PDM-Model
PDM-Model
Temporary bunkhouse
(6mx6m)
0 102
0 102
4 4 5 7 7 12 16 16 10 11 11 10
Pipe culvert & drain excavation Structural Concrete for Footing & 100mm CHB Non load bearing/load
slab on Fill (Class A, 28 days) Bearing Painting Works (Wood painting)
(Common soil)
1 6 9 21 67 77 87 97
1 6 9 21 67 77 87 97
2 2 1 6 6 5 5 5 3 9 9 6 8 8 6 20 20 14 19 19 10 17 17 11 18 18 11 12 12 8 11 11 10 13 13 10 21 21 5
Removal of Structure & Reinforcing steel or reinforced Reinforcing Steel or Reinforced Painting Works (Masonry
Project billboard/sign board Structural Steel (column) Structural Steel roof truss Structural Steel Purlins 4.5mm Fiber Cement board on
Pipe culverts concrete Structures for concrete structures for Structural Steel (stage) Prepainted Metal sheets (rib type) painting) Transformer
Obstruction Metal furring
one-storey, Grade 40/ 60 One-storey, Grade 40/ 60
0 1 1 6 21 35 45 56 56 67 87 97
6 9 9 15 15 21 35 45 67 77 77 87 97 102
0 1 1 6 6 9 15 21 21 35 35 45 45 56 56 67 67 77 77 87 87 97 97 102
9 15
10 10 12 16 16 46
9 21 21 67
9 21 21 67
3 3 102
0 102
0 102