Road Clearing Annex C 2025

The document is a Monthly Monitoring Report for Barangay Longos, Calasiao, Pangasinan, detailing road clearing operations for January 2025. It lists various sitios, their respective road lengths, dates of clearing, and actions taken, primarily focused on maintaining cleanliness and removing tree branches. The report is certified by barangay officials, ensuring the accuracy of the information provided.

Uploaded by

longosbarangay8
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
139 views1 page

Road Clearing Annex C 2025

The document is a Monthly Monitoring Report for Barangay Longos, Calasiao, Pangasinan, detailing road clearing operations for January 2025. It lists various sitios, their respective road lengths, dates of clearing, and actions taken, primarily focused on maintaining cleanliness and removing tree branches. The report is certified by barangay officials, ensuring the accuracy of the information provided.

Uploaded by

longosbarangay8
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Annex “C”

Brgy.

(BARANGAY LONGOS CALASIAO PANGASINAN )


Monthly Monitoring Report
On Barangay Road Clearing Operations (BaRCO)
(Latest DILG Memorandum Circular No. 2022-085 dated June 20, 2022, DILG MC No. 2023-017 dated January 25, 2023 and DILG MC No. 2024-053 dated MAY 10, 2024)
C For the Month of JANUARY CY 2025
Conducted Road Remarks (should include details
Clearing Operations Inventory of Barangay Roads, Streets, on the conduct of BaRCO from
[Check appropriate Alleys & Turned Over Road/s Road Length (in km) Date of Clearing Action Taken the 20th day to the last day of
column] [Location/Street name/Address] (d) Operation (f) the previous month; type of
YES NO (c) (e) MOV/s, other
(a) (b) information/details)
(g)
1. SITIO SAMPOT 4.00 01- 4-2025 MAINTAINING THE CLEANLINESS ACCOMPLISH
OF THE ROAD
2.SITIO BAUTISTA 5.00 01-4-2025 MAINTAINING THE CLEANLINESS ACCOMPLISH
2. SITIO CARANTO 4.00 01-8-2025 MAINTAINING THE CLEANLINESS ACCOMPLISH
3. SITIO CARON 4.OO 01-8-2025 MAINTAINING THE CLEANLINESS ACCOMPLISH
4. SITIO CENTRO 4.00 01-11- 2025 REMOVED BRANCHES OF TREE ACCOMPLISH
5. SITIO CASINTAK 4.00 01-11- 2025 REMOVED BRANCHES OF TREE ACCOMPLISH
6. SITIO CABARUAN 4.00 01-16-2025 MAINTAINING THE CLEANLINESS ACCOMPLISH
OF THE ROAD
7. SITIO SALINAS 5.00 01-16- 2025 MAINTAINING THE CLEANLINESS ACCOMPLISH
8. SITIO BACOL 4.00 01-21- 2025 MAINTAINING THE CLEANLINESS ACCOMPLISH
OF THE ROAD

Total
Prepared by:
I hereby CERTIFY and DECLARE that the above information
BRGY SEC. MARIDEL E. CASONGSONG and activities are true and accurate to the best of my knowledge.
________________________________________________________________
(Barangay Official/Authorized Barangay Personnel Designated by the PB HON. JOSEPH A. USON
_____________________________________________
Punong Barangay
“Kalinisan at Kaayusan sa Bagong Pilipinas”