The document outlines the revisions to the GAPADENT project's design and build package for the MEP system, detailing changes in costs and specifications between two quotations dated November 2019 and February 2020. Key changes include adjustments in the civil, structure, architecture, and M&E systems, with increased floor areas and additional installations such as a domestic wastewater tank and enhanced electrical systems. The total costs reflect increases in various components, with specific amounts provided in both VND and USD.

Uploaded by

Revit Edifice
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views4 pages

Gapadent Comparison Sheet

The document outlines the revisions to the GAPADENT project's design and build package for the MEP system, detailing changes in costs and specifications between two quotations dated November 2019 and February 2020. Key changes include adjustments in the civil, structure, architecture, and M&E systems, with increased floor areas and additional installations such as a domestic wastewater tank and enhanced electrical systems. The total costs reflect increases in various components, with specific amounts provided in both VND and USD.

Uploaded by

Revit Edifice
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

PROJECT: GAPADENT

LOCATION: HA LAM, THANG BINH, QUANG NAM


Package: Design & Build
Item: MEP system
NOTE FOR CHANGED
1 USD = 23,310
Quotation Revision 2 Quotation Revision 3 INCREASING INCREASING
No. DESCRIPTION
12 November 2019 21 February 2020 (VND) (USD)

CIVIL, STRUCTURE & ARCHITECTURE


A 1,455,520,028 62,442
PHẦN XÂY DỰNG
1 Main production buidling total floor area 2,037 m2 2,573 m2 1,197,555,315 51,375
Update the internal road & storm water
2 drainage system according to the change of the 86,839,087 3,725
main factory building

3 Adding the domestic waste water tank 171,125,625 7,341


-
M&E SYSTEM
B 2,169,089,343 93,054
PHẦN CƠ ĐIỆN
HỆ THỐNG ĐIỆN
I 979,817,445 42,034
ELECTRICAL SYSTEM
Popwer system from substation to DBs Excluded: MSB panel, cable/cable Included: MSB panel, cable/cable
1 659,302,900 28,284
(distribution board) ladeder ladeder

Increasing the total floor area 560m2 -


-
2 Lighting system Increasing the total floor area 560m2 320,514,545 13,750

To used Led panel light insead for


batten light in PP production packing
-
area and GP production inspection
areas.
-
II HỆ THỐNG ĐHKK 456,189,073 19,571
Using the cassette type air
Using the floor standing type air
1 ACMV system conditioning comply with the Client's 456,189,073 19,571
conditioning with ducting
requirement

Increasing the total floor area 560m2 -

Note for changed 1/4


PROJECT: GAPADENT
LOCATION: HA LAM, THANG BINH, QUANG NAM
Package: Design & Build
Item: MEP system
NOTE FOR CHANGED
1 USD = 23,310
Quotation Revision 2 Quotation Revision 3 INCREASING INCREASING
No. DESCRIPTION
12 November 2019 21 February 2020 (VND) (USD)

CIVIL, STRUCTURE & ARCHITECTURE


A 1,455,520,028 62,442
PHẦN XÂY DỰNG
Increasing the quanty of air
-
conditioner
-

HỆ THỐNG CẤP THOÁT NƯỚC


III 413,900,125 17,756
PLUMPING & SANITARY WARES SYSTEM

1 Plumping & sanitary wares system Increasing the total floor area 560m2 413,900,125 17,756

Additional the big toilet at the


production araes => Increasing piping, -
sanitary wares, ...
-

HỆ THỐNG PCCC
IV 319,182,700 13,693
FIRE ALARM & FIRE PROTECTION SYSTEM

1 Fire alarm & fire protection system Increasing the total floor area 560m2 319,182,700 13,693

Note for changed 2/4


REMARK

Equipment belongs to
M&E quotation

Note for changed 3/4