This document presents a calculation report for the MV current transformers (CT) and voltage transformers (VT) at the Sebzor Hydropower Plant, based on Standard IEC-61869-2. It details the technical data calculations for both CTs and VTs, concluding that the selected transformers meet the required specifications for their respective applications. The report emphasizes that the CTs and VTs are appropriately rated to handle the expected loads and short circuit conditions.

Uploaded by

drtao
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views

CT & VT Calculation (D)

This document presents a calculation report for the MV current transformers (CT) and voltage transformers (VT) at the Sebzor Hydropower Plant, based on Standard IEC-61869-2. It details the technical data calculations for both CTs and VTs, concluding that the selected transformers meet the required specifications for their respective applications. The report emphasizes that the CTs and VTs are appropriately rated to handle the expected loads and short circuit conditions.

Uploaded by

drtao
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

Content

INTRODUCTION ......................................................................................................................... 3
1. CT technical data calculation ................................................................................................... 4
2. CT selection Conclusion .......................................................................................................... 7
3. VT technical data calculation ................................................................................................... 7
4. VT selection Conclusion.......................................................................................................... 7

2
INTRODUCTION
This calculation is based on Standard IEC-61869-2. The purpose of this calculate
report is to check the ratio and burden of the MV CT & VT of Sebzor Hydropower
Plant.

The following parameters is the basic parameter for this calculation.


Rated current of Ir=411.1A
generator
Rated current of Ir=17.5
auxiliary transformer
Max short circuit Ik=17.519kA
current at 6.6kV side

3
1. CT technical data calculation

Total Load
Max Primary Cable length
Calculation
Device Load list Current and section
TA coil No. CT data Cc ①
VA
A m mm2 VA

TA in Generator neutral 600/5A,5P20, 20VA


Relay DMP321CF: 0.5 411.1 90 4 13.35
coil 1

TA in Generator neutral 600/5A,5P20, 20VA


Relay DMP320CF: 0.5 411.1 90 4 13.35
coil 2

TA in G1/2/3 Feeder 600/5A,0.5S, 20VA


Energy meter DTSD341: 6 411.1 40 4 13.1
cubicle coil 1

TA in G1/2/3 Feeder 600/5A, 5P20, 20VA


Relay DMP320CF: 0.5 411.1 40 4 7.5
cubicle coil 2

600/5A,0.5, 20VA AVR: 8


TA in G1/2/3 Feeder 15.3
Electric meter ACR: 0.2 411.1 40 4
cubicle coil 3
Total: 8.2

TA in G1/2/3 Feeder 600/5A,0.5, 20VA


Governor : 1 411.1 40 4 7.1
cubicle coil 4

TA in MT1/2 Feeder 1500/5A,5P20,20VA 411.1*3=1233.


Relay DMP321: 0.5 5 4 3.575
cubicle coil 1 3
TA in MT1/2 Feeder 1500/5A,0.5,10VA 411.1*3=1233.
Relay DMP321: 0.5 5 4 3.575
cubicle coil 2 3

TA in MT1/2 Feeder 1500/5A,0.5S,20VA 411.1*3=1233.


Elster A1805: 0.0025 40 4 7.1025
cubicle coil 3 3

TA in AT1/2 Feeder 200/5A,5P20,20VA


Relay DMP324: 0.5 17.5 5 4 3.575
cubicle coil 1

TA in AT1/2 Feeder 200/5A,0.5,10VA


Relay DMP324: 0.5 17.5 5 4 3.575
cubicle coil 2

TA in AT1/2 Feeder 200/5A,0.5S,20VA


Elster A1805: 0.0025 17.5 40 4 7.1025
cubicle coil 3

TA in Bus Section 1500/5A,5P20,20VA


Relay DMP324: 0.5 411.1*2=822.2 5 4 3.575
Coupling Cubicle coil 1

TA in Bus Section 1500/5A,0.5,10VA 3.575


Relay DMP324: 0.5 411.1*2=822.2 5 4
Coupling Cubicle coil 2
TA in Bus Section 1500/5A,0.5S,20VA 7.1025
Elster A1805: 0.0025 411.1*2=822.2 40 4
Coupling Cubicle coil 3
Note①: The calculation total load Cc of the CT is:
Cc=Cb+Cwire+Ccon= Cb+(ρcu*L/A)*In2+Rcon*In2
where Cb is the load of devices.
In is the rated secondary current of CT, here is 5A.
A is section of connection cable.
L is length of connection cable.

ρcu is the resistance coefficient, typically is 0.0184mm2/m.


Cwire is the capacity consumed by connection cable, Cwire=(ρcu*L/A)*In2=0.0184*L/A*52.
Rcon is the contact resistance. Typically is 0.1
Ccon is the capacity consumed by contact resistance,Ccon= Rcon*In2=0.1*52=2.5VA
The above formula and Rcon (contact resistance) is selected according to Chinese Standard DL/T 866-2015, “Code for selection and calculation
of current transformer and voltage transformer”.
2. CT selection Conclusion

According to the above calculation, we can see the ratio of the CT is suitable.
According to the IEC-61869-2, the actual secondary load of the CT should be within
25%~100% of the rated burden for measurement CT. Hence the selected CT can
fulfill the requirement.

Note: Considering the short circuit current level of 6.6kV system, the ratio of CT in
AT1/2 Feeder cubicle should be 200/5A (Smaller ratio cannot fulfil the short circuit
current requirement).

3. VT technical data calculation


Total
Device Load list Device
TV No. Data
Load

VA VA

AVR: 10

TV in G1/2/3 Synchro device DZZB-4: 1


Feeder cubicle 0.5,30VA Frequency sensor CPZX318: 1 14.2
coil 1 Electric meter ACR: 0.2
Elster A1805: 2

TV in G1/2/3 3P,30VA
Feeder cubicle Relay DMP321CF: 0.2 0.2
coil 2

TV in G1/2/3 3P,30VA
Feeder cubicle Relay DMP321CF: 0.2 0.2
coil 3

0.5,30VA Synchro device DZZB-4: 1


TV in Bus I/II VT
Frequency sensor CPZX318: 1 8
Cubicle coil 1
Elster A1805: 2*3

TV in Bus I/II VT 3P,30VA Relay DMP321: 0.2


0.4
Cubicle coil 2 Relay DMP324: 0.2

TV in Bus I/II VT 3P,30VA Relay DMP321: 0.2


0.4
Cubicle coil 3 Relay DMP324: 0.2

4. VT selection Conclusion
7
According to the above calculation, we can see total load device load is smaller than
VT burden. Hence the selected VT can fulfill the requirement.