Design Village Quotation 3 Dec 2024

Shamenek Investments Ltd has provided a detailed quotation for an office renovation project for Petydia Digital Solutions, totaling 326,400.00. The quotation includes costs for demolition, tiling, plumbing, roofing, painting, and other specialized works, with a validity period of 28 days. The project is expected to take 10 working days to complete.

Uploaded by

lucbrouillard381
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views2 pages

Design Village Quotation 3 Dec 2024

Shamenek Investments Ltd has provided a detailed quotation for an office renovation project for Petydia Digital Solutions, totaling 326,400.00. The quotation includes costs for demolition, tiling, plumbing, roofing, painting, and other specialized works, with a validity period of 28 days. The project is expected to take 10 working days to complete.

Uploaded by

lucbrouillard381
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

General Construction and Property Development

Building Renovation Interior works Demolishion Specialised works


Shamenek Investments Ltd
pin: p052174433s

Quotation
As requested, below is the quotation. kindly contact us for more details
Issued to Petydia Digital Solutions Date 12th Dec 2024
Validity period 28 days Draw check to Shamenek investiments ltd
Delivery to Matumbo Hse, kweria road, Nairobi. Terms

Item Particulars Qty Unit Unit cost Amount Sub Total

Quotation for Office renovation


A. Pleriminaries
1. Obtain city county permits 1,500.00
2. Carefully demolish the existing broken tiles and ceiling 7,000.00
3. Carry out the necessary masonry patch work where necessary on the walls and floor 7,000.00
4. Cart away the debri 10,000.00
Sub total 25,500.00

B. Tiles
1. New granito floor tiles for the design studio, the space at the back and the backyard 64 box 2500 160,000.00
2. New Saj floor tiles to replace the broken in middle space 4 box 1600 6,400.00
3. Washroom tiles wall & floor 11 box 110 12,100.00
4. Tile adhesive 67 bags 550 36,850.00
5. Grout 20 kg 100 2,000.00
6. Spacers 13 pkts 100 1,300.00
7. Transport 3,000.00
Sub total for tiles & accessories 221,650.00
Fixing charges 66,500.00
Total for fabrication 288,150.00
C. Deck floor
1. 3” x 2” x 14g ms tubes as primary beams 6 pcs 2800 16,800.00
2. 2” x 2” x 14g ms tubes assecondary beams 10 pcs 2450 24,500.00
3. 2” x2” x3/16” engineered angle line 6050 6,050.00
4. 3mm Engineered checker plate 10,400.00
5. Marine boards 7 pcs 2800 19,600.00
6. Assorted accessories 7,000.00
7. primer undercoat 2,100.00
8. Transport 1,000.00
Sub total for materials 87,450.00
Fabrication charges 30,600.00
Total for branding 118,050.00

D. Mild steel Doors & windows


1. Supply and fix new doors in ms complete with all iron mongregy 3 pcs 15000 45,000.00
2. Re model the existing ms windows to allow for improved aeration 15,000.00
This total 60,000.00

E. Plumbing works
1. Remove the existing kitchen sink and replace with a leaner wash hand basin, replace the
toilet seat in the toilet and replace with a new one, replace the water cistern in the second
toilet, supply and fix a kitchen sink in the proposed kichenette and make good all the
Plumbing fixtures. 45,000.00 45,000.00

F. Roof repair
1. Remove the existing iron sheets & gutter and replace with a new one 35,000.00 35,000.00

G. Gypsum ceiling
1. Supply and fix gypsum ceiling under the new roof (f)above 41 sm 1090 44,690.00 44,690.00

Shamenek Investments Limited


[email protected] cell: +254 799 473308
Item Particulars Qty Unit Unit cost Amount Sub Total
H. Paint works
1. Prepare the ceiling surface to receive paint, apply skim coat to specifications, apply 3 coats
brilliant white vinyl matt.
Prepare the wall surface to receive paint, apply skim coat to specifications, apply 3 coats
soft white vinyl silk on non heavy traffic areas and soft white super gloss on heavy traffic
areas.
on all doors and ms windows apply sky blue super gloss paint and gun metal on deck floor
under side.

Materials
Cover matt 2x20 ltr bkt 4500 9,000.00
Universal u/coat 4x4 ltr Tin 2650 10,600.00
Brilliant white vinyl matt 1x20ltr bkt 13500 13,500.00
Soft white silk 5x4 ltr Tin 2900 14,500.00
Soft white supergloss 5x4ltr Tin 3200 16,000.00
Sky blue supergloss 1x4ltr Tin 3200 3,200.00
Gun metal supergloss 1x4ltr Tin 3200 3,200.00
White spirit 2x5ltr can 1800 3,600.00
Skim coat filla 12 bags 1800 21,600.00
Accessories 5,000.00
Delivery 1,000.00
Sub Total for materials 101,200.00
Labor Charges 72,000.00
Total for paint 173,200.00

I. Front Verandah floor


Remove the existing damaged floor tiles, hack the floor supply all the neccessary materials
and fix a new concrete floor with red oxide finish.
Sand 2 ton 2500 5,000.00
Quarry dust 2 ton 2500 5,000.00
Cement 3 bags 800 2,400.00
Delivery 1,000.00
Sub total for materials 13,400.00
Labor charges 10,000.00
This total 23,400.00

Aluminium works
Carpentry
pagola
carpet,
blinds
ALLOW FOR UNFORESEEN
site clearance and disposal

1. 3” x 2” x 14g ms tubes as primary beams 6 pcs 2800 16,800.00


2. 2” x 2” x 14g ms tubes assecondary beams 10 pcs 2450 24,500.00
3. 2” x2” x3/16” engineered angle line 6050 6,050.00
4. 3mm Engineered checker plate 10,400.00
5. Marine boards 7 pcs 2800 19,600.00
6. Assorted accessories 7,000.00
7. primer undercoat 2,100.00
8. Transport 1,000.00
Sub total for materials 87,450.00
Fabrication charges 30,600.00
Total for branding 118,050.00

C. Delivery
1. Deliver to kalson towers parklands Nairobi 2,500.00

Summary

A+B+C

A. Fabrication 93,500.00
B. branding 135,200.00
C. Delivery 2,500.00

Prepared by :
s.i .l tech team Grand Total 326,400.00
Ps: Duration of work 10 working days
Shamenek Investments Limited
[email protected] cell: +254 799 473308