The Morning Drilling Report for February 21, 2025, details ongoing drilling operations and equipment requirements for multiple rigs operated by Oil and Natural Gas Corporation Ltd. Key activities include the replacement of packer housing, preloading of legs, and drilling operations with specific mud parameters. The report also highlights material requirements, weather conditions, and crew details for each rig.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
1 views
M2102
The Morning Drilling Report for February 21, 2025, details ongoing drilling operations and equipment requirements for multiple rigs operated by Oil and Natural Gas Corporation Ltd. Key activities include the replacement of packer housing, preloading of legs, and drilling operations with specific mud parameters. The report also highlights material requirements, weather conditions, and crew details for each rig.