STRAP BEAM 1
STRAP BEAM 1
STRAP BEAM - 1
PA - Factored = 314 kN Ultimate Load at Column/Footing A
PB - Factored = 387 kN Ultimate Load at Column Footing B
Ca = 0.35 m Column A Dimension
Cb = 0.35 m Column B Dimension
CA-B = XA-B = Z 5 m Distance from center of column A to center of column B
qa = 180 kPa Allowable Soil Bearing Capacity
Embedment = 1500 mm Depth of Excavation
Density, gs = 18 kN/m^3 Unit Weight of Soil
Concrete Density, gc = 24 kN/m^3 Density of Concrete
Trial "t" = 300 mm Trial Thickness of Footing
B= 1.75 m Width of Footing
Load Computations
PA - Service = 224.29 kN Serive Load at Column/Footing A
PB - Service = 276.43 kN Serive Load at Column Footing B
Ps Total = 500.71 kN Total Service Loads
Pu Total = 701.00 kN Total Factored Loads
LA1 = 9.24
LA2 = 1.11
LA = 1.15 Length of Footing A
LB = 1.14 Length of Footing B
PLAN VIEW
LA = 1.15 LB = 1.14
1.75
1.75
0.35 0.35
PA - Factored = 314 ELEVATION VIEW PB - Factored = 387
PA - Service = 224.285714285714 PB - Service = 276.4286
XA-B
5
5 4.6
A 0.4 B
1 2 3 4 5 6 7
Distances 0.35 0.8 3.455 0.395 0.35 0.395
Footing 1.15 1.14
Length
-9.868 9.87
SHEAR DIAGRAM
202.65
53.57
28.16 28.16
0.00 0.00
-174.48
-270.30
MOMENT DIAGRAM
49.73
0.004.69 0.00
-16.05
-113.35
-114.65
-16.05
-113.35
-114.65
Label STRB - 1
(f'c)^0.5*b*d = 383.54 kN
ØVc = Ø1/6(f'c)^0.5*b*d = 47.94 kN Factored Shear Capacity of Concrete
ØVc / 2 = 23.97 kN No need for Stirrups if this value is greater than Vu Notes: Stirrups is Needed
Vs = (Vu-ØVc)/Ø -26.37 kN Required Shear Strength for Stirrups
s = Avfyd/vs -569.87 mm Computed Spacing of Stirrups based on the Shear Required
Ø2/3(f'c)^0.5*b*d = 191.77 kN This value must be greater than Vs, to limit bursting and crushing of concrete
Ø2/3(f'c)^0.5*b*d is > Vs therefore, Section is Safe
1/3(f'c)^0.5*b*d = 127.85 kN If this value is greater than Vs, max spacing is S = d/2 s= 200 or 600mm
1/3(f'c)^0.5*b*d = 127.85 kN If this value is less than Vs, max spacing is S = d/4 s= 100 or 300mm
1/3(f'c)^0.5*b*d is > Vs therefore, max spacing of stirrups is = 200 mm
d/4 = 105.375 mm
Hoop Reinfocement at twice 6db = 96 mm
depth from the face of the support
= = 150 mm
governs = 90 mm
Stirrups Spacing
S1 = 200 Computed Spacing of Stirrups based on the Shear Required
S2 = 200 Maximum spacing of stirrups
S3 = 90 Hoop Reinforcement
governs (sh) = 90 mm
2h = 1000 Sh = 90 mm 11 pcs
3h = 1500 St = 150 mm 10 pcs
Schedule of Stirrups/Hoops : 1 @50mm, 11 pcs @ 90 mm, 10 pcs @ 150 mm, Rest @ 200 mm
STRUCTURAL ANALYSIS
DESIGN REPORT
Footing Name F2
Column Type Edge Footing
Design Paramters
REQUIRED DIMENSIONS
B = 1750 mm Dimension of Footing along Z Dir
Punching Shear
PUNCHING SHEAR CHECK
Used d = 217 mm
bo = 2268 mm Critical Length for Punching
Punching Area = 1691011 mm2
VuPunching = 295.7951 KN Punching Shear Force
d= 217 mm
Mu = 49.28 kN-m steel ratio, r = 0.0051
Rn = 1.011227 required As = 1933.27
rrqrd = 0.00379 number of bars = 9.62
rmin = 0.0051 say = 10.00 pcs - 16 mmf Both Ways
USE t = 300 mm
STRUCTURAL ANALYSIS
DESIGN REPORT
Design Paramters
REQUIRED DIMENSIONS
B = 1750 mm Dimension of Footing along Z Dir
Punching Shear
PUNCHING SHEAR CHECK
Used d = 217 mm
bo = 2268 mm Critical Length for Punching
Punching Area = 1673511 mm2
VuPunching = 292.7339 KN Punching Shear Force
d= 217 mm
Mu = 48.86 kN-m steel ratio, r = 0.0051
Rn = 1.011227 required As = 1933.27
rrqrd = 0.00379 number of bars = 9.62
rmin = 0.0051 say = 10.00 pcs - 16 mmf Both Ways
USE t = 300 mm