The Morning Drilling Reports for February 23, 2025, detail various operations across multiple drilling sites, including S/BHUSHAN, S/GAURAV, S/JYOTI, S/KIRAN, and S/RATNA. Key activities include equipment testing, logistics challenges, and drilling progress, with specific notes on material requirements and weather conditions. The reports highlight urgent needs for supplies and equipment, as well as observations on well conditions and crew status.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
7 views
M2302
The Morning Drilling Reports for February 23, 2025, detail various operations across multiple drilling sites, including S/BHUSHAN, S/GAURAV, S/JYOTI, S/KIRAN, and S/RATNA. Key activities include equipment testing, logistics challenges, and drilling progress, with specific notes on material requirements and weather conditions. The reports highlight urgent needs for supplies and equipment, as well as observations on well conditions and crew status.