/25. 1 5.58 1.25 6.98
window beam 14/01/25. 1 6.92 0.67 4.64
bathroom staircase beam 1 7.83 0.58 4.54
sunk portion beam 1 4 1.25 5.00
beam sunk 1 4.5 1.25 5.63
window beam 2 5.5 1.33 14.63
ceiling 1 3 3 9.00
ceiling 1 1 0.67 0.67
beam botto, 1 8.83 1.42 12.54
beam bottom 1 3 0.83 2.49
beam b 1 1.5 0.83 1.25
ceiling 1 8.92 5.5 49.06
ceiling 1 3.25 1.67 5.43
ceiling 1 1 1.25 1.25
beam bottom 1 6.67 1.33 8.87
column 1 5.25 0.67 3.52
beam 1 3 0.5 1.50
window beam BOB side 1 6.92 0.67 4.64
column BOB side 1) 1 1.33 5.42 7.21
column 2) 1 1.33 3 3.99
column 3) 1 1.33 2 2.66
hindustan side column 4) 1 1.33 8.92 11.86
column 5) 1 1.58 7 11.06
beam 1 2.5 1.75 4.38
beam 1 1.75 0.83 1.45
road side beam 6 2 3.5 0.67 4.69
5|Page
road side beam 5 2 6.83 1.92 26.23
road side beam 4 2 6.83 1.92 26.23
road side beam 3 2 6.83 2.08 28.41
road side beam 2 2 6.83 2.08 28.41
road side beam 1 2 6.83 2.83 38.66
road side beam 1 2 1.75 0.75 2.63
road side column 1 2.42 3.83 9.27
centre beam 1 10.25 1.75 17.94
Total 391 Sft
2 P & F New reinforcement steel,….complete.
road side Column 12mm dia tor steel 3 4.5 13.5
road side beam 1 to 5 ( 3 x 5 ) = 15 no 15 9.5 142.5
hindustan side column vertical 3 12 36
bathroom ceiling 5 2.5 12.5
window beam 3 8 24
sunk portion 1 6 6
234.5 71.49
Total A 64 Kg
road side Column 8mm dia tor steel 7 2.42 16.94
road side beam 1 to 5 67 2.5 167.5
Beam ring 2 1.67 3.34
hindustan side column ring 22 1.5 33
BOB side column 17 1.5 25.5
bathroom ceiling 5 4 20
ceiling 3 3 9
bathroom beam 8 1.17 9.36
bathroom beam 2 1.25 2.5
bathroom beam 6 2.5 15
Beam ring 8 1.25 10
246.28 75.09
Total B 29 Kg
Total A + B 93 KG
4 P & F Micro concrete curing…complete.
hindustan column 8 bag x 25 kg per 200 KG
5 P & M plywood shuttering curing,….....complete.
hindustan column 1 1.33 8.92 11.86
Total. 12 Sft
6 P & A Cement finished plaster …complete.
same qty of item no. A-6 Total. 845 Sft