LEPHATA PROFORMA

This document is a proforma invoice for City Power Pty Ltd detailing various services and items related to electrical and construction work. It includes a list of items with descriptions, quantities, and banking details for payment. The document is structured to facilitate billing for specific tasks and materials used in projects.

Uploaded by

Lucas Nong
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views22 pages

LEPHATA PROFORMA

This document is a proforma invoice for City Power Pty Ltd detailing various services and items related to electrical and construction work. It includes a list of items with descriptions, quantities, and banking details for payment. The document is structured to facilitate billing for specific tasks and materials used in projects.

Uploaded by

Lucas Nong
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 22

Create a New Proforma

§
cK[£{“+
£+
sJs³{K+3“{k‚“{3{“k
CITY POWER PTY LTD
RANDBURG
ATT: TEAM LEADER
DATE:
PROFORMA NO:
CONTRACT NO:4600002924
JOB NO:
CITY POWER VAT NO:4710191182
AREA:
ADDRESS:
CLIENT City Power

Pro-forma
Item Description Unit Qty Rate Amount

Banking Details Sub Total R 0.00


First National Bank Vat R 0.00
Account holder: Lephata la basha trading and projects
Account no 62309247816 TOTAL R 0.00
Branch name: North Cliff
Branch Code: 253 705

Tel: 011 314 1882 Registration Number: 2010/070024/23 Address: No 81 Brand Road
Fax:011 314 3529 VAT Number: 4550264735 President Park
[email protected] Midrand
1685
Item Description
10 soil_dig, b.fill ,comp hand pickable
20 soil_machine exc_dig, b.fill, comp
30 lose rocks/bldrs_soil_dig, b.fill ,comp
40 lose rocks/bldrs_soil_mac, b.fill ,comp
50 rock_ wedge & power drill
60 pole hole_removal of rock
70 rock requiring blasting
80 tar paving 60mm thick_cut,& remove
90 concrete 100mm thick _cut & remove
100 interlock blocks lift & stack
110 lifting & stck of paving bricks
120 concrete slabs lifting & stacking
130 lift & stack preservation of lawn grass
140 reinstate_used inter lock blocks
150 reinstate_new inter lock blocks
160 reinstate_used concrete slabs
170 reinstate_ new concrete slabs
180 reinstate_used paving bricks
190 reinstate_new paving bricks
200 backfill trench & compact only
210 supply dry clean river sand
220 supply acceptable filling soil
230 reinstate lawn
240 Supply and install new lawn
250 reinstate and supply new tar
260 handling and supply ready mix concrete
270 reinstate concrete (excld trench Crete)
280 supply & b.fill trench _ ready mix
290 trench on concrete road
300 disposal of rock from excavations
310 rock, rubble, spoil_removal & disposal
320 create walkway over trench
330 sign boards _ JRA cop
340 Obtain way leave information
350 Install Danger barriers for trenches
360 Shoring of trench walls
370 Pumping out flooded trench
380 Location of services by Cable locator
390 Traffic deviation
400 Laying of 300mm x3 MV 3c cable
410 Laying of 185mm x3 MV 3c cable
420 Laying of 95mm x3 MV 3c cable
430 Laying of 20 pair control
440 Laying of LV 4core cable 70 to185mm2
450 Laying of LV 4core cable25 to35mm3
460 Laying of LV cable 16mm2
470 Laying plastic marker tape
480 Installation of sleeves 110 mm
490 Supply and install110mm steel pipe
500 Drawn cable = >95 mm2 through pipe
510 Drawn cable < 95 mm2 through pipe
520 Drawn LV pilot cable<35 mm2 through pipe
530 MV Joint for 300mm x 3core cable
540 MV Joint for 185mm x 3core cable
550 MV Joint for 95mm x 3core cable
560 LV Joint for 185 x4c cable
570 LV Joint for 120 x4c cable
580 LV Joint for 95 x4c cable
590 LV Joint for 25mm & 35mm x4c cable
600 LV Joint for 16 x4c cable
610 MV_make-off & term. >= 300mm x 3 core
620 MV_make-off & term. >= 185mm x 3 core
630 MV_make-off & term. >= 95mm x 3 core
640 LV_make-off & term. >= 185mm x 4 core
650 LV_make-off & term. >= 120mm x 4 core
660 LV_make-off & term. >= 95mm x 4 core
670 LV_make-off & term>= 25mm&35mm x 4 core
680 LV_make-off & term. >= 16mm x 4 core
690 LV_make-off & term.>= 185mm_single heads
700 Seal 300mm MV cable ends
710 Seal 185mm MV cable ends
720 Seal 95mm MV cable ends
730 Seal185mm LV cable ends
740 Earth MVC & MSS install earths incl exca
750 Inst. earth spike& connect incl. CAD wld
760 supply & install earth spike
770 repair earth mats
780 compl inst MSS (excl cable & mv swg )
790 fill LV and MV cavities with river sand
800 install precast foundations incl prep gr
810 Install pole mounted distrib. transf.
820 Complete install. of TSS as specified
830 position MV transformers
840 install MV swg RMU
850 install mv meter cubicle
860 Installation of MV VCB + meter cubicle
870 install MV vcb cubicle units
880 backfill ducts with dry clean river sand
890 cement. top ducts Supply,intsalll WxL
900 sign write complete MV sub
910 designation of sign writing only
920 design LV compt
930 discon, recon & Test Lv Term (ex LV taped term)
940 Discon, recon & test excl. MV taped term
950 install chamber light wiring
960 Installation maximum demand meter
970 Installation & connecting of kw/h meter
980 Installation of test block and fuses
990 Connect test block and fuses
1000 ints,con_ 3_ kwh meter&80A mcb&<25m_cab
1010 ints,con_ 3_ kwh meter&80A mcb&<40m_cab
1020 ints,con_1_ kwh meter&80A mcb&<25m_cab
1030 ints,con_ 1_ kwh meter&80A mcb&<40m_cab
1040 500 v megger test between cores and core
1050 2 kv megger test
1060 earth line loop impedance test per circu
1070 Fit main CB to MSS or LV distrib. board
1080 Fit add main isolat to LV distrib. Board
1090 Install LV distribution board
1100 Install LV DB fuse
1110 Fit additional fuse
1120 Replace LV fuse
1130 Replace LV fuse & carriage
1140 Install LV Pillar Box ( Fibre) & Base
1150 Install LV DB (steel) & plinth
1160 Installation & connection Main CB in DB( wiring Incl)
1170 replace existing low voltage 1f circuit ( wiring Incl)
1180 replace existing low voltage 3f circuit ( wiring Incl)
1190 Reset LV MCB
1200 Repair loose connection
1210 Replace jumpers
1220 Redund. Cable out open trench, remove,
1230 Deco. Red. Bare OHL cond & rmvl & offld
1240 Decom_Redund_Pole_remove_load_tran
1250 Decom. Redund. Dist B/ Pb remove, load, tra
1260 Decom. Redund. MV SWG, remove, load, tra
1270 Decom. Redund. Comp SWG, remove, load, t
1280 Decom. Redund. MSS, remove, load, trans,
1290 Decom. Redund.Trans, remove, load, trans
1300 Decom_Redund_Pole Trans_remove_load_tran
1310 Emergency Call Out
1320 Emergency Call Out - Cancelled
1330 Cleaning veget. & rubble in TSS Servit.
1340 Cleaning of tunnels
1350 First line inspection of load centers
1360 Maintaining Load center Transf ( Incl Oil Change)
1370 Maintaining Load center MV Switchgear
1380 Maintaining Load center LV S/g ( Incl Kitchen cabinet)
1390 Maintaining Load center S/l control panel
1400 prime cost sum for community liaison off
1410 prime cost sum for special materials
1420 Establishment of site camp
1430 Transporting of 8/10.5 fibre glass poles
1440 transport steel/wood 5/7.2/9.2/11.5m st
1450 transport steel double arm curved spig
1460 transport steel 17m straight pole
1470 transport concrete 7 metre, 4 kn pole
1480 transport concrete 7 metre, 10 kn pole
1490 transport concrete 7.5 metre, 20 kn pol
1500 transport concrete 9 metre, 4 kn pole
1510 transport concrete 9 metre, 7 kn pole
1520 transport concrete 9.3 metre, 17.5 kn p
1530 transport concrete 10 metre, 8 kn pole
1540 transport concrete 11m and 7m "h" pole
1550 Install 11.5 D-Curved pole, lmr & Lamp
1560 Install 11.5m Curved pole, lmr & Lamp
1570 Install 9.2m Curved pole, lmr & Lamp
1580 Installation of 17m stl pole, lmr & Lamp
1590 Install 11.5m stl pole, lmr & Lamp
1600 Install 7.2/9.2m stl pole, lmr & Lamp
1610 Install 8/10.5m grp pole, lmr & Lamp
1620 plant concrete 7 metre, 4 kn pole
1630 plant concrete 7,5 metre, 20 kn pole
1640 plant concrete 9 metre, 4 kn pole
1650 plant concrete 9 metre, 7 kn pole
1660 plant concrete 9,3 metre, 17,5 kn pole
1670 plant concrete 10 metre, 8 kn pole
1680 plant concrete 11 & 7 m pole struct
1690 plant 8/10.5 metre grp pole.
1700 install 7.2/9 m stl pole incl. insul.
1710 install 11.5m stl pole incl. insul.
1720 Poles with more than one lintel
1730 Poles with one lintel
1740 Single strain fittings (120/95/50/25)
1750 Double strain fitting for (120/95/50/25)
1760 Single suspension fitting_(120/95/50)
1770 T-off strain fitting for (120/95/50/25)
1780 install abc single strainfit. (120-50)
1790 install abc single suspen fit. (120-50)
1800 install abc double strain fit. (120-50)
1810 install abc t-off strainfit. (120-50)
1820 install IP clamp for tap-off one bolt
1830 install IP clamp for tap-off two bolt
1840 joint abc 120 mm2 x 3 + n + e + s/l
1850 joint abc 95 mm2 x 3 + n/e + s/l
1860 joint abc 70 mm2 x 3 + n/e + s/l
1870 joint abc 50 mm2 x 3 + n/e + s/l
1880 joint abc 25 mm2 x 3 (s/l)
1890 joint abc10 mm2 split concentric LV cab
1900 terminate abc 120 mm2 x 3 + n + e + s/l
1910 terminate abc 95 mm2 x 3 + n/e + s/l
1920 terminate abc 70 mm2 x 3 + n/e + s/l
1930 terminate abc 50 mm2 x 3 + n/e + s/l
1940 terminate abc 25 mm2 x 3 (s/l)
1950 Inspection of LV overhead lines (per circuit)
1960 Inspection of MV overhead lines (per cicuit)
1970 Retentioning of LV conductor ( per circuit)
1980 Retentioning of MV conductor ( per circuit)
1990 Splicing & retention snapped conductor
2000 Bandit strap all cables to pole (1 m intervals)
2010 Dressing a double shackle pole incl. accessories
2020 Install of any outreach bracket
2030 Installation of LV stay assembly
2040 Installation of MV stay assembly
2050 Installation of flying stay assembly
2060 Install fly-stay-Pole incl accessories
2070 Install & fix inter-pole incl. all accs
2080 Install & fix Double Shackle pole incl. accs
2090 Install & fix Terminal-pole incl. accs.
2100 Pole-mounted DB 1&3 phase boxes
2110 Repair earth guards
2120 Replace earth guards
2130 Replace earth mats
2140 Replace MV and LV insulators
2150 Replace & install of X arm incl. insul
2160 Replace surge arrestors
2170 Tree cutting under emergency
2180 Install, Comm street light SDB/SPB on plinth
2190 Install pole-ext- 2,3m (M way)
2200 Installation of lamps only
2210 Cleaning of Luminaire bowls
2220 Install fitting & lamp (Different sizes)
2230 Install stl lmr & 100mm-brack incl Lamp
2240 Remove and replace any size luminaire incl lamp
2250 Install & wire Photocell
2260 Replace photo-electrical cell
2270 Install Streetlight Control circuit in L/C
2280 Remove and install a timer
2290 Remove and install a ripple relay
2300 Replace pole cover only
2310 Straightening of skew poles
2320 Install or replace street light bracket - all sizes
2330 Removal of welded covers
2340 Welding of pole covers
2350 Wire any pole size
2360 Numbering of all poles
2370 Painting of all poles ( Any Length)
2380 Sleeving of poles
2390 install pole earths ,incl. all excav.
2400 Install stainless steel wire rope
2410 Install+C315 trailing cable
2420 Install 4-way term block & photocell
2430 Install a by-pass switch for photo cell
2440 convert exist_ inner door to vandalproof
2450 disconnect and lower mast as specified
2460 disconnect & remove-photo elec. switch
2470 inspection and certification of Masts
2480 inspection and report on suspect/fault
2490 inspection, tests and report on masts
2500 install earth leakage isolator_mast DB
2510 lowering and raining of sectional poles
2520 lowering and raising a luminaries
2530 mech & electrical tests on repairs
2540 painting damaged galvanizing
2550 Lowering and raising a repaired mast
2560 replacing a faulty time switch
2570 removing holding down nuts per mast
2580 removing tack welded holding down nuts per must
2590 replace 1,5mm² x 3 core silicone insul.
2600 replace 16 amp 220 volt switched socket
2610 replace 2,5mm² x 5 core training cable
2620 replace 30 amp triple pole circuit
2630 replace 5 pin male plug top on trailing
2640 replace 5 pin socket outlet in mast
2650 replace 60 amp fusebase, cart and fuse
2660 replace cable separator
2670 replace complete DB inside mast
2680 replace compression glands for above
2690 replace faulty contactor
2700 replace fiberglass hood/canopy
2710 replace luminaries cable splitter box
2720 replace neutral bar on mast DB.
2730 replace only 400 watt lamp
2740 replace pole cover only
2750 replace pulley& hous. 4 steel wire rope ( per mast)
2760 replace pulleys for trailing cable ( per mast)
2770 replace steel wire ropes comp. with accs
2780 reset any size circuit breaker
2790 replace and reset single pole circuit
2800 replace and reset triple pole circuit
2810 replacing and tack welding a new nuts ( per mast)
2820 replacing and tack welding a used nuts ( per mast)
2830 Replace street light bracket - all sizes
2840 Install street lighting luminaries-all sizes
2850 supply and install complete DB
2860 supply and mount stubby as specified
2870 supply new vandal proof inner door
2880 touch up paint (per container)
2890 collection of material from stores
2900 compaction certificate (public roads )
2910 provision of security ( per person per 24 Hrs)
2920 decommissioning of meters
2930 decommissioning of supply
2940 commissioning of supply
2950 Transport material during normal hrs
2960 Transport cable and large equipment
2970 prep of As-built drwgs electronically
2980 preparation of hand over documents
2990 Inspect/remove and replace 5 A 1 phase meter
3000 Inspect/remove & replace polyphase meter
3010 Second visit to check for tampering
3020 Hand prescribed notice for irregularity
3030 Issue Engineer with cert. of completion
3040 Contractor to attend court
3050 Install hasp & staple
3060 Make off an connect 2.5mm2 2 x 19 core pilot cable
3070 Install incl. saddles 2.5mm²/2 x19 core (pilot cable)
3080 Site inspect, reporting and cert of inst of meter
3090 Reprogram electronic meter
3100 Replace old meter with new electronic meter
3110 Provide download from electronic meter
3120 Audit prepaid meters
3130 Remove tamper/bridge meter
3140 Install prepaid meter
3150 Revisit/no access/can't locate
3160 install precast foundations incl prep gr
3170 Complete Refurbish Pillar Box
3180 Pillar Box Repair
3190 Painting of Load Centre
3200 Labeling of Load Centre
3210 Repair & Painting of Substation Building
3220 Security bars over louvers and windows
3230 Repair & Paint_Substation Roof & Ceiling
3240 Install of 2 m high palisade Fencing
3250 Building work
3260 Concrete work
3270 Repair of Perimeter Fencing and walling
3280 Painting Perimeter Fencing and walling
3290 Repair Mss/Tss/Load centre door & hinges
3300 Replace Mss/Tss/Load centre door & hinge
3310 Install 8mm cover plate_ trench in subtn
3320 Install Anti Theft Mss brackets
3330 Install Anti theft cable brackets
3340 Removal of illegal connection
3350 Clean substation & chamber (inside)
3360 Reinstate_pole mounted pillar box doors
3370 LPU site inspection and cert_installation
3380 Install demand meter & commission
3390 Install CT's and VT's
3400 Install and commission a modem
3410 install an external antennae
3420 Standby - Special Events(per occasion) incl Technician, assistant & vehicle
3430 Standby-Attending to no power complaints(per week) incl Technician, assistant & vehicle
3440 Standby - Jointing Team(per week)incl Technician, assistant & vehicle
3450 Standby - Excavation Team (per week) incl Supervisor,5 assistants & vehicle
3460 Supply of 4core x 2.5mm CU PVC SWA PVC 600/1000V
3470 Supply of 4core x 4mm CU PVC SWA PVC 600/1000V
3480 Supply of 12core x 2.5mm CU PVC SWA PVC 600/1000V
3490 Supply of 12core x 4mm CU PVC SWA PVC 600/1000V
3500 Supply of cement
3510 Laying of 4core x 2.5mm CU PVC SWA PVC 600/1000V
3520 Laying of 4core x 4mm CU PVC SWA PVC 600/1000V
3530 Laying of 12core x 2.5mm CU PVC SWA PVC 600/1000V
3540 Laying of 12core x 4mm CU PVC SWA PVC 600/1000V
3550 Pre paid meter Single Phase
3560 Pre paid meter Three Phase
3570 AMR Meter Installation
3580 AMR Meter Modem
3590 Protection Structure
3600 Install Locks
3610 Install a 40mm sleeve
3620 Install a 24SM HDD in f/c sleeve
3630 Installation of 48SM HDD f/c in a sleeve
3640 Fusion splicing per fibre core
3650 Term. of 24 fibre in p/pannel incl. splicing & labelling
3660 Term. of 48 fibre in p/pannel incl. splicing & labelling
3670 Optical testing with light source and power meter per fibre core
3680 OTDR testing including traces in hard and soft copy for 24 fibre cable
3690 OTDR testing including traces in hard and soft copy for 48 fibre cable
3700 Installation of demand meters
3710 Installation of modems
3720 Installation of sim cards
3730 Second visit to customer to install prepaid meter
3740 Stringing of ABC 10mm & 16mm ( AIRDAC)
3750 String. ABC (new) of 16 to 25mm 2/3 core
3760 String ABC (new) of35mm2(4/5 core)
3770 String ABC (new) of 50mm²(4/5 core)
3780 String ABC (new) of 95mm²(4/5 core)
3790 String ABC (new) of 120mm²(4/5 core+SL)
3800 Retentioning of ABC of 35mm²(4 core)
3810 Retentioning of ABC of 50mm²(4 core)
3820 Retentioning of ABC of 35mm²(4 core plus SL)
3830 Retentioning of ABC of 50mm²(4 core plus SL)
3840 Retentioning of ABC of 95mm²(4 core plus SL)
3850 Retentioning of ABC of 120mm²(4 core plus SL)
3860 Removal of ABC 35mm²
3870 Removal of ABC 50mm²
3880 Removal of ABC 95mm²
3890 Removal of ABC 120mm²
3900 Retentioning of Fox per conductor
3910 Retentioning of Mink per conductor
3920 Retentioning of Hare per conductor
3930 Retentioning of Squirrell per conductor
3940 Retentioning of Ferret per conductor
3950 Stringing of Fox per conductor
3960 Stringing of Mink per conductor
3970 Stringing of Hare per conductor
3980 Removal of Fox per line (Not ABC)
3990 Removal of Mink per line (Not ABC)
4000 Removal of Hare per line (Not ABC)
4010 Cable Fault finding (per cable)
4020 Spotting streetlights ( No Repairs incl) Technician & Vehicle per Hour
4030 OPGW outdoor splice enclosure with slack
4040 Support structures @ road cross for 33kv
4050 ABC replace new 16 to 25mm (4/5 core)
4060 ABC replace (new) for 35mm2 (4/5 core)
4070 ABC replace (new) for 50mm2 (4/5 core)
4080 ABC replace (new) for 95mm2 (4/5 core)
4090 ABC replace (new) for 35mm2 (4/5 core + sl)
4100 ABC replace (new) for 50mm2 (4/5 core + sl)
4110 ABC replace (new) for 95mm2 (4/5 core + sl)
4120 ABC replace (new) for 120mm2 (4/5 core + sl)
4130 Fox replacement per conductor
4140 Hare replacement per conductor
4150 Mink replacement per conductor
4160 ABC retentioning for 35mm2 (4 core)
4170 ABC retentioning for 50mm2 (4 core)
4180 ABC retentioning for 35mm2 (4 core+sl)
4190 ABC retentioning for 50mm2 (4 core+sl)
4200 Fox retentioning per conductor
4210 Mink retentioning per conductor
4220 Hare retentioning per conductor
4230 Fox removal per line Not abc
4240 Mink removal per line not abc
4250 Hare removal per line nor abc
4260 ABC removal 35mm2
4270 ABC removal 50mm2
-
Price Unit
R 107.90 m3
R 124.32 m3
R 146.61 m3
R 197.04 m3
R 351.85 m2
R 273.27 m2
R 302.59 m2
R 233.40 m2
R 152.47 m2
R 75.06 m2
R 63.33 m2
R 100.86 m2
R 78.58 m3
R 125.49 m3
R 201.73 Each
R 126.49 Each
R 177.10 hr
R 102.04 m
R 187.65 m
R 72.72 Each
R 192.35 Each
R 152.47 Each
R 56.30 Each
R 62.75 Each
R 511.36 Each
R 246.30 m3
R 1,052.04 m3
R 246.30 m3
R 136.05 m3
R 211.11 m3
R 566.48 Each
R 1,483.64 Each
R 886.67 Each
R 722.47 Each
R 1,006.30 m3
R 483.21 Each
R 527.78 hr
R 1,206.85 Each
R 52.78 m
R 43.40 m
R 32.84 m
R 18.77 m
R 37.53 m
R 25.80 m
R 22.28 m
R 25.80 m
R 2.35 m
R 19.17 m
R 67.67 m
R 29.32 m
R 22.28 Each
R 17.59 Each
R 1,084.88 Each
R 950.00 Each
R 835.06 Each
R 779.94 Each
R 648.58 Each
R 567.65 Each
R 345.99 Each
R 272.10 Each
R 906.61 Each
R 765.86 Each
R 598.15 Each
R 444.51 Each
R 431.61 Each
R 431.61 Each
R 281.48 Each
R 130.19 Each
R 268.58 Each
R 86.79 Each
R 77.41 Each
R 71.54 Each
R 71.54 Each
R 1,230.31 Each
R 272.10 Each
R 174.75 Each
R 270.93 Each
R 1,867.16 Each
R 465.67 Each
R 921.85 Each
R 1,501.24 Each
R 4,056.82 Each
R 543.00 Each
R 743.00 Each
R 589.00 Each
R 287.00 Each
R 212.00 Each
R 253.00 Each
R 107.00 Each
R 83.00 Each
R 149.00 Each
R 128.00 Each
R 150.12 Each
R 329.00 Each
R 176.00 Each
R 278.00 Each
R 191.00 Each
R 167.00 Each
R 458.00 Each
R 625.00 Each
R 310.00 Each
R 485.00 Each
R 103.00 Each
R 120.80 Each
R 161.00 Each
R 172.00 Each
R 389.38 Each
R 335.43 Each
R 613.40 Each
R 523.00 Each
R 413.00 Each
R 120.80 Each
R 120.80 Each
R 471.48 Each
R 402.00 Each
R 274.44 Each
R 151.30 Each
R 129.00 Each
R 84.44 Each
R 64.51 Each
R 181.79 Each
R 155.00 Each
R 22.00 Each
R 327.22 Each
R 1,149.38 Each
R 980.00 Each
R 1,636.00 Each
R 1,167.00 Each
R 2,956.00 Each
R 2,086.00 Each
R 1,734.00 Each
R 514.00 Each
R 352.00 Each
R 28.00 m2
R 58.00 m2
R 141.00 Each
R 319.00 Each
R 25,401.00 Each
R 51,650.00 Each
R 15,000.00 Each
R 139.00 Each
R 132.00 Each
R 173.00 Each
R 154.81 Each
R 155.00 Each
R 206.00 Each
R 192.00 Each
R 178.00 Each
R 187.00 Each
R 205.00 Each
R 216.00 Each
R 365.00 Each
R 367.00 Each
R 349.00 Each
R 341.00 Each
R 760.00 Each
R 434.00 Each
R 315.00 Each
R 509.01 Each
R 369.44 Each
R 221.00 Each
R 232.00 Each
R 212.00 Each
R 213.00 Each
R 214.00 Each
R 427.00 Each
R 266.00 Each
R 284.00 Each
R 288.00 Each
R 333.09 Each
R 173.00 Each
R 87.00 Each
R 96.00 Each
R 102.04 Each
R 92.00 Each
R 99.69 Each
R 86.00 Each
R 94.00 Each
R 100.86 Each
R 289.00 Each
R 73.00 Each
R 65.68 Each
R 65.00 Each
R 56.00 Each
R 57.00 Each
R 219.00 Each
R 186.00 Each
R 153.64 Each
R 156.00 Each
R 131.00 Each
R 87.00 Each
R 282.00 Each
R 221.00 Each
R 173.58 Each
R 191.00 Each
R 148.00 Each
R 10.00 m
R 10.00 m
R 207.00 m
R 49.26 m
R 116.00 m
R 113.00 m
R 159.00 m
R 175.00 m
R 42.00 Each
R 203.00 Each
R 207.00 Each
R 93.00 Each
R 179.00 Each
R 503.15 Each
R 198.00 Each
R 183.00 Each
R 199.00 Each
R 222.00 Each
R 196.00 Each
R 429.00 Each
R 368.27 Each
R 207.00 Each
R 207.00 Each
R 71.54 Each
R 51.60 Each
R 157.16 Each
R 314.00 Each
R 182.96 Each
R 170.06 Each
R 98.52 Each
R 44.00 Each
R 134.00 Each
R 183.00 Each
R 83.27 Each
R 157.16 Each
R 84.00 Each
R 301.00 Each
R 575.00 Each
R 158.33 Each
R 120.00 Each
R 71.00 Each
R 134.00 Each
R 104.00 Each
R 122.00 Each
R 122.00 Each
R 135.00 Each
R 54.00 Each
R 531.00 Each
R 659.00 Each
R 491.00 Each
R 112.00 Each
R 566.48 Each
R 90.00 Each
R 379.00 Each
R 2,270.00 Each
R 231.00 Each
R 736.00 Each
R 483.00 Each
R 398.00 Each
R 247.00 Each
R 660.00 Each
R 1,406.00 Each
R 623.00 Each
R 404.00 Each
R 135.00 Each
R 2,170.00 Each
R 112.00 Each
R 171.00 Each
R 120.80 Each
R 140.00 Each
R 149.00 Each
R 173.00 Each
R 152.47 Each
R 185.00 Each
R 259.00 Each
R 186.00 Each
R 103.00 Each
R 101.00 Each
R 103.00 Each
R 240.00 Each
R 774.00 Each
R 86.79 Each
R 197.04 Each
R 281.00 Each
R 227.00 Each
R 90.00 Each
R 104.00 Each
R 136.00 Each
R 386.00 Each
R 342.00 Each
R 454.00 Each
R 603.00 Each
R 865.56 Each
R 168.00 Each
R 177.00 Each
R 107.00 Each
R 300.25 Each
R 387.04 Each
R 1,046.17 Each
R 119.00 Each
R 107.00 Each
R 115.00 Each
R 89.00 Each
R 92.00 Each
R 81.00 Each
R 1,488.00 Each
R 1,136.00 Each
R 573.00 Each
R 254.51 Each
R 145.00 Each
R 738.00 Each
R 716.00 Each
R 2,500.00 Each
R 502.00 Each
R 256.00 Each
R 330.00 Each
R 892.00 Each
R 1,165.00 Each
R 1,347.00 Each
R 1,466.00 Each
R 112.00 Each
R 320.00 Each
R 152.00 Each
R 89.00 Each
R 1,345.00 Each
R 1,067.00 Each
R 217.00 Each
R 255.00 Each
R 51.00 Each
R 619.00 Each
R 144.00 Each
R 445.00 Each
R 155.00 Each
R 91.00 Each
R 146.00 Each
R 510.00 Each
R 141.00 Each
R 1,512.00 Each
R 921.00 Each
R 826.00 Each
R 808.00 Each
R 584.00 Each
R 406.00 Each
R 378.00 Each
R 139.00 m3
R 784.00 m3
R 1,364.00 Each
R 205.00 m2
R 1,267.00 m
R 327.00 m2
R 435.00 m2
R 1,057.00 m
R 132.00 m
R 354.00 Each
R 835.00 Each
R 418.00 m2
R 204.00 Each
R 263.00 Each
R 921.00 Each
R 623.00 Each
R 1,231.00 Each
R 849.00 Each
R 993.00 Each
R 29.32 Each
R 497.00 Each
R 6,000.00 Each
R 8,000.00 Each
R 6,000.00 Each
R 5,000.00 Each
R 55.00 Each
R 30.00 m
R 20.00 m
R 20.00 m
R 120.00 Each
R 3,360.00 Each
R 6,240.00 Each
R 10.00 Each
R 1,008.00 Each
R 25.00 Each
R 560.00 Each
R 80.00 Each
R 320.00 Each
R 480.00 Each
R 32.00 Each
R 18.00 Each
R 38.00 m
R 25.00 m
R 3.00 m
R 2,250.00 Each
R 5.82 Each
R 248.00 Each
R 149.00 Each
R 427.00 Each
R 40.00 Each
R 128.00 Each
R 121.00 Each
R 858.00 Each
R 1,240.00 Each
R 149.00 Each
R 461.00 Each
R 2,294.00 Each
R 72.00 Each
R 107.00 Each
R 781.00 Each
R 838.78 Each
R 550.00 Each
R 3,802.00 Each
R 2,580.00 Each
R 25.00 m
R 39.38 m
R 56.26 m
R 67.00 m
R 47.26 m
R 67.51 m
R 73.00 m
R 80.00 m
R 7.87 m
R 13.39 m
R 22.76 m
R 2.50 m
R 3.57 m
R 3.25 m
R 4.64 m
R 2.50 m
R 3.57 m
R 5.07 m
R 2.00 m
R 3.40 m
R 5.78 m
R 4.00 m
R 5.71 m
Compatibility Report for Copy of Proforma Generator Ver4 (2).xls
Run on 1/1/2002 0:06

The following features in this workbook are not supported by earlier versions
of Excel. These features may be lost or degraded when you save this workbook
in an earlier file format.

Minor loss of fidelity # of occurrences

Some cells or styles in this workbook contain formatting that is not supported 9
by the selected file format. These formats will be converted to the closest
format available.

You might also like