โครงสร้างส่วนบน PC PLANK สะพานทางหลวง ช่วง 12 ม
โครงสร้างส่วนบน PC PLANK สะพานทางหลวง ช่วง 12 ม
4 Estimate the location of the C.G. of strands at midspan, measured from the bottom of beam : ybs = 10 cm
5 Side concrete covering : c1 = 5 cm 7 Top concrete covering : c3 = 5 cm
6 Bottom concrete covering : c2 = 5 cm 8 Spacing of strand (c to c) : s = 5 cm (both vert' and horz')
3 Design Section
Section 1 2 3 4 5 6 (mid-span)
x/L 0 0.0225 0.047 0.1 0.3 0.5
x (m) 0.00 0.27 0.56 1.20 3.60 6.00
Note: x = measured from the support , L = effective span length of beam
4 Materials Property
1 Specified concrete comp strength for precast beam at 28 days : fcp' = 350 ksc
Specified concrete comp strength for precast beam at transfer prestressing : fci' = 280 ksc
Specified concrete comp strength for concrete topping (place in-situ) at 28 days : fc' = 280 ksc
2 Grade of strand prestressing : 1,860 and Dia of strand prestressing : Øp= 9.53 mm
Tensile strength : Fpu = 18,980 ksc Section area of strand prestressing : Aps= 0.548 cm /strand
2
Yield strength : Fpy = 17,080 ksc Modulus of elasticity : Eps = 1.97E+06 ksc
Jacking (or Initial) prestressing : Fsi = 0.75Fpu = 14,235 ksc (STD 9.15.1)
3 Longitudinal reinf' (or bond for transfer prestress) yeild strength : fyl = 4,000 ksc and Es = 2.00E+06 ksc
Dia. Of longitudinal reinf' : dl = 12 mm therefore section area : A* = πd /4 =
l
2
1.13 cm2/bar
No. of top reinf' in precast beam : NAS' = 0 bars then reinf' area : As' = A*.NAS' = 0.00 cm2
No. of bot reinf' in precast beam : NAS = 0 bars then reinf' area : As = A*.NAS' = 0.00 cm2
Top fiber of precast beam to C.G. of As' : d' = 3 cm
Bot fiber of precast beam to C.G. of As : d" = 3 cm
4 Transverse reinf' yield strength : fyv = 4,000 ksc
Dia.of shear reinf' : db = 12 mm and No.of shear reinf : N = 2 legs/sec
Dia.of hoz shear reinf' : db' = 12 mm and No.of hoz shear reinf' : N' = 2 legs/sec
5 Transverse Tie Rod : Steel Grade Type A490 Ultimate strength : Fu = 10,400 ksc
PROJECT : คลองระบายน้ำหลาก ป่าสัก อ่าวไทย ระยะที่ 1 Prepared By : OTS
SUBJECT : DESIGN OF COMPOSITE PRE-TENSION PLANK SLAB : SPAN 12 m. Checked By : OTS
Diameter of transverse tie rod : dt = 25 mm
Required effective post tensioning force ,see chart, : PTe = 7,000 kg/m
at any point on a span for the HS20-44 design truck and impact is not included.
16 Flexural Strength
1 After concrete cracking use strain compatibility method for cal' Ult flexural strength of section design.The assumtions
1. Strands are bonded to the concrete.
2. The initial strain from the effective prestress in the strand with no moment from applied loads act on the section
3. Stress-strain properties for the materials are known, concrete use Hognestad equation (ult strain is specified at 0.003) ,
Long' reinf' use elastic-plastic model and prestressing strand use bilinear model (second linear is slope,
yield strain is specified at 0.01 and ult strain at 0.06).
4. Strain assume to be distributed linearly over the overall depth of the beam (plane section remain plane).
5. Tension and comp forces acting on the cross section must be in equilibrium for the beam w/o external axial force.
2 The cracking moment at consider section : Mcr = (Mp + ∆Mcr)
Where Mp = Mg + Mt , ∆Mcr = (R.Pi.Sb/A + R.Pi.ec - Mp + fr.Sb)/mb , mb = Sb/Sbc = 0.67
R = Pe/Pi , fr = 2sqrt(fcp') = 37 ksc
Table 10 Cracking Moment
x/L 0 0.0225 0.047 0.1 0.3 0.5
Mp (t-m) 0 2 4 8 19 22
R 0.87 0.87 0.87 0.87 0.89 0.90
ΔMcr (t-m) 67 64 62 62 48 43
Mcr (t-m) 67 66 66 70 67 65
1.2Mcr(t-m) 80 80 79 84 80 78
17 Ductility Limits
Maximum Prestressing Reinforcement : ###
Minimum Prestressing Reinforcement : The total amount of pretensioned and non-pretensioned reinforcement
should be adequate to develop an ultimate moment at the critical section at least 1.2 times the cracking moment, Mcr
18 Shear Design (STD 9.20)
1 Pretensioned members subject to shear should be designed so that : Vu ≤ Øs(Vc+Vs) (STD Eq 9-26)
2 Nominal shear strength provide by concrete : Vc = min(Vci, Vcw)
Vci = 0.16sqrt(fcp')bdp+Vd+ViMcr/Mmax ≥ 0.45sqrt(fpc')bdp (STD Eq 9-27)
Where Vd = Unfactor shear force at the section due to dead load : Vg+Vt+Vb+Vws
Mmax = Maximum factored moment at section due to externally applied loads : Mu-Md
Md = Bending moment at section due to unfactored dead load : Mg+Mt+Mb+Mws
Vi = Factor shear force at section due to externally applied loads occurring simultaneously with Mmax :
'= Vu-Vd
Mcr = Moment causing flexural cracking of section due to externally applied loads (after dead load):
'= (1.6sqrt(fcp') + fpe - fd)Sbc (STD Eq 9-28)
fpe = Compressive stress in concrete due to effective pretension forces only, at extreme fiber of
section where tensile stress is caused by externally applied loads.: Pe/A+Peec/Sb
fd = Stress due to unfactored dead load, at extreme fiber of section where tensile stress is caused by
externally applied loads : (Mg+Mt)/Sb + (Mb+Mws)/Sbc
b = width of beam
dp = Distance from top of slab to C.G. of strand group but must more than 0.8(h+t)
Vcw = (0.93sqrt(fcp')+0.30fpc)bdp+Vp (STD Eq 9-29)
Where fpc = Compressive stress in concrete (after allow for all pretension losses) at centroid of cross section
resisting externally applied load.For a non composite section :
fpc = Pe/A-Peec(ybc-yb)/I+(Mg+Mt)(ybc-yb)/I : ybc-yb = 5 cm
Vp = Vertical component of prestress force : Vp = Pesinα = Peα = 0 ton
Table 12 Nominal Shear Strength Provided by Concrete
x/L 0 0.0225 0.047 0.1 0.3 0.5
Vd (ton) 9 8 8 7 3 0
Md (t-m) 0 2 5 9 22 26
Mmax(t-m) 0 8 16 31 65 72
Vi (ton) 30 29 28 26 18 10
fpe (ksc) 115 116 116 131 135 137
fd (ksc) 0 7 14 28 64 76
Mcr (t-m) 64 61 58 59 44 40
PROJECT : คลองระบายน้ำหลาก ป่าสัก อ่าวไทย ระยะที่ 1 Prepared By : OTS
SUBJECT : DESIGN OF COMPOSITE PRE-TENSION PLANK SLAB : SPAN 12 m. Checked By : OTS
dp (cm) 46 46 46 45 45 45
Vci (ton) 39 249 125 69 38 38
fpc (ksc) 25 27 29 35 44 47
Vcw (ton) 114 117 119 127 139 143
Vc (ton) 39 117 119 69 38 38
Note : if Vu< ØsVc/2 then shear reinf' may be omitted , the sections located at a distance less than hc/2 form
the face of the support may be designed for the same Vu as that computed at a distance hc/2
2 Horizontal shear strength provide by concrete with shear connector : Øsvnh = 22.14 ksc (STD 9.20.4.3)
Horizontal shear strength provide by concrete w/o shear connector : Øsvnh = 5.04 ksc (STD 9.20.4.3)
3 Spec min shear connector spacing : s = min(NAv"fyv/(3.5b), 4b, 60) = 26 cm (STD 9.20.4.4)
4 If vuh>Øsvnh then should be provided shear reinforcement : Av = Vuh*/(Øsfyvµ) = - cm2
where Vuh* = 0.85fc'ab = - ton (Consider at mid-span)
5 Required spacing of shear connector : s = LN'Av"/(2Av) = - cm (along span length)
20 Pretensioned Anchorage Zone
1 In pretensioned beams, vertical stirrups acting at a unit stress of 1400 ksc to resist at least 4% of the total pretensioning
force should be placed within the distance of dp/4 of the end of the beam. (STD 9.22.1)
2 Minimum stirrups at the each end of the precast beam :
Ps = Prestress force before initial losses : Ps = 0.75FpuNo.Aps = 211 ton
PROJECT : คลองระบายน้ำหลาก ป่าสัก อ่าวไทย ระยะที่ 1 Prepared By : OTS
SUBJECT : DESIGN OF COMPOSITE PRE-TENSION PLANK SLAB : SPAN 12 m. Checked By : OTS
Therefore required Av = 4%Ps/1400
6 cm= 2
& dp/4 = 11 cm
Required No. of stirrup legs : n = Av/Av' = 6 legs (Provided stirrups are enclosed)
21 Deflection and Camber
1 Camber due to pretensioning force at transfer : ∆p = 2PiecL2/(16EciI) = 3.28 cm
2 Deflection due to precast beam selfweigth : ∆g = -5wgL /(384EciI) =
4
-1.73 cm
3 Deflection at transfer : ∆p+∆g = 1.55 cm
4 Deflection at erection, use PCI multipliers : ∆i = 1.80∆p + 1.85∆g = 2.70 cm
5 Deflection due to concrete topping : ∆t = -5wtL4/(384EcI) = -0.37 cm
6 Deflection due to barrier and wearing surface : ∆SDL = -5(wb+wws)L4/(384EcIc) = -0.16 cm
18
16
14
12
10
0
0.00 0.27 0.56 1.20 3.60 6.00
Distance (m)
150
Fti(w/o
100 b)
Fti(wit
h b)
Fci
50 ft
fb
0
0.00 0.27 0.56 1.20 3.60 6.00
Required Bonded Reinforcement at Upper Region of C.G of Precast Beam Sign : - tens , + comp
Positon : x (m) 0.00 0.27 0.56 1.20 3.60 6.00
Nb (bar) N/C 15 12 9 - -
Note : Tensile stress will begin to consider at transfer length section (50 dia of strand form end beam)
Fti = Allowable tension in concrete at transfer = -0.8sqrt(fci') (w/o bond reinf')
= -2sqrt(fci') (with bond reinf')
Fci = Allowable compression in concrete at transfer =0.6fci'
PROJECT : คลองระบายน้ำหลาก ป่าสัก อ่าวไทย ระยะที่ 1 Prepared By : OTS
SUBJECT : DESIGN OF COMPOSITE PRE-TENSION PLANK SLAB : SPAN 12 m. Checked By : OTS
ft = Stress at top fiber of the precast beam
fb = Stress at bottom fiber of the precast beam
200
Stress (ksc)
150
F
t
100
F
c
50
0
0.00 0.27 0.56 1.20 3.60 6.00
150
100
F
t
50
0
0.00 0.27 0.56 1.20 3.60 6.00
100
F
t
50
F
c
0
0.00 0.27 0.56 1.20 3.60 6.00
100
Stress (ksc)
80
60
F
40 t
20
0
0.00 0.27 0.56 1.20 3.60 6.00
-20
0
0.00 0.27 0.56 1.20 3.60 6.00
-20
PROJECT Distance
-40 : คลองระบายน้ำหลาก ป่าสัก อ่าวไทย (m) 1
ระยะที่ Prepared By : OTS
SUBJECT : DESIGN OF COMPOSITE PRE-TENSION PLANK SLAB : SPAN 12 m. Checked By : OTS
Note : Case (II) = Effective pretension force + Dead loads Sign : - tens , + comp
Ft = Allowable tension in concrete at service loads
Fc = Allowable compression in concrete at service loads
ft = Stress at top fiber of the precast beam
fb = Stress at bottom fiber of the precast beam
fts = Stress at top fiber of the concrete topping
150
Stress (ksc)
100
F
t
50
F
c
0
0.00 0.27 0.56 1.20 3.60 6.00
-50
100
Stress (ksc)
80
60
F
40 t
20
0
0.00 0.27 0.56 1.20 3.60 6.00
-20
S
F
40 t
20
0
PROJECT0.00 0.27
: คลองระบายน้ำหลาก ป่าสัก0.56 1.201
อ่าวไทย ระยะที่ 3.60 6.00 By : OTS
Prepared
-20 : DESIGN OF COMPOSITE PRE-TENSION PLANK SLAB : SPAN 12 m.
SUBJECT Checked By : OTS
Note : Case (III) = Live load + 1/2(Pretensioning + Dead loads) Sign : - tens , + comp
Ft = Allowable tension in concrete at service loads
Fc = Allowable compression in concrete at service loads
ft = Stress at top fiber of the precast beam
fb = Stress at bottom fiber of the precast beam
fts = Stress at top fiber of the concrete topping
100
80
fMn
60
Mu
40
20
0
0.00 0.27 0.56 1.20 3.60 6.00
Distance (m)
Ductility Limits
Maximum Prestressing Reinforcement : #VALUE!
Minimum Prestressing Reinforcement : Consider at mid-span at 1.2Mcr = 78 t-m
Ultimate moment strength at mid-span (critical section) ØMn = #VALUE! t-m #VALUE!
100
80
fVc
60
Vu
40
20
120
Shear (ton)
100
80
PROJECT : คลองระบายน้ำหลาก ป่าสัก อ่าวไทย ระยะที่ 1 Prepared By : OTS
fVc
SUBJECT
60: DESIGN OF COMPOSITE PRE-TENSION PLANK SLAB : SPAN 12 m. Checked By : OTS
Vu
40
20
0
0.00 0.27 0.56 1.20 3.60 6.00
Distance (m)