TAX INVOICE Date: -02-MARCH-2025.
GST NO. 27AIYPS9455M1ZU
To,
M/S. CAPRICON REALTY PRIVATE LIMITED.
Sir Vithaldas Chembers,
16, Samachar marg, Fort Mumbai.
GST No. 27AAACC4297J1ZE.
WORK ORDER NO. WO/ 01 DATE: - 24-DECEMBER-2024.
BILL NO: - 16 DATE: - 02-MARCH-2025.
Sub: - 2ND R.A.BILL for 4th Floor Office civil & Structure repair work at Sir Vithaldas Chembers.
Sr.no Description SAC CODE AMOUNT
1 BILL SHEET ATTACHED 995429
TOTAL Amount 2,23,098.00
Add: - 9% CGST 20,078.82
Add: - 9% SGST 20,078.82
Add: - Round Off. +0.36
Grand Total Amount 2,63,256.00
(Rupees: - TWO LAKH SIXTY-THREE THOUSAND TWO HUNDRED FIFTY-SIX RUPEES ONLY)
FOR RIZVI BUILD CON.
AUTHORISED SIGNATORY
1|Page
To, DATE: - 02-MARCH-2025.
M/S. CAPRICON REALTY PRIVATE LIMITED.
Sir Vithaldas Chembers,
16, Samachar marg, Fort Mumbai.
KINDLY ATTN: - PANORA INFRASTRUCTURE PVT LTD.
Sub: - 2nd R.A.BILL ABSTARCT SHEET for 4th Floor Office civil & Structure repair work at Sir Vithaldas
Chembers.
Sr.no Description Unit 1st RA 2nd RA Total Rate Amount
Qty. Qty. Qty.
A Demolition work.
1. Removing old Pantry loft tank with
Plumbing Fitting, stacking at one place,
complete. L.S 4,650.00
2. Removing M S Loft Toilet & Pantry, cleaning
complete. L.S 2,790.00
3. Remove old Wooden window, shifting to Gr.
Floor, etc. Complete. No 17 0 17 930 15,810.00
4. Breaking Existing Brick wall, Pantry & basin
platform Wooden Partition, etc. complete. Sft 530 0 530 27.90 14,787.00
5. Removing existing flooring tile with bedding
material up to slab, cleaning complete. Sft 3817 275 4092 23.25 95,139.00
6. Removing existing plaster from ceiling,
beam, column & wall, complete. Sft 1577 854 2431 23.25 56,520.75
7. Debris removal by truck cleaning complete. No 7 2 9 7440 66,960.00
8. Gr. floor flooring upto lift & 1st floor
staircase covering with plastic complete. LS 1 23250 23,250.00
Total A 2,79,906.75
B Structure Repair & Civil Work.
1. Providing & applying Rusticide to existing
steel, Cleaning by wire brush etc. Complete.
Providing & Applying Fixoprime with
cement slurry to existing reinforcement
steel etc. Complete. Sft 0 391 391 209.25 81,816.75
Providing & applying hand packing by using
Polymer ready-mix bag (Fosroc make),
curing etc. upto 25mm 1st layer
2. Providing New reinforcement steel for
Ceiling, beam & Column, cutting placing,
tieing with binding tar, complete. Kg 0 93 93 93 8,649.00
4. Providing & Filling Micro Concrete for beam
& Column, curing complete. Kg 0 200 200 74.40 14,880.00
2|Page
5. Providing & Making plywood shuttering for
Beam & Column. The same will be removed
after completing of work. Complete. Sft 0 12 12 97.65 1,171.80
6. Providing & applying Cement plaster in
C.M.1:3, curing etc. Complete. Ceiling Beam
Column & Wall. Sft 1577 854 2431 88.35 2,14,778.85
Total B 3,21,296.40
Total A + B 6,01,203.15
Less: - 1st R A bill Amount. -3,78,105.00
2nd R A Bill Amount Total. 2,23,098.00
(Rupees: - TWO LAKH TWENTY-FOUR THOUSAND ONE HUNDRED FORTY-FOUR RUPEES ONLY)
FOR RIZVI BUILD CON.
AUTHORISED SIGNATORY
3|Page
M/s. RIZVI BUILD CON.
Site: 4TH FLOOR OFFICE NO. 401 AT SVC FORT MUMBAI. DATE : 02-03-2025
2nd R A Bill of MEASUREMENT SHEET
Sr No Description No Lenght widht Height Qnty Unit
A Demoilition work.
5 Breaking old brick bat coba,…….complete.
bathroom sunk portoin 2 16.5 8.33 274.89
Total. 275 Sft
6 Removing old plaster from wall,…....etc. complete.
partition wall 1 25.83 8.92 230.40
bathroom staircase wall 1 16.08 9.75 156.78
bathroom window wall 1 9.5 8.92 84.74
less;- window -1 5.5 5 -27.50
window jam (5.5+5) x 2 = 23 1 23 1.33 30.59
beam above window 1 5 1.25 6.25
sunk portion ceiling 0.5 4.5 1.25 2.81
beam side bottom 1 4 1.25 5.00
bathroom ceiling 1 3 3 9.00
ceiling 1 0.67 0.67 0.45
beam bottom 1 16.5 2.5 41.25
ceiling 1 13 7.42 96.46
ceiling 1 4 2 8.00
ceiling 1 7.5 5 37.50
ceiling 1 1.5 1.5 2.25
beam bottom 1 7 1.5 10.50
column bathroom side 1 1.58 6.58 10.40
ceiling gabda 17 1 1 17.00
Bank of baroda side window above 5 6 0.42 12.60
hindustan unilever window above 5 4.5 0.5 11.25
beam 1 2.25 1 2.25
window dhar beam road side 1 4 0.58 2.32
window dhar beam road side 1 6.83 0.58 3.96
window dhar beam road side 1 6.83 0.67 4.58
window dhar beam road side 2 6.83 0.83 11.34
window dhar beam road side 1 6.83 1.58 10.79
window dhar beam road side 1 1.75 0.83 1.45
centre beam 1 10.25 1.83 18.76
Chajja bottom 1 1 7 1.25 8.75
Chajja bottom 2 1 6 1.5 9.00
Chajja bottom 3 1 7 1.33 9.31
Chajja bottom 4 1 3.5 1 3.50
road side column 1 3.83 2.42 9.27
4|Page
column 1 1.33 1.25 1.66
column 1 1 1.5 1.50
column 1 1.17 0.75 0.88
Total. 845 Sft
7 Debris remove by truck,…..complete.
date:- 27-January-2025 1 1
date:- 14-Febuary-2025 1 1
Total. 2 No
B Structure repair work.
1 P & L Polymer Treatment,…….complete.
column 1) BARODA 14/01/25. 1 1.25 7.5 9.38
column 2) BARODA 14/01/25. 1 1.25 4.42 5.53
column 3) BARODA 14/01/25. 1 1.25 1.67 2.09
window lintel BARODA 14/01/25. 2 1.25 0.5 1.25
window lintel BARODA 14/01/25. 1 4.33 0.5 2.17
column 4) BARODA 14/01/25. 1 1.25 2.75 3.44
window beam 14/01/25. 1 5.58 1.25 6.98
window beam 14/01/25. 1 6.92 0.67 4.64
bathroom staircase beam 1 7.83 0.58 4.54
sunk portion beam 1 4 1.25 5.00
beam sunk 1 4.5 1.25 5.63
window beam 2 5.5 1.33 14.63
ceiling 1 3 3 9.00
ceiling 1 1 0.67 0.67
beam botto, 1 8.83 1.42 12.54
beam bottom 1 3 0.83 2.49
beam b 1 1.5 0.83 1.25
ceiling 1 8.92 5.5 49.06
ceiling 1 3.25 1.67 5.43
ceiling 1 1 1.25 1.25
beam bottom 1 6.67 1.33 8.87
column 1 5.25 0.67 3.52
beam 1 3 0.5 1.50
window beam BOB side 1 6.92 0.67 4.64
column BOB side 1) 1 1.33 5.42 7.21
column 2) 1 1.33 3 3.99
column 3) 1 1.33 2 2.66
hindustan side column 4) 1 1.33 8.92 11.86
column 5) 1 1.58 7 11.06
beam 1 2.5 1.75 4.38
beam 1 1.75 0.83 1.45
road side beam 6 2 3.5 0.67 4.69
5|Page
road side beam 5 2 6.83 1.92 26.23
road side beam 4 2 6.83 1.92 26.23
road side beam 3 2 6.83 2.08 28.41
road side beam 2 2 6.83 2.08 28.41
road side beam 1 2 6.83 2.83 38.66
road side beam 1 2 1.75 0.75 2.63
road side column 1 2.42 3.83 9.27
centre beam 1 10.25 1.75 17.94
Total 391 Sft
2 P & F New reinforcement steel,….complete.
road side Column 12mm dia tor steel 3 4.5 13.5
road side beam 1 to 5 ( 3 x 5 ) = 15 no 15 9.5 142.5
hindustan side column vertical 3 12 36
bathroom ceiling 5 2.5 12.5
window beam 3 8 24
sunk portion 1 6 6
234.5 71.49
Total A 64 Kg
road side Column 8mm dia tor steel 7 2.42 16.94
road side beam 1 to 5 67 2.5 167.5
Beam ring 2 1.67 3.34
hindustan side column ring 22 1.5 33
BOB side column 17 1.5 25.5
bathroom ceiling 5 4 20
ceiling 3 3 9
bathroom beam 8 1.17 9.36
bathroom beam 2 1.25 2.5
bathroom beam 6 2.5 15
Beam ring 8 1.25 10
246.28 75.09
Total B 29 Kg
Total A + B 93 KG
4 P & F Micro concrete curing…complete.
hindustan column 8 bag x 25 kg per 200 KG
5 P & M plywood shuttering curing,….....complete.
hindustan column 1 1.33 8.92 11.86
Total. 12 Sft
6 P & A Cement finished plaster …complete.
same qty of item no. A-6 Total. 845 Sft
6|Page