Scheduling
8-2
Background (Slide 1 of 2)
8-3
Background (Slide 2 of 2)
8-4
Network Scheduling Advantage (Slide 1 of 2)
• Consistent framework
• Shows interdependences
• Shows when resources are needed
• Ensures proper communication
• Determines expected completion date
• Identifies critical activities
8-5
Network Scheduling Advantage (Slide 2 of 2)
8-6
Network Scheduling Techniques:
PERT (ADM) and CPM (PDM)
8-7
Terminology (Slide 1 of 3)
8-8
Terminology (Slide 2 of 3)
8-9
Terminology (Slide 3 of 3)
8-10
Sequential Activities
8-11
AON and AOA Format
8-12
Constructing the Network
8-13
Sample of Network Construction
8-14
Sample of Network Construction
8-15
Gantt (Bar) Charts
8-16
Advantages and Disadvantage
• Advantages
• Easily understood
• Provide a picture of the current state of a project
• Disadvantage
• Difficult to follow complex projects
8-17
Microsoft Project Gantt Chart
8-18
Microsoft Project AON Network
8-19
An Important Aside on Estimating
Activity Times
• It is vital to good project management to be
meticulously honest in estimating the time required
to complete each of the various tasks included in the
project
• No false deadlines
• Evaluate alternative ways of completing work.
8-20
Solving the Network
8-21
The AON Network From The Previous Table
8-22
Calculating Activity Times
• Use three time estimates:
• Optimistic
• Pessimistic
• Most likely
8-23
Calculating Activity Times
TE =
(a + 4m + b )
6
(b − a )
2
=
2
6
= 2
8-24
The Results
8-25
Parkinson’s Law
8-26
Critical Path and Time (Slide 1 of 2)
8-27
Critical Path and Time (Slide 2 of 2)
8-28
Slack (aka, Float)
• LS - ES or LF - EF
8-29
Slack Values
8-30
Precedence Diagramming Restrictions
• Finish to start
• Start to start
• Finish to finish
• Start to finish
8-31
Precedence Diagramming Conventions
8-32
Microsoft Project
8-33
Gantt Chart
8-34
AON Network
8-35
Microsoft Project Calendar
8-36
Uncertainty of Project Completion Time
8-37
Example
Z=
(D − )
=
(50 − 43)
=
7
= 1.22
2
33 5.745
D = + Z = 43 + 5.745(1.645) = 52.45
8-38
Toward Realistic Time Estimates
8-39
Risk Analysis Using Simulation with
Crystal Ball
8-40
Risk Analysis Using Simulation with
Crystal Ball
8-41
Risk Analysis Using Simulation with
Crystal Ball
8-42
Risk Analysis Using Simulation with
Crystal Ball
8-43
Risk Analysis Using Simulation with
Crystal Ball
8-44
Incorporating Costs into the
Simulation Analysis
8-45
Incorporating Costs into the
Simulation Analysis
8-46
Incorporating Costs into the
Simulation Analysis
8-47
Traditional Statistics or Simulation?
8-48
Using These Tools
• Microsoft Project®
• Crystal Ball®
• Excel®
8-49
Copyright
Copyright © 2018 John Wiley & Sons, Inc.
All rights reserved. Reproduction or translation of this work beyond that permitted in
Section 117 of the 1976 United States Act without the express written permission of the
copyright owner is unlawful. Request for further information should be addressed to
the Permissions Department, John Wiley & Sons, Inc. The purchaser may make back-up
copies for his/her own use only and not for distribution or resale. The Publisher
assumes no responsibility for errors, omissions, or damages, caused by the use of these
programs or from the use of the information contained herein.