CT & VT Calculation (D)
CT & VT Calculation (D)
INTRODUCTION ......................................................................................................................... 3
1. CT technical data calculation ................................................................................................... 4
2. CT selection Conclusion .......................................................................................................... 7
3. VT technical data calculation ................................................................................................... 7
4. VT selection Conclusion.......................................................................................................... 7
2
INTRODUCTION
This calculation is based on Standard IEC-61869-2. The purpose of this calculate
report is to check the ratio and burden of the MV CT & VT of Sebzor Hydropower
Plant.
3
1. CT technical data calculation
Total Load
Max Primary Cable length
Calculation
Device Load list Current and section
TA coil No. CT data Cc ①
VA
A m mm2 VA
According to the above calculation, we can see the ratio of the CT is suitable.
According to the IEC-61869-2, the actual secondary load of the CT should be within
25%~100% of the rated burden for measurement CT. Hence the selected CT can
fulfill the requirement.
Note: Considering the short circuit current level of 6.6kV system, the ratio of CT in
AT1/2 Feeder cubicle should be 200/5A (Smaller ratio cannot fulfil the short circuit
current requirement).
VA VA
AVR: 10
TV in G1/2/3 3P,30VA
Feeder cubicle Relay DMP321CF: 0.2 0.2
coil 2
TV in G1/2/3 3P,30VA
Feeder cubicle Relay DMP321CF: 0.2 0.2
coil 3
4. VT selection Conclusion
7
According to the above calculation, we can see total load device load is smaller than
VT burden. Hence the selected VT can fulfill the requirement.