Amsa 509 Engineering Survey

The report outlines the National Regulator's preferred method for conducting machinery and engineering surveys for vessels under the Marine Safety National Law. It provides a checklist of survey checks and requirements for various systems, including bilge, fuel, exhaust, and refrigeration systems, ensuring compliance with safety standards. The surveyor must document their findings and declare compliance with the applicable regulations.

Uploaded by

Igor
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views5 pages

Amsa 509 Engineering Survey

The report outlines the National Regulator's preferred method for conducting machinery and engineering surveys for vessels under the Marine Safety National Law. It provides a checklist of survey checks and requirements for various systems, including bilge, fuel, exhaust, and refrigeration systems, ensuring compliance with safety standards. The surveyor must document their findings and declare compliance with the applicable regulations.

Uploaded by

Igor
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

INITIAL MACHINERY & ENGINEERING

SURVEY REPORT
Marine Safety (Domestic Commercial Vessel) National Law Act 2012
Marine Order 503 (Certificates of survey – national law) 2018
National Law – Marine Surveyors Accreditation Guidance Manual 2014

This report is the National Regulator’s preferred method for surveyors to monitor and record the initial construction or alteration –
machinery and engineering survey. It is a minimum set of information expected by the National Regulator, it is not intended to be an
exhaustive list.

Survey Details
Vessel name Unique identifier

Details and serial number of main engine(s) Name of Surveyor

Result - In order (Y) / Not In order (N) / Not Applicable (NA

Bilge System

Surveyor Comments/ drawing /


Item Survey checks Y/N/NA
document reference

Bilge pump number, type and Confirm pump design requirement


capacity
Confirm pump specification is suitable
choose
Verify / inspect pump/s are installed
Retain record of compliance

Bilge system piping Confirm piping design material diameter


and thickness requirement
Confirm pipe material specification is choose
suitable
Verify pipes are installed as per design

Flexible hose installations Determine minimum bend radius and


maximum lengths
Measure installed bend radius and lengths choose
Confirm correct pipe terminations

Bilge system arranged to Confirm back flooding design requirement


prevent back flooding choose
Verify / inspect installation

Bilge suctions arrangement Confirm bilge suction design is arranged


to facilitate drainage of water over a range
of heels choose
Verify / inspect installation

Drive mechanism for pumps Inspect guards are in place and suitable
are guarded choose

Bilge suction strainer Inspect bilge suction pipes are fitted with a
mud box, strum box or strainer choose
(for vessels ≥ 20m)

Bilge Manifold with non- Confirm design requirement


return valves (for vessels ≥
Verify / inspect installation
choose
25m)

AMSA509 (10/24) Page 1 of 5


Inlets & Discharges

Item Survey checks Surveyor Comments/ drawing /


Y/N/NA
document reference

Arrangement and type of inlet Confirm inlet and discharge valve design
and discharge valves or cocks requirement
choose
Verify / inspect installation for correct type
and arrangement

Valves and cocks material Confirm required valve material (bronze,


ductile steel or equivalent specifications)
Verify / inspect valves installed choose
Retain record of compliance

Valves greater than 50mm Verify valves greater than 50mm bore are
bore are flanged type flanged type choose

Stand pipes are at least 1.25 Confirm design requirement


times the required thickness of
Verify / inspect installation
choose
the hull plating

Sea inlet gratings Confirm design requirement for removable


gratings for sea inlets
choose
Verify / inspect gratings are fitted on the
outside of all seawater inlets

Fuel Systems

Item Survey checks Surveyor Comments/ drawing /


Y/N/NA
document reference

Non-portable tank location Verify fuel tanks are located, not over
accesses, hot surfaces, electrical
equipment or ignition surfaces choose
Verify fuel tanks are adequately supported

Additional requirements for Verify tank installation meets additional


fuel with flashpoints less than requirement for low flashpoint fuels (NSCV
choose
60ºC C5A 4.10) e.g. compartment etc

Ventilation Verify tank spaces are adequately


ventilated to open air choose
Verify each tank is fitted with a vent pipe,
remote from tank space vent

Fuel lines Verify fuel lines are of the correct type and
end fittings choose

Fuel system electrical bonding Verify metallic fuel system components are
electrically bonded choose

Remote fuel shut-off Verify fuel shut off valve is correctly


configured
choose
Witness function test of fuel shut off valve

AMSA509 (10/24) Page 2 of 5


Exhaust System

Item Survey checks Surveyor Comments/ drawing /


Y/N/NA
document reference

Exhaust piping Confirm piping specifications is suitable


choose
Verify / inspect installed piping

Exhaust piping and silencers Verify / inspect configuration installed


are water-cooled, shielded or choose
insulated

Exhaust incorporates a riser or Verify / inspect configuration installed


other device to prevent back choose
flooding

Exhaust discharge Verify / inspect discharge is fitted with a


arrangement non-return valve, flap or other permitted choose
arrangement

Monitors, Alarms and Shutdowns

Item Survey checks Surveyor Comments/ drawing /


Y/N/NA
document reference
Engine oil pressure
Vessel is fitted with essential Cooling water outlet
monitoring instrumentation Exhaust temp
Engine gearbox oil pressure choose
Charging rate of generator
Battery meter
Engine RPM
Rudder position indicator

Bilge alarms Confirm vessel is fitted with bilge alarms


(as required) audible at the bridge choose
Verify alarm function in all compartments

Engine alarms Verify vessel fitted with sufficient audible or


visual engine alarms
Engine oil pressure choose
Exhaust water outlet temp
Other:

Remote shutdown of main Confirm design requirement


propulsion engines choose
Verify installation and function

Any fuel transfer system(s) are Confirm design requirement


fitted with a relief valve
Verify installation and function choose
Retain record of compliance

Fuel transfer system(s) Confirm fuel transfer system(s) have


shutdowns shutdowns both inside and outside the
space containing the pump choose
Verify shut down function

AMSA509 (10/24) Page 3 of 5


Identification of Machinery Controls and Equipment
Item Survey checks Surveyor Comments/ drawing /
Y/N/NA
document reference

Bilge Manifold labelling (for Verify marking / labelling is complete and


vessels > 25m) appropriate choose

Identification of piping, valves Verify marking / labelling is complete and


& cocks air pipes, vents & easily identifiable by form, colour, symbol choose
sounding pipes or word

Compressed Air Systems

Item Survey checks Surveyor Comments/ drawing /


Y/N/NA
document reference

Unfired pressure vessels Verify controls applied in design and


design and, construction manufacture and compliant with AS 1210 choose
of Class rules

Air compressor system relief Verify air compressor has suitably sized
valve relief valve fitted and has current test
certificate choose
Retain record of compliance

Compressor air cooler relief Verify air compressor air cooler is fitted
valve or safety diaphragm with a relief valve or safety diaphragm choose

Pressure gauge is fitted Verify a pressure gauge is fitted between


between the air compressor the air compressor after cooler and system choose
after cooler and discharge discharge

Pressure piping used in Verify pressure piping meets the


compressed air systems specifications of AS 4041 choose
Retain record of compliance

Hydraulic Systems

Item Survey checks Surveyor Comments/ drawing /


Y/N/NA
document reference

Hydraulic pumps pressure Verify hydraulic pumps have pressure relief


relief protection fitted on the discharge side choose

Hydraulic fluid specification Verify hydraulic fluid is non-flammable or


has a flashpoint ≥ 157ºC choose

Hydraulic hose specification Verify hydraulic hoses comply with AS


3791 choose
Retain record of compliance

Hydraulic piping specification Verify hydraulic pipes comply with AS 3791


choose
Retain record of compliance

Nylon Hydraulic tubing Verify Nylon hydraulic tubing is only used in


application hand hydraulic systems and is installed choose
within the limitations of the standard

AMSA509 (10/24) Page 4 of 5


Inboard Low Flashpoint Engine Installations
Item Survey checks Surveyor Comments/ drawing /
Y/N/NA
document reference
Additional requirements for
Verify engine installation meets additional
inboard engines operating on
requirement for inboard engines operating
choose
fuel having a flashpoint less
on low flashpoint fuels (NSCV C5A 2.14.3)
than 60ºC

Refrigeration Systems
Item Survey checks Surveyor Comments/ drawing /
Y/N/NA
document reference
Verify refrigeration systems are designed,
Refrigeration system design constructed and tested in accordance with
and construction AS/NZS 16771 & 16772 choose
Retain record of compliance

Refrigeration machinery space Verify spaces containing refrigeration


ventilation machinery are ventilated to the outside air choose

Refrigerated spaces alarm Verify refrigerated spaces are fitted with an


arrangement and test alarm that can only be activated and
cancelled from within the space and that is choose
audible from outside the space
Witness alarm function test

Refrigerated space exit light Verify refrigerated space has means to


and alarm in the event of locate exit and alarm in the event of power
power failure failure choose
Witness exit light and alarm function test in
dead ship scenario

Refrigerated spaces door Verify doors to refrigerated spaces can be


configuration operated from both inside and outside the
space choose
Witness door emergency exit from inside
space function test

Design approval compliance


Item Survey checks Surveyor Comments/ drawing /
Y/N/NA
document reference

In accordance with approved The vessel’s engineering systems are


plans constructed in accordance with the choose
approved plans and design documentation.

Surveyor’s declaration
I declare that:
 I have conducted survey(s) as indicated, of the above mentioned vessel, in accordance with the applicable standards as set out in
Marine Order 503 Certificates of Survey, and that to the extent evident from the inspection/s carried out I am satisfied that the
vessel meets the standards.
 I consent to the Australian Maritime Safety Authority using and disclosing the information provided in this form for purposes
associated with the administration of the Marine Safety (Domestic Commercial Vessel) National Law Act 2012.
 I understand and acknowledge that the Australian Maritime Safety Authority, as the National Regulator, may ask that I provide any
information or document that the National Regulator reasonably considers necessary in relation to this recommendation.
Signature of surveyor Date