0% found this document useful (0 votes)
3 views

Or apr 18

The document appears to contain a series of mathematical problems and constraints related to linear programming and operations research. It includes various equations, optimization problems, and instructions for solving them, likely intended for an academic or examination setting. Additionally, it mentions the use of the Simplex method and provides a framework for answering questions related to maximizing or minimizing certain objectives under specified constraints.

Uploaded by

anammmm79
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views

Or apr 18

The document appears to contain a series of mathematical problems and constraints related to linear programming and operations research. It includes various equations, optimization problems, and instructions for solving them, likely intended for an academic or examination setting. Additionally, it mentions the use of the Simplex method and provides a framework for answering questions related to maximizing or minimizing certain objectives under specified constraints.

Uploaded by

anammmm79
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

E C 2 9 5 9 1 E 4 F

E B0C 22 D99 B5 9C9 B1 CEE 04 66F 014


EB B0C 22DD99 B59 9C9 B1C CEE 046 66F 014 D85
E 0C 22 99 B5 C9 B1 EE 04 6F 014 D8 BB
EB B0C 22DD99 B59 9C9 B1C CEE 046 66F 014 D85 5BB EB
2 B B 0 0 D 0
B0 0C2 2D9 99B 59C C9B 1CE EE0 466 6F01 14D 85B BBE EB0 C22
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9
0C 2D 99 59 9 1C EE 4 6F 14 8 BB B C 2D 9B
22 9 B C B E 0 66 01 D 5B E 0C 22 9 5
22 D99 9B5 59C9 9B1 1CE E04 466F F014 4D8 85B BEB B0C 22DD99 9B59 9C9
D9 B 9C B CE E0 66 01 D 5B BE 0 22 9 B5 C B1

Q.2
Q.1
2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B 9C 9B C
0 0 9 E
D9 99B 59C C9B 1CE EE0 466 6F01 14D 85B BBE EB0 C22 2D9 9B5 59C 9B1 1CE E04
9B 59C 9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66
99 59 9 1C EE 46 F 14 85 B B C 2D 9B 59 9B 1C E 46 F0
B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 04 6F 14
9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04 66F 01 D8
9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66 01 4D 5B
1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466 F0 4D 85 BE

i)
ii)
EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 F0 14D 85 BB B

iii)
04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F 14 85 BB EB 0C2

N.B:
66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F 01 D8 B EB 0C 2D
F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01 4D 5B BE 0 22 9
14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B
D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14 8 BB EB 0C 2D 99 59

Workers

Anil
5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01 D8 5B EB 0C 22D 99 B5 C9

6.
5.
4.
3.
2.
1.

Sunil
Jainil
BE B0 22 D9 B5 9C B1 CE E0 66 01 4D 5B BE 0C 22 9 B5 9C B1

Swapnil
B0 C2 D9 9B 9C 9B CE E0 466 F01 4D 85B BE B0 22 D9 9B5 9C 9B1 CE
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9 9B 9C 9B CE E0
2D 99B 59 9B 1C EE 46 6F0 14D 85 BB B C2 2D 9B 59C 9B 1C E0 46
99 59 C9 1C EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 6F0
B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 04 6F 14
9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04 66F 01 D8

Attempt any two questions:


Attempt any two questions :
9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66 01 4D 5B
1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466 F0 4D 85 BE
EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 F0 14D 85 BB B

6
3
4
A
m

12
Subject to the constraints,
Subject to the constraints,
04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F 14 85 BB EB 0C2

Maximize 𝑍 = 8𝑥1 + 5𝑥2


Maximize 𝑍 = 3𝑥1 + 7𝑥2
66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F 01 D8 B EB 0C 2D
F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01 4D 5B BE 0 22 9
14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B

c) Answer each question in brief:


D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14 8 BB EB 0C 2D 99 59
5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01 D8 5B EB 0C 22D 99 B5 C9

Subject to the constraints,


BE B0 22 D9 B5 9C B1 CE E0 66 01 4D 5B BE 0C 22 9 B5 9C B1
B0 C2 D9 9B 9C 9B CE E0 466 F01 4D 85B BE B0 22 D9 9B5 9C 9B1 CE
un
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9 9B 9C 9B CE E0
2D 99B 59 9B 1C EE 46 6F0 14D 85 BB B C2 2D 9B 59C 9B 1C E0 46

𝑥1 + 𝑥2 ≤ 8
𝑥1 + 2𝑥2 ≤ 4
99 59 C9 1C EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 6F0

Minimize 𝑍 = 8𝑥1 + 2𝑥2 + 3𝑥3


𝑥1 ≥ 0, 𝑥2 ≥ 0
𝟐
𝟏

B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 04 6F 14

𝑥1 ≥ 0, 𝑥2 ≥ 0

5
9
5
6
B
9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04 66F 01 D8

2𝑥1 + 5𝑥2 ≥ 20
5𝑥1 + 3𝑥2 ≥ 30
2𝑥1 + 5𝑥2 ≤ 20
All questions are compulsory.

9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66 01 4D 5B

Page 1 of 6
1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466 F0 4D 85 BE
ot
EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 F0 14D 85 BB B
04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F 14 85 BB EB 0C2
[Time: 2 Hours]

66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F 01 D8 B EB 0C 2D

Write the Dual for the following Problem.


F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01 4D 5B BE 0 22 9

Jobs
Figures to the right indicate full marks.

14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B
es
D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14 8 BB EB 0C 2D 99 59

4𝑥1 + 2𝑥2 + 𝑥3 ≥ 7
Graph paper will be supplied on Request.

5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01 D8 5B EB 0C 22D 99 B5 C9

𝑥1 + 3𝑥2 + 5𝑥3 ≥ 18
Discuss characteristics of Operations Research.
BE B0 22 D9 B5 9C B1 CE E0 66 01 4D 5B BE 0C 22 9 B5 9C B1

𝑥1 ≥ 0, 𝑥2 ≥ 0, , 𝑥3 ≥ 0
B0 C2 D9 9B 9C 9B CE E0 466 F01 4D 85B BE B0 22 D9 9B5 9C 9B1 CE

3
4
6
4
C
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9 9B 9C 9B CE E0

EB0C22D99B59C9B1CEE0466F014D85BB
2D 99B 59 9B 1C EE 46 6F0 14D 85 BB B C2 2D 9B 59C 9B 1C E0 46
Support answers by diagrams where applicable.

.in
Use of non-programmable calculator is allowed.
Normal distribution table is printed on last page.

99 59 C9 1C EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 6F0


B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 04 6F 14
9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04 66F 01 D8
9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66 01 4D 5B
1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466 F0 4D 85 BE
a) Use Simplex method to solve the following Linear programming problem

EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 F0 14D 85 BB B


04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F 14 85 BB EB 0C2

Explain “Redundant Constraint” in Graphical Method of LPP.


66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F 01 D8 B EB 0C 2D
Please check whether you have got the right question paper.

F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01 4D 5B BE 0 22 9

2
3
5
2
14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B

D
D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14 8 BB EB 0C 2D 99 59
b) Use Graphical method to solve the following Linear programming problem

5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01 D8 5B EB 0C 22D 99 B5 C9


Q.P. Code :31261

BE B0 22 D9 B5 9C B1 CE E0 66 01 4D 5B BE 0C 22 9 B5 9C B1
B0 C2 D9 9B 9C 9B CE E0 466 F01 4D 85B BE B0 22 D9 9B5 9C 9B1 CE
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9 9B 9C 9B CE
2D 99B 59 9B 1C EE 46 6F0 14D 85 BB B C2 2D 9B 59C 9B 1C E
99 59 C9 1C EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE
B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 0
9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04
9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 6
1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466
EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46

given in Rs. Thousands. Find optimal assignment of job and worker to minimize total cost.
04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F
66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F
F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01
14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0

a) Four jobs are to be assigned to four workers on one to one basis. Cost of each assignment is 7.5
2.5
2.5
2.5
7.5
7.5

D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14
[ Marks:75]

5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01
BE B0 22 D9 B5 9C B1 CE E0 66 01 4D
B0 C2 D9 9B 9C 9B CE E0 466 F01 4D
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85
2D 99B 59 9B 1C EE 46 6F0 14D 85
99 59 C9 1C EE 046 6F 14 85 B
B5 C B1 E 04 6F 01 D8 B
9 E 4 B
E C 2 9 5 9 1 E 4 F
E B0C 22 D99 B5 9C9 B1 CEE 04 66F 014
EB B0C 22DD99 B59 9C9 B1C CEE 046 66F 014 D85
E 0C 22 99 B5 C9 B1 EE 04 6F 014 D8 BB
EB B0C 22DD99 B59 9C9 B1C CEE 046 66F 014 D85 5BB EB
2 B B 0 0 D 0
B0 0C2 2D9 99B 59C C9B 1CE EE0 466 6F01 14D 85B BBE EB0 C22
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9
0C 2D 99 59 9 1C EE 4 6F 14 8 BB B C 2D 9B
22 9 B C B E 0 66 01 D 5B E 0C 22 9 5
22 D99 9B5 59C9 9B1 1CE E04 466F F014 4D8 85B BEB B0C 22DD99 9B59 9C9
D9 B 9C B CE E0 66 01 D 5B BE 0 22 9 B5 C B1

Q.3
2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B 9C 9B C
0 0 9 E
D9 99B 59C C9B 1CE EE0 466 6F01 14D 85B BBE EB0 C22 2D9 9B5 59C 9B1 1CE E04
9B 59C 9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66
99 59 9 1C EE 46 F 14 85 B B C 2D 9B 59 9B 1C E 46 F0
B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 04 6F 14
9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04 66F 01 D8
9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66 01 4D 5B
1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466 F0 4D 85 BE

i)

ii)
EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 F0 14D 85 BB B

iii)
04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F 14 85 BB EB 0C2
66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F 01 D8 B EB 0C 2D

c) There
F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01 4D 5B BE 0 22 9
14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B
D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14 8 BB EB 0C 2D 99 59

Unit
Vinit
Amit

Punit

C
B
A
Sumit

are

Factories
5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01 D8 5B EB 0C 22D 99 B5 C9 Workers
BE B0 22 D9 B5 9C B1 CE E0 66 01 4D 5B BE 0C 22 9 B5 9C B1

Unit
B0 C2 D9 9B 9C 9B CE E0 466 F01 4D 85B BE B0 22 D9 9B5 9C 9B1 CE

Demand
Markets
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9 9B 9C 9B CE E0

F
E
Profit in Rs. Per

C
B

D
A
2D 99B 59 9B 1C EE 46 6F0 14D 85 BB B C2 2D 9B 59C 9B 1C E0 46

Solution.
99 59 C9 1C EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 6F0

Activity
B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 04 6F 14
9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04 66F 01 D8

Attempt any two questions:


9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66 01 4D 5B
1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466 F0 4D 85 BE
EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 F0 14D 85 BB B
m
04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F 14 85 BB EB 0C2

40
35
4
66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F 01 D8 B EB 0C 2D
35
40
25
30

75
F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01 4D 5B BE 0 22 9
Pencil

14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B
D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14 8 BB EB 0C 2D 99 59
5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01 D8 5B EB 0C 22D 99 B5 C9

Transportation solution.
6
BE B0 22 D9 B5 9C B1 CE E0 66 01 4D 5B BE 0C 22 9 B5 9C B1

12
5
B0 C2 D9 9B 9C 9B CE E0 466 F01 4D 85B BE B0 22 D9 9B5 9C 9B1 CE
un
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9 9B 9C 9B CE E0
2D 99B 59 9B 1C EE 46 6F0 14D 85 BB B C2 2D 9B 59C 9B 1C E0 46
99 59 C9 1C EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 6F0
B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 04 6F 14
9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04 66F 01 D8

C
B
A
A
9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66 01 4D 5B

D,E
2

Page 2 of 6
1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466 F0 4D 85 BE

25
45
90
70
40

Y
ot

85
EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 F0 14D 85 BB B

110

a) A small project consists of following activities:


Rubber

04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F 14 85 BB EB 0C2


66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F 01 D8 B EB 0C 2D
F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01 4D 5B BE 0 22 9

2
3
14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B

Preceding Activity
es

7
D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14 8 BB EB 0C 2D 99 59

(Cost in Rs.)
5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01 D8 5B EB 0C 22D 99 B5 C9
BE B0 22 D9 B5 9C B1 CE E0 66 01 4D 5B BE 0C 22 9 B5 9C B1
B0 C2 D9 9B 9C 9B CE E0 466 F01 4D 85B BE B0 22 D9 9B5 9C 9B1 CE
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9 9B 9C 9B CE E0

EB0C22D99B59C9B1CEE0466F014D85BB
2D 99B 59 9B 1C EE 46 6F0 14D 85 BB B C2 2D 9B 59C 9B 1C E0 46
.in
99 59 C9 1C EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 6F0
Quantity of Products in Units

B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 04 6F 14
1

40
Pen

120
130
140
100

9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04 66F 01 D8

40
9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66 01 4D 5B
1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466 F0 4D 85 BE
EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 F0 14D 85 BB B

8
5

Find one more optimal alternate Transportation solution .


04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F 14 85 BB EB 0C2
66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F 01 D8 B EB 0C 2D

8
7
9
7
6

12
F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01 4D 5B BE 0 22 9
14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B
circle indicates number of units transported from Factories to Markets.)

D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14 8 BB EB 0C 2D 99 59
5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01 D8 5B EB 0C 22D 99 B5 C9
the optimal assignment of workers to product which will maximize the profit.

Time (days)
Q.P. Code :31261

BE B0 22 D9 B5 9C B1 CE E0 66 01 4D 5B BE 0C 22 9 B5 9C B1
B0 C2 D9 9B 9C 9B CE E0 466 F01 4D 85B BE B0 22 D9 9B5 9C 9B1 CE
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9 9B 9C 9B CE
3
40
60
30
50

85
80
60
Ink

2D 99B 59 9B 1C EE 46 6F0 14D 85 BB B C2 2D 9B 59C 9B 1C E


225

Test the given solution for optimality and find optimal Transportation
99 59 C9 1C EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE
Supply

Comment upon the managerial significance of alternate/ multiple optimal


B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 0
9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04
and Demand of units with unit cost of Transportation (in Rs.) and the schedule

9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 6
60, 80 and 85 units. Demand at the market places is 75, 110 and 40 units. The supply

1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466


followed from Factories to Markets are given below: (The numbers which are shown in

EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46
04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F
3 Factories A, B, C and three Markets X, Y and Z. Supply at the Factories is
the following matrix along with the profit in Rs. Per unit. Formulate a Profit Matrix and find

66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F
F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01
14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0

01
03

3.5
b) The quantity of different products (in units) produced by the workers per day are given in 7.5

D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14
5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01
BE B0 22 D9 B5 9C B1 CE E0 66 01 4D
B0 C2 D9 9B 9C 9B CE E0 466 F01 4D
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85
2D 99B 59 9B 1C EE 46 6F0 14D 85
99 59 C9 1C EE 046 6F 14 85 B
B5 C B1 E 04 6F 01 D8 B
9 E 4 B
E C 2 9 5 9 1 E 4 F
E B0C 22 D99 B5 9C9 B1 CEE 04 66F 014
EB B0C 22DD99 B59 9C9 B1C CEE 046 66F 014 D85
E 0C 22 99 B5 C9 B1 EE 04 6F 014 D8 BB
EB B0C 22DD99 B59 9C9 B1C CEE 046 66F 014 D85 5BB EB
2 B B 0 0 D 0
B0 0C2 2D9 99B 59C C9B 1CE EE0 466 6F01 14D 85B BBE EB0 C22
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9
0C 2D 99 59 9 1C EE 4 6F 14 8 BB B C 2D 9B
22 9 B C B E 0 66 01 D 5B E 0C 22 9 5
22 D99 9B5 59C9 9B1 1CE E04 466F F014 4D8 85B BEB B0C 22DD99 9B59 9C9
D9 B 9C B CE E0 66 01 D 5B BE 0 22 9 B5 C B1

Q.4
2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B 9C 9B C
0 0 9 E
D9 99B 59C C9B 1CE EE0 466 6F01 14D 85B BBE EB0 C22 2D9 9B5 59C 9B1 1CE E04
9B 59C 9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66
99 59 9 1C EE 46 F 14 85 B B C 2D 9B 59 9B 1C E 46 F0
B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 04 6F 14
9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04 66F 01 D8
9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66 01 4D 5B
1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466 F0 4D 85 BE

i)
i)
i)

ii)
ii)
ii)
EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 F0 14D 85 BB B

iv)

iii)
iii)
iii)
04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F 14 85 BB EB 0C2
66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F 01 D8 B EB 0C 2D
F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01 4D 5B BE 0 22 9
14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B
D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14 8 BB EB 0C 2D 99 59
5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01 D8 5B EB 0C 22D 99 B5 C9

action.
BE B0 22 D9 B5 9C B1 CE E0 66 01 4D 5B BE 0C 22 9 B5 9C B1

i-j
time.

6-7
5-6
4-6
3-5
2-4
2-3
1-3
1-2
B0 C2 D9 9B 9C 9B CE E0 466 F01 4D 85B BE B0 22 D9 9B5 9C 9B1 CE

Probability
Events

Sales (units)
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9 9B 9C 9B CE E0
2D 99B 59 9B 1C EE 46 6F0 14D 85 BB B C2 2D 9B 59C 9B 1C E0 46
99 59 C9 1C EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 6F0
B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 04 6F 14
9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04 66F 01 D8

Attempt any two questions.


9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66 01 4D 5B
1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466 F0 4D 85 BE
and the variance values.
EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 F0 14D 85 BB B
m

shown in the table below:


04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F 14 85 BB EB 0C2
66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F 01 D8 B EB 0C 2D

25
0.2
F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01 4D 5B BE 0 22 9
14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B

Rs.10/- and sells for Rs.15/-


c) Answer each question in brief:
D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14 8 BB EB 0C 2D 99 59
5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01 D8 5B EB 0C 22D 99 B5 C9
BE B0 22 D9 B5 9C B1 CE E0 66 01 4D 5B BE 0C 22 9 B5 9C B1

2
4
2
3
6
4
6
B0 C2 D9 9B 9C 9B CE E0 466 F01 4D 85B BE B0 22 D9 9B5 9C 9B1 CE 5
un
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9 9B 9C 9B CE E0
Finish Time for each activity.

in weeks

2D 99B 59 9B 1C EE 46 6F0 14D 85 BB B C2 2D 9B 59C 9B 1C E0 46


99 59 C9 1C EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 6F0
B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 04 6F 14
9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04 66F 01 D8
Expected Time (te)

9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66 01 4D 5B

Page 3 of 6
26
1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466 F0 4D 85 BE

0.4
ot
EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 F0 14D 85 BB B
04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F 14 85 BB EB 0C2

Discuss the concept of Dummy Activity.


66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F 01 D8 B EB 0C 2D

i) Construct the conditional Pay-off (profit) table.


F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01 4D 5B BE 0 22 9
14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B

What are the objectives of project crashing?


break even situation – no loss and no profit)
es
D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14 8 BB EB 0C 2D 99 59
5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01 D8 5B EB 0C 22D 99 B5 C9
BE B0 22 D9 B5 9C B1 CE E0 66 01 4D 5B BE 0C 22 9 B5 9C B1 1
1

B0 C2 D9 9B 9C 9B CE E0 466 F01 4D 85B BE B0 22 D9 9B5 9C 9B1 CE


1/3
1/3
4/3
4/3
1/3
1/3

C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9 9B 9C 9B CE E0
Construct the network diagram of PERT network.

EB0C22D99B59C9B1CEE0466F014D85BB
2D 99B 59 9B 1C EE 46 6F0 14D 85 BB B C2 2D 9B 59C 9B 1C E0 46
.in
99 59 C9 1C EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 6F0

27
B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 04 6F 14

0.3
Find project completion time for 95% confidence level.
9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04 66F 01 D8
Standard Deviation

Discuss the difference between an Activity and an Event.


9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66 01 4D 5B
1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466 F0 4D 85 BE

iii) Calculate the Expected Value with Perfect Information. (EVPI)


EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 F0 14D 85 BB B
04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F 14 85 BB EB 0C2
Calculate Tail Slack and Head Slack for non critical activities.

66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F 01 D8 B EB 0C 2D
F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01 4D 5B BE 0 22 9
14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B
D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14 8 BB EB 0C 2D 99 59
5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01 D8 5B EB 0C 22D 99 B5 C9
Q.P. Code :31261

BE B0 22 D9 B5 9C B1 CE E0 66 01 4D 5B BE 0C 22 9 B5 9C B1
1
1

B0 C2 D9 9B 9C 9B CE E0 466 F01 4D 85B BE B0 22 D9 9B5 9C 9B1 CE


1/9
1/9
1/9
1/9

28
0.1
16/9
16/9

C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9 9B 9C 9B CE
2D 99B 59 9B 1C EE 46 6F0 14D 85 BB B C2 2D 9B 59C 9B 1C E
Variance

Identify Critical Path and find the expected completion time of the project.

99 59 C9 1C EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE
B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 0

What is the optimal number of cakes that should be bought each day? A cake costs
ii) Calculate Expected Pay-off (profit) using EMV method and suggest best course of
9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04

cakes. Left over cakes are therefore, a complete loss. On the other hand, if a customer
Calculate Earliest Start Time, Earliest Finish Time, Latest start time and Latest

9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 6
Construct the network diagram and find out critical path and project completion

buy order to meet the day’s demand. The departmental store prefers not to sell day-old-
1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466

a) A department store with a bakery section is faced with the problem of how many cakes to
of completion of the project. (for the purpose of bidding, consider only cost that is

EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46
following calculations of Average Expected Times from Optimistic time, most likely time

per week. Find the amount the firm should bid under the policy of 95% confidence

The store has therefore, collected information on the past sales based on 100 day period as
and pessimistic time for various activities of a project as well respected standard Deviation

04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F

desires cake but all of them have been sold, he will buy elsewhere and the sales will be lost.
b) The data for a PERT network is given in the following table. The project manager has made

If the fixed cost of the project is Rs.30, 00,000/- and the variable cost is Rs.20, 000/-

66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F
F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01
14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0

02
03
02
02
01
01
04

2.5
2.5
2.5
2.5
2.5
2.5

D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14
5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01
BE B0 22 D9 B5 9C B1 CE E0 66 01 4D
B0 C2 D9 9B 9C 9B CE E0 466 F01 4D
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85
2D 99B 59 9B 1C EE 46 6F0 14D 85
99 59 C9 1C EE 046 6F 14 85 B
B5 C B1 E 04 6F 01 D8 B
9 E 4 B
E C 2 9 5 9 1 E 4 F
E B0C 22 D99 B5 9C9 B1 CEE 04 66F 014
EB B0C 22DD99 B59 9C9 B1C CEE 046 66F 014 D85
E 0C 22 99 B5 C9 B1 EE 04 6F 014 D8 BB
EB B0C 22DD99 B59 9C9 B1C CEE 046 66F 014 D85 5BB EB
2 B B 0 0 D 0
B0 0C2 2D9 99B 59C C9B 1CE EE0 466 6F01 14D 85B BBE EB0 C22
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9
0C 2D 99 59 9 1C EE 4 6F 14 8 BB B C 2D 9B
22 9 B C B E 0 66 01 D 5B E 0C 22 9 5
22 D99 9B5 59C9 9B1 1CE E04 466F F014 4D8 85B BEB B0C 22DD99 9B59 9C9
D9 B 9C B CE E0 66 01 D 5B BE 0 22 9 B5 C B1

Q.5
2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B 9C 9B C
0 0 9 E
D9 99B 59C C9B 1CE EE0 466 6F01 14D 85B BBE EB0 C22 2D9 9B5 59C 9B1 1CE E04
9B 59C 9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66
99 59 9 1C EE 46 F 14 85 B B C 2D 9B 59 9B 1C E 46 F0
B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 04 6F 14
9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04 66F 01 D8
9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66 01 4D 5B
1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466 F0 4D 85 BE

C
B
A
WH
EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 F0 14D 85 BB B
04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F 14 85 BB EB 0C2

Demand
66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F 01 D8 B EB 0C 2D
F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01 4D 5B BE 0 22 9
14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B

time.
D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14 8 BB EB 0C 2D 99 59

i)

Markets
ii)
5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01 D8 5B EB 0C 22D 99 B5 C9

iii)
BE B0 22 D9 B5 9C B1 CE E0 66 01 4D 5B BE 0C 22 9 B5 9C B1
B0 C2 D9 9B 9C 9B CE E0 466 F01 4D 85B BE B0 22 D9 9B5 9C 9B1 CE

F
E
C
B

G
D
A
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9 9B 9C 9B CE E0

8
2D 99B 59 9B 1C EE 46 6F0 14D 85 BB B C2 2D 9B 59C 9B 1C E0 46
Products

Player A
Game as follows:
99 59 C9 1C EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 6F0

8
P
B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 04 6F 14
9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04 66F 01 D8
9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66 01 4D 5B
and 2 in the order 1 -2

1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466 F0 4D 85 BE

1
11

7
EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 F0 14D 85 BB B

11
19
m
04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F 14 85 BB EB 0C2

A4
A3
A2
A1
66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F 01 D8 B EB 0C 2D
F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01 4D 5B BE 0 22 9
14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B
D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14 8 BB EB 0C 2D 99 59

1
5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01 D8 5B EB 0C 22D 99 B5 C9

8
BE B0 22 D9 B5 9C B1 CE E0 66 01 4D 5B BE 0C 22 9 B5 9C B1

9
Q
B0 C2 D9 9B 9C 9B CE E0 466 F01 4D 85B BE B0 22 D9 9B5 9C 9B1 CE
un
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9 9B 9C 9B CE E0

7
8

-9
13
2D 99B 59 9B 1C EE 46 6F0 14D 85 BB B C2 2D 9B 59C 9B 1C E0 46

B1
60
75
20
15
40
25

100

99 59 C9 1C EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 6F0


B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 04 6F 14

12

9
17
iv) Calculate the idle time for machine 2.
iii) Calculate the idle time for machine 1.

Find the Minimax strategy


Find the Maximin strategy
Machine 1

9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04 66F 01 D8
9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66 01 4D 5B
Time in Hrs on

Page 4 of 6
1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466 F0 4D 85 BE
ot
EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 F0 14D 85 BB B

What is the Value of the game?


04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F 14 85 BB EB 0C2
66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F 01 D8 B EB 0C 2D

-5
-5

6
14
B2
F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01 4D 5B BE 0 22 9

6
R
14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B
es
D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14 8 BB EB 0C 2D 99 59
5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01 D8 5B EB 0C 22D 99 B5 C9
BE B0 22 D9 B5 9C B1 CE E0 66 01 4D 5B BE 0C 22 9 B5 9C B1

and 13 units. Demand at the market places is 8, 9, 6 and 7 units


B0 C2 D9 9B 9C 9B CE E0 466 F01 4D 85B BE B0 22 D9 9B5 9C 9B1 CE

11
5
18
ii) Find the total Elapsed time for the optimum sequence.

C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9 9B 9C 9B CE E0

EB0C22D99B59C9B1CEE0466F014D85BB
Player B
2D 99B 59 9B 1C EE 46 6F0 14D 85 BB B C2 2D 9B 59C 9B 1C E0 46
.in

0
0
-2
99 59 C9 1C EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 6F0 -4
B3
B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 04 6F 14
9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04 66F 01 D8
9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66 01 4D 5B

4
1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466 F0 4D 85 BE
2

7
3
45
40
35
30
45
25
15

EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 F0 14D 85 BB B


04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F 14 85 BB EB 0C2
66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F 01 D8 B EB 0C 2D
F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01 4D 5B BE 0 22 9
5

-2
-8

2
14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B
B4
-12

17

12
9
D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14 8 BB EB 0C 2D 99 59
5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01 D8 5B EB 0C 22D 99 B5 C9
Time in Hrs on Machine
Q.P. Code :31261

BE B0 22 D9 B5 9C B1 CE E0 66 01 4D 5B BE 0C 22 9 B5 9C B1
B0 C2 D9 9B 9C 9B CE E0 466 F01 4D 85B BE B0 22 D9 9B5 9C 9B1 CE
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9 9B 9C 9B CE
2D 99B 59 9B 1C EE 46 6F0 14D 85 BB B C2 2D 9B 59C 9B 1C E
99 59 C9 1C EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE

9
8
B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 0

13
b) There are 7 different products in a machine shop. Their manufacturing time in Hrs on

9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04

Supply
9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 6
i) Find the optimal sequence of products manufacturing that minimizes the total elapsed

1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466


c) You are given the Pay-off (profit in Rs.) matrix in respect of a Two – Person Zero – Sum
machines 1 and 2 are given below. Each of the products must go through two machines 1

EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46
There are 3 warehouses A,B, C and four market places P, Q, R, S Supply at the warehouses is 8,9

04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F


The following table shows the unit cost data of transportation and a feasible solution to the problem
66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F
F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01
14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0
01
01
02

2.5
2.5
2.5
3.5

D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14
5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01
BE B0 22 D9 B5 9C B1 CE E0 66 01 4D
B0 C2 D9 9B 9C 9B CE E0 466 F01 4D
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85
2D 99B 59 9B 1C EE 46 6F0 14D 85
99 59 C9 1C EE 046 6F 14 85 B
B5 C B1 E 04 6F 01 D8 B
9 E 4 B
E C 2 9 5 9 1 E 4 F
E B0C 22 D99 B5 9C9 B1 CEE 04 66F 014
EB B0C 22DD99 B59 9C9 B1C CEE 046 66F 014 D85
E 0C 22 99 B5 C9 B1 EE 04 6F 014 D8 BB
EB B0C 22DD99 B59 9C9 B1C CEE 046 66F 014 D85 5BB EB
2 B B 0 0 D 0
B0 0C2 2D9 99B 59C C9B 1CE EE0 466 6F01 14D 85B BBE EB0 C22
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9
0C 2D 99 59 9 1C EE 4 6F 14 8 BB B C 2D 9B
22 9 B C B E 0 66 01 D 5B E 0C 22 9 5
22 D99 9B5 59C9 9B1 1CE E04 466F F014 4D8 85B BEB B0C 22DD99 9B59 9C9
D9 B 9C B CE E0 66 01 D 5B BE 0 22 9 B5 C B1
2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B 9C 9B C
0 0 9 E
D9 99B 59C C9B 1CE EE0 466 6F01 14D 85B BBE EB0 C22 2D9 9B5 59C 9B1 1CE E04
9B 59C 9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66
99 59 9 1C EE 46 F 14 85 B B C 2D 9B 59 9B 1C E 46 F0
B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 04 6F 14
i)

v)
9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04 66F 01 D8

ii)

vi)
iv)

vii)
iii)
9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66 01 4D 5B
1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466 F0 4D 85 BE
EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 F0 14D 85 BB B
04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F 14 85 BB EB 0C2
66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F 01 D8 B EB 0C 2D
F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01 4D 5B BE 0 22 9
14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B
D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14 8 BB EB 0C 2D 99 59
5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01 D8 5B EB 0C 22D 99 B5 C9
BE B0 22 D9 B5 9C B1 CE E0 66 01 4D 5B BE 0C 22 9 B5 9C B1
B0 C2 D9 9B 9C 9B CE E0 466 F01 4D 85B BE B0 22 D9 9B5 9C 9B1 CE
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9 9B 9C 9B CE E0
2D 99B 59 9B 1C EE 46 6F0 14D 85 BB B C2 2D 9B 59C 9B 1C E0 46
99 59 C9 1C EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 6F0
B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 04 6F 14
9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04 66F 01 D8
9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66 01 4D 5B
1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466 F0 4D 85 BE
EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 F0 14D 85 BB B
m
04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F 14 85 BB EB 0C2
66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F 01 D8 B EB 0C 2D
F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01 4D 5B BE 0 22 9
transportations solution?
14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B
D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14 8 BB EB 0C 2D 99 59
5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01 D8 5B EB 0C 22D 99 B5 C9
BE B0 22 D9 B5 9C B1 CE E0 66 01 4D 5B BE 0C 22 9 B5 9C B1
B0 C2 D9 9B 9C 9B CE E0 466 F01 4D 85B BE B0 22 D9 9B5 9C 9B1 CE
un
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9 9B 9C 9B CE E0 that multiple solutions are possible?
2D 99B 59 9B 1C EE 46 6F0 14D 85 BB B C2 2D 9B 59C 9B 1C E0 46
99 59 C9 1C EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 6F0
B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 04 6F 14
place, which one should be selected?
Test the given solution for optimality.

9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04 66F 01 D8
calculate optimal cost of transportation.

9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66 01 4D 5B

Page 5 of 6
1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466 F0 4D 85 BE
ot
EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 F0 14D 85 BB B
04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F 14 85 BB EB 0C2
66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F 01 D8 B EB 0C 2D
F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01 4D 5B BE 0 22 9
14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B
es
D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14 8 BB EB 0C 2D 99 59
5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01 D8 5B EB 0C 22D 99 B5 C9
BE B0 22 D9 B5 9C B1 CE E0 66 01 4D 5B BE 0C 22 9 B5 9C B1
B0 C2 D9 9B 9C 9B CE E0 466 F01 4D 85B BE B0 22 D9 9B5 9C 9B1 CE
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9 9B 9C 9B CE E0

EB0C22D99B59C9B1CEE0466F014D85BB
2D 99B 59 9B 1C EE 46 6F0 14D 85 BB B C2 2D 9B 59C 9B 1C E0 46
.in
99 59 C9 1C EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 6F0
B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 04 6F 14
9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04 66F 01 D8
9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66 01 4D 5B
From the obtained Optimal Table, answer the following Questions.

1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466 F0 4D 85 BE


EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 F0 14D 85 BB B
04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F 14 85 BB EB 0C2
66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F 01 D8 B EB 0C 2D
If 3 units are transported from B to P, how will the cost be affected?

F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01 4D 5B BE 0 22 9
transportation business is given to him. Should the offer be accepted?

14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B
D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14 8 BB EB 0C 2D 99 59
5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01 D8 5B EB 0C 22D 99 B5 C9
Q.P. Code :31261

BE B0 22 D9 B5 9C B1 CE E0 66 01 4D 5B BE 0C 22 9 B5 9C B1
B0 C2 D9 9B 9C 9B CE E0 466 F01 4D 85B BE B0 22 D9 9B5 9C 9B1 CE
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9 9B 9C 9B CE
2D 99B 59 9B 1C EE 46 6F0 14D 85 BB B C2 2D 9B 59C 9B 1C E
99 59 C9 1C EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE
B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 0
9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04
If the given solution is not optimal, find optimal solution using MODI method and

9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 6
If the transport cost from C to R decreases from Rs. 11 to Rs.4, what will happen to
If the transporter from A to R is prepared to reduce the cost by 20% even if one unit

1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466


What should be the decrease in the cost of cell A-R so that it can be used alternatively so

EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46
04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F
If the management wants to embark on an advertisement campaign in one of the market

66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F
F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01
14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0
02
02
02
02
01
03
03

D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14
5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01
BE B0 22 D9 B5 9C B1 CE E0 66 01 4D
B0 C2 D9 9B 9C 9B CE E0 466 F01 4D
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85
2D 99B 59 9B 1C EE 46 6F0 14D 85
99 59 C9 1C EE 046 6F 14 85 B
B5 C B1 E 04 6F 01 D8 B
9 E 4 B
E C 2 9 5 9 1 E 4 F
E B0C 22 D99 B5 9C9 B1 CEE 04 66F 014
EB B0C 22DD99 B59 9C9 B1C CEE 046 66F 014 D85
E 0C 22 99 B5 C9 B1 EE 04 6F 014 D8 BB
EB B0C 22DD99 B59 9C9 B1C CEE 046 66F 014 D85 5BB EB
2 B B 0 0 D 0
B0 0C2 2D9 99B 59C C9B 1CE EE0 466 6F01 14D 85B BBE EB0 C22
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9
0C 2D 99 59 9 1C EE 4 6F 14 8 BB B C 2D 9B
22 9 B C B E 0 66 01 D 5B E 0C 22 9 5
22 D99 9B5 59C9 9B1 1CE E04 466F F014 4D8 85B BEB B0C 22DD99 9B59 9C9
D9 B 9C B CE E0 66 01 D 5B BE 0 22 9 B5 C B1
2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B 9C 9B C
0 0 9 E
D9 99B 59C C9B 1CE EE0 466 6F01 14D 85B BBE EB0 C22 2D9 9B5 59C 9B1 1CE E04
9B 59C 9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66
99 59 9 1C EE 46 F 14 85 B B C 2D 9B 59 9B 1C E 46 F0

I
B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 04 6F 14

3.0
2.9
2.8
2.7
2.6
2.5
2.4
2.3
2.2
2.1
2.0
1.9
1.8
1.7
1.6
1.5
1.4
1.3
1.2
1.1
1.0
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0.0
9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04 66F 01 D8
9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66 01 4D 5B
1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466 F0 4D 85 BE
EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 F0 14D 85 BB B

0 . 0 0
04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F 14 85 BB EB 0C2
66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F 01 D8 B EB 0C 2D
F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01 4D 5B BE 0 22 9
14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B
D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14 8 BB EB 0C 2D 99 59

0.4987
0.4974
0.4965
0.4953
0.4938
0.4918
0.4893
0.4861
0.4821
0.4772
0.4713
0.4641
0.4554
0.4452
0.4332
0.4192
0.4032
0.3849
0.3643
0.3413
0.3159
0.2881
0.2580
0.2257
0.1915
0.1554
0.1179
0.0793
0.0398
0.0000

0.498 I
5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01 D8 5B EB 0C 22D 99 B5 C9
BE B0 22 D9 B5 9C B1 CE E0 66 01 4D 5B BE 0C 22 9 B5 9C B1
B0 C2 D9 9B 9C 9B CE E0 466 F01 4D 85B BE B0 22 D9 9B5 9C 9B1 CE
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9 9B 9C 9B CE E0
2D 99B 59 9B 1C EE 46 6F0 14D 85 BB B C2 2D 9B 59C 9B 1C E0 46
0.01

99 59 C9 1C EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 6F0

0.4987
0.4982
0.4975
0.4966
0.4955
0.4940
0.4920
0.4896
0.4864
0.4826
0.4778
0.4719
0.4649
0.4463
0.4345
0.4207
0.4049
0.3869
0.3665
0.3438
0.3186
0.2910
0.2611
0.2291
0.1950
0.1591
0.1217
0.0832
0.0438
0.0040

0.4f 64
B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 04 6F 14
9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04 66F 01 D8
9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66 01 4D 5B
1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466 F0 4D 85 BE
EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 F0 14D 85 BB B
0.02

m
04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F 14 85 BB EB 0C2

;.4368

0.4987
0.4982
0.4976
0.4967
0.4956
0.4941
0.4922
0.4898
0.4830
0.4783
0.4726
0.4656
0.4573
0.4474
0.4357
0.4222
0.4066
0.3888
0.3686
0.3461
0.3212
0.2939
0.2642
0.2324
0.1985
0.1255
0.0871
0.0478
0.0080

0. I 628

66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F 01 D8 B EB 0C 2D
F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01 4D 5B BE 0 22 9
14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B
D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14 8 BB EB 0C 2D 99 59
5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01 D8 5B EB 0C 22D 99 B5 C9
0.03

BE B0 22 D9 B5 9C B1 CE E0 66 01 4D 5B BE 0C 22 9 B5 9C B1

0.487
Area Under Standard Normal Distribution

0.4988
0.4983
0.4977
0.4968
0.4957
0.4943
0.4925
0.4901
0.4834
0.4788
0.4732
0.4664
0.4582
0.4370
0.4236
0.4082
0.3907
0.3708
0.3485
0.3238
0.2967
0.2673
0.2357
0.2019
0.1664
0.1293
0.0910
0.0517
0.0120

B0 C2 D9 9B 9C 9B CE E0 466 F01 4D 85B BE B0 22 D9 9B5 9C 9B1 CE

0.4484
un
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9 9B 9C 9B CE E0
2D 99B 59 9B 1C EE 46 6F0 14D 85 BB B C2 2D 9B 59C 9B 1C E0 46
99 59 C9 1C EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 6F0
B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 04 6F 14
0.04

9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04 66F 01 D8

0.4988
0.4984
0.4977
0.4969
0.4959
0.4945
0.4927
0.4904
0.1875
0.4838
0.4793
0.4738
0.4671
0.4591
0.4495
0.4382
0.4251
0.4099
0.3925
0.3729
0.3508
0.3264
0.2995
0.2704
0.2389
0.2054
0.1700
0.1331
0.0948
0.0557
0.0160

9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66 01 4D 5B

Page 6 of 6
1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466 F0 4D 85 BE
ot
EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 F0 14D 85 BB B
04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F 14 85 BB EB 0C2

*********
66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F 01 D8 B EB 0C 2D
F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01 4D 5B BE 0 22 9
0.05

14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B
es

0.4989
0.4984
0.4978
0.4970
0.4960
0.4946
0.4929
0.4906
0.4878
0.4842
0.4798
0.4744
0.4678
0.4599
0.4505
0.4394
0.4265
0.4115
0.3944
0.3749
0.3531
0.3289
0.3023
0.2734
0.2422
0.2088
0.1736
0.1368
0.0987
0.0596
0.0199

D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14 8 BB EB 0C 2D 99 59
5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01 D8 5B EB 0C 22D 99 B5 C9
BE B0 22 D9 B5 9C B1 CE E0 66 01 4D 5B BE 0C 22 9 B5 9C B1

_
B0 C2 D9 9B 9C 9B CE E0 466 F01 4D 85B BE B0 22 D9 9B5 9C 9B1 CE
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9 9B 9C 9B CE E0

EB0C22D99B59C9B1CEE0466F014D85BB
0.06

2D 99B 59 9B 1C EE 46 6F0 14D 85 BB B C2 2D 9B 59C 9B 1C E0 46

0.4i89
.in

0.488!

0.4985
0.4979
0.4971
0.4961
0.4948
0.4931
0.4909
0.4846
0.4803
0.4750
0.4686
0.4608
0.4406
0.4279
0.4131
0.3962
0.3770
0.3554
0.3315
0.3051
0.2764
0.2454
0.2123
0.1406
0.1026
0.0636
0.0239

0. ! 772

0.4515

99 59 C9 1C EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 6F0


NORMAL DISTRIBUTION TABLE

B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 04 6F 14
9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04 66F 01 D8
9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 66 01 4D 5B
1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466 F0 4D 85 BE
0.07

EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46 F0 14D 85 BB B

0.4989
0.4985
0.4979
0.4972
0.4962
0.4949
0.4932
0.4911
0.4884
0.4850
0.4808
0.4756
0.4693
0.4616
0.4525
0.4418
0.4292
0.4147
0.3980
0.3790
0.3577
0.3340
0.3078
0.2794
0.2486
0.2157
0.1808
0.1443
0.1064
0.0675
0.0279

04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F 14 85 BB EB 0C2


66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F 01 D8 B EB 0C 2D
F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01 4D 5B BE 0 22 9
14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0 4D 85 B B C2 D 9B
D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14 8 BB EB 0C 2D 99 59
0.08

5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01 D8 5B EB 0C 22D 99 B5 C9

0.4990
0.4986
0.4980
0.4973
0.4963
0.4951
0.4934
0.4913
0.4887
0.4854
0.4812
0.4761
0.4699
0.4625
0.4535
0.4429
0.4306
0.4162
0.3997
0.3810
0.3599
0.3365
0.3106
0.2823
0.2517
0.2190
0.1844
0.1480
0.1103
0.0714
0.0319
Q.P. Code :31261

BE B0 22 D9 B5 9C B1 CE E0 66 01 4D 5B BE 0C 22 9 B5 9C B1
B0 C2 D9 9B 9C 9B CE E0 466 F01 4D 85B BE B0 22 D9 9B5 9C 9B1 CE
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85 BE B0 C2 D9 9B 9C 9B CE
2D 99B 59 9B 1C EE 46 6F0 14D 85 BB B C2 2D 9B 59C 9B 1C E
99 59 C9 1C EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE
0.09

B5 C B1 E 04 6F 01 D8 B E 0C 22 99 5 C9 1 EE 0

0.4990
0.4986
0.4981
0.4974
0.4964
0.4952
0.4936
0.4916
0.4890
0.4857
0.4817
0.4767
0.4706
0.4633
0.4545
0.4441
0.4319
0.4177
0.4015
0.3830
0.3621
0.3389
0.3133
0.2852
0.2549
0.2224
0.1879
0.1517
0.1141
0.0753
0.0359

9C 9B CE E0 66 01 4D 5B BE B0 22 D9 B5 9C B1 CE 04
9B 1C E0 466 F0 4D 85B BE B0 C2 D9 9B 9C 9B CE E0 6
1C EE 46 F0 14D 85 B B C2 2D 9B 59C 9B 1C E0 466
EE 046 6F 14 85 BB EB 0C 2D 99B 59 9B 1C EE 46
04 6F 014 D8 BB EB 0C 22D 99 59 C9 1C EE 046 6F
66 01 D 5B E 0C 22 9 B5 C B1 E 04 6F
F0 4D 85 B B0 2 D9 9B 9C 9B CE E0 66 01
14 85 BB EB C2 2D 9B 59 9B 1C E 46 F0
D8 B EB 0C 2D 99 5 C9 1 EE 04 6F 14
5B BE 0C 22 99 B5 9C9 B1 CE 04 66F 01
BE B0 22 D9 B5 9C B1 CE E0 66 01 4D
B0 C2 D9 9B 9C 9B CE E0 466 F01 4D
C2 2D 9B 59C 9B 1C E0 46 F0 4D 85
2D 99B 59 9B 1C EE 46 6F0 14D 85
99 59 C9 1C EE 046 6F 14 85 B
B5 C B1 E 04 6F 01 D8 B
9 E 4 B

You might also like