Software Testing and QA Theory and Practice (Chapter 7: System Integration Testing) 1
Outline of the Chapter
• The Concept of Integration Testing
• Different Types of Interfaces
• Different Types of Interface Errors
• Granularity of System Integration Testing
• System Integration Techniques: Incremental, Top-down, Bottom-up,
and Sandwich and Big-bang
• Software and Hardware Integration
• Hardware Design Verification Tests
• Hardware and Software Compatibility Matrix
• Test Plan for System Integration
• Off-the-self Component Integration
• Off-the-shelf Component Testing
• Built-in Testing
Software Testing and QA Theory and Practice (Chapter 7: System Integration Testing) 2
The Concept of Integration Testing
• A software module is a self-contained element of a system
• Modules are individually tested commonly known as unit testing
• Next major task is to put the modules, i.e., pieces together to
construct the complete system
• Construction of a working system from the pieces is not a
straightforward task because of numerous interface errors
• The objective of system integration testing (SIT) is to build a
“working” version of the system
– Putting modules together in an incremental manner
– Ensuring that the additional modules work as expected without disturbing the
functionalities of the modules already put together
• Integration testing is said to be complete when
– The system is fully integrated togethr
– All the test cases have been executed
– All the severe and moderated defects found have been fixed
Software Testing and QA Theory and Practice (Chapter 7: System Integration Testing) 3
The Concept of Integration Testing
The major advantages of conducting SIT are as follows:
Software Testing and QA Theory and Practice (Chapter 7: System Integration Testing) 4
Different Types of Interfaces
Three common paradigms for interfacing modules:
The problem arises when we “put modules together” because of interface errors
Interface errors
Interface errors are those that are associated with structures existing outside the
local environment of a module, but which the module uses
Software Testing and QA Theory and Practice (Chapter 7: System Integration Testing) 5
Different Types of Interface Errors
• Construction • Inadequate error processing
• Hardware/software interfaces
Software Testing and QA Theory and Practice (Chapter 7: System Integration Testing) 6
Granularity of System Integration Testing
System Integration testing is performed at different levels of granularity
• Intra-system testing
– This form of testing constitutes low-level integration testing with the objective
of combining the modules together to build a cohesive system
• Inter-system testing
– It is a high-level testing phase which requires interfacing independently tested
systems
• Pairwise testing
– In pairwise integration, only two interconnected systems in an overall system
are tested at a time
– The purpose of pairwise testing is to ensure that two systems under
consideration can function together, assuming that the other systems within the
overall environment behave as expected
Software Testing and QA Theory and Practice (Chapter 7: System Integration Testing) 7
System Integration Techniques
Common approaches to perform system integration testing
• Incremental
• Top-down
• Bottom-up
• Sandwich
• Big-bang
Pre-requisite
A module must be available to be integrated
A module is said to available for combining with other modules when the
module’s check-in request form is ready
Software Testing and QA Theory and Practice (Chapter 7: System Integration Testing) 8
Check-in Request Form
Software Testing and QA Theory and Practice (Chapter 7: System Integration Testing) 9
Incremental
• A software image is a compiled software binary
• A build is an interim software image for internal testing within an
organization
• Constructing a build is a process by which individual modules are
integrated to form am interim software image.
• The final build is a candidate for system testing
• Constructing a software image involves the following activities
– Gathering the latest unit tested, authorized versions of modules
– Compiling the source code of those modules
– Checking in the compiled code to the repository
– Linking the compiled modules into subassemblies
– Verifying that the subassemblies are correct
– Exercising version control
Software Testing and QA Theory and Practice (Chapter 7: System Integration Testing) 10
Incremental
• Integration testing is conducted in an incremental manner as a series
of test cycles
• In each test cycle, a few more modules are integrated with an existing
and tested build to generated larger builds
• The complete system is built, cycle by cycle until the whole system is
operational for system-level testing.
• The number of SIT cycles and the total integration time are
determined by the following parameters:
– Number of modules in the system
– Relative complexity of the module (cyclomatic complexity)
– Relative complexity of the interfaces between the modules
– Number of modules needed to be clustered together in each test cycle
– Whether the modules to be integrated have boon adequately tested before
– Turnaround time for each test-debug-fix cycle
Software Testing and QA Theory and Practice (Chapter 7: System Integration Testing) 11
Incremental
• A release note containing the following information accompanies a
build.
– What has changed since the last build?
– What outstanding defects have been fixed?
– What are the outstanding defects in the build?
– What new modules, or features, have been added?
– What existing modules, or features, have been enhanced, modified, or deleted?
– Are there any areas where unknown changes may have occurred?
• A test strategy is created for each new build and the following issues
are addressed while planning a test strategy
– What test cases need to be selected from the SIT test plan?
– What previously failed test cases should now be re-executed in order to test the
fixes in the new build?
– How to determine the scope of a partial regression tests?
– What are the estimated time, resource deman, and cost to test this build?
Software Testing and QA Theory and Practice (Chapter 7: System Integration Testing) 12
Incremental
Creating a daily build is very popular among many organization
Software Testing and QA Theory and Practice (Chapter 7: System Integration Testing) 13
Top-down
• Module A has been decomposed into modules
B, C, and D
• Modules B, D, E, F, and G are terminal
modules
• First integrate modules A and B using stubs
C` and D` (represented by grey boxes)
• Next stub D` has been replaced with its actual
instance D
Figure 7.1: A module hierarchy with • Two kinds of tests are performed:
three levels and seven modules – Test the interface between A and D
– Regression tests to look for interface defects
between A and B in the presence of module D
Disadvantages
• It may not be possible to observe meaningful system functions
because of an absence of lower level modules and the presence of
stubs.
• Test case selection and stub design become increasingly difficult
when stubs lie far away from the top-level module.
Software Testing and QA Theory and Practice (Chapter 7: System Integration Testing) 16
Bottom-up
• We design a test driver to integrate
lowest-level modules E, F, and G
• Return values generated by one module
is likely to be used in another module
• The test driver mimics module C to
integrate E, F, and G in a limited way.
• The test driver is replaced with actual Figure 7.8: Bottom-up integration of
module , i.e., C. module E, F, and G
• A new test driver is used
• At this moment, more modules such as
B and D are integrated
• The new test driver mimics the behavior
of module A
• Finally, the test driver is replaced with
module A and further test are performed
Disadvantages
• Discovery of major faults are detected towards the end of the
integration process, because major design decision are embodied in
the top-level modules
• Test engineers can not observe system-level functions from a partly
integrated system. In fact, they can not observe system-level
functions until the top-level test driver is in place
Software Testing and QA Theory and Practice (Chapter 7: System Integration Testing) 18
Big-bang and Sandwich
Big-bang Approach
• First all the modules are individually tested
• Next all those modules are put together to construct the entire system
which is tested as a whole
Sandwich Approach
• In this approach a system is integrated using a mix of top-down,
bottom-up, and big-bang approaches
• A hierarchical system is viewed as consisting of three layers
• The bottom-up approach is applied to integrate the modules in the
bottom-layer
• The top layer modules are integrated by using top-down approach
• The middle layer is integrated by using the big-bang approach after
the top and the bottom layers have been integrated
Software Testing and QA Theory and Practice (Chapter 7: System Integration Testing) 19
Software and Hardware Integration
• Integration is often done in an iterative manner
• A small number of tests are performed to ensure that all the desired
software modules are present in the build
Software Testing and QA Theory and Practice (Chapter 7: System Integration Testing) 20
Hardware Design Verification Tests
A hardware engineering process consists of four phases
• Planning and specification
• Design, prototype implementation, and testing
• Integration with the software system
• Manufacturing, distribution and field service
Software Testing and QA Theory and Practice (Chapter 7: System Integration Testing) 21
Hardware Design Verification Tests
The main hardware tests are aa follows:
• Diagnostic Test
• Electrostatic Discharge Test
• Electromagnetic Emission Test
• Electrical Test
• Thermal Test
• Environment Test
• Equipment Handling and Packaging Test
• Acoustic Test
• Safety Test
• Reliability Test
Software Testing and QA Theory and Practice (Chapter 7: System Integration Testing) 22
Hardware and Software Compatibility Matrix
• H/W and s/w compatibility information is maintained in the form of a
compatibility matrix
• It documents different revisions of the h/w and s/w that will be used
for official release of the product
• An Engineering Change Order (ECO) is a formal document that
describes a change to the hardware and software
• An ECO document includes the hardware software compatible
matrix
• It is distributed to the operation, customer support and sales teams of
the organization
Software Testing and QA Theory and Practice (Chapter 7: System Integration Testing) 23
Test Plan for System Integration
Software Testing and QA Theory and Practice (Chapter 7: System Integration Testing) 24
Test Plan for System Integration
Software Testing and QA Theory and Practice (Chapter 7: System Integration Testing) 25
Test Plan for System Integration
Software Testing and QA Theory and Practice (Chapter 7: System Integration Testing) 26
Test Plan for System Integration
Categories of System Integration Tests:
• Interface integrity
– Internal and external interfaces are tested as each module is integrated
• Functional validity
– Tests to uncover functional errors in each module after it is integrated
• End-to-end validity
– Tests are designed to ensure that a completely integrated system works together
from end-to-end
• Pairwise validity
– Tests are designed to ensure that any two systems work properly when
connected by a network
• Interface stress
– Tests are designed to ensure that the interfaces can sustain the load
• System endurance
– Tests are designed to ensure that the integrated system stay up for weeks
Software Testing and QA Theory and Practice (Chapter 7: System Integration Testing) 27
Off-the-self Component Integration
Organization occasionally purchase off-the-self (OTS) components
from vendors and integrate them with their own components
Software Testing and QA Theory and Practice (Chapter 7: System Integration Testing) 28
Off-the-shelf Component Testing
OTS components produced by the vendor organizations are known as
commercial off-the-shelf (COTS) components
A COTS component is defined as:
A unit of composition with contractually specified interfaces and
explicit context dependencies only. A software component can be
deployed independently and is subject to composition by third parties
Three types of testing techniques are use to determine the suitability of
a COTS component:
• Black-box component testing: This is used to determine the quality
of the component
• System-level fault injection testing: This is used to determine how
well a system will tolerate a failing component
• Operational system testing: This kind of tests are used to determine
the tolerance of a software system when the COTS component is
functioning correctly
Software Testing and QA Theory and Practice (Chapter 7: System Integration Testing) 29
Built-in Testing
• Testability is incorporated into software components
Software Testing and QA Theory and Practice (Chapter 7: System Integration Testing) 30