0% found this document useful (0 votes)
4 views

Initial Pages Project Ip

The project report on Morse Code Encryption outlines the development of a tool for encoding and decoding messages in Morse code, aimed at enhancing programming skills and understanding of software development. It details the objectives, proposed system, and the System Development Life Cycle (SDLC) phases involved in the project. The report also includes acknowledgments, a flow chart, source code, output, and a bibliography.

Uploaded by

Aryan
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views

Initial Pages Project Ip

The project report on Morse Code Encryption outlines the development of a tool for encoding and decoding messages in Morse code, aimed at enhancing programming skills and understanding of software development. It details the objectives, proposed system, and the System Development Life Cycle (SDLC) phases involved in the project. The report also includes acknowledgments, a flow chart, source code, output, and a bibliography.

Uploaded by

Aryan
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 18

SPRING DALE PUBLIC SCHOOL

SESSION : 2023-24
PROJECT REPORT ON
MORSE CODE ENCRYPTION

Submitted By: Submitted to:


NAME : Aryan Ms. Mandip Bedi
ROLL NO : PGT (IP)
CLASS : XII
SUBJECT : INFORMATICS PRACTICES
SUB CODE : 065
CERTIFICATE
This is to certify that Aryan Roll No: ……………… has successfully

completed the project Work entitled MORSE CODE ENCRYPTION in the

subject Informatics Practices (065) laid down in the regulations of CBSE for the

purpose of Practical Examination in Class XII to be held in

on______________.

Internal Examiner: External Examiner:


Name: _______________ Name: _______________
Signature: Signature:
TABLE OF CONTENTS

PAGE
SER DESCRIPTION
NO

01 ACKNOWLEDGEMENT

02 INTRODUCTION

03 OBJECTIVES OF THE PROJECT

04 PROPOSED SYSTEM

05 SYSTEM DEVELOPMENT LIFE CYCLE (SDLC)

06 PHASES OF SYSTEM DEVELOPMENT LIFE CYCLE

07 FLOW CHART

08 SOURCE CODE

09 OUTPUT

10 HARDWARE AND SOFTWARE REQUIREMENTS

11 BIBLIOGRAPHY

ACKNOWLEDGEMENT
Apart from the efforts of me, the success of any project depends largely
on the encouragement and guidelines of many others. I take this opportunity to
express my gratitude to the people who have been instrumental in the successful
completion of this project.

I express deep sense of gratitude to almighty God for giving me strength


for the successful completion of the project.

I express my heartfelt gratitude to my parents for constant encouragement


while carrying out this project.

I gratefully acknowledge the contribution of the individuals who


contributed in bringing this project up to this level, who continues to look after
me despite my flaws,

I express my deep sense of gratitude to the luminary The Principal, Mr.


Anil Kumar Sharma who has been continuously motivating and extending their
helping hand to us.

I express my sincere thanks to Ms. Mandip Bedi, for constant


encouragement and the guidance provided during this project and helped in
solving each and every problem, occurred during implementation of the project

The guidance and support received from all the members who contributed
and who are contributing to this project, was vital for the success of the project.
I am grateful for their constant support and help.

PROJECT ON MORSE CODE ENCRYPTION


INTRODUCTION

Our Morse Code Encryption project offers a seamless way to encode and decode

messages in Morse code. Designed for simplicity and efficiency, the tool converts English

text into Morse code and vice versa, enabling secure and fun communication. Ideal for

educational purposes, amateur radio enthusiasts, or anyone interested in cryptography, the

project demonstrates the practical application of Morse code in modern times. With an

intuitive interface, it bridges the gap between traditional communication and modern

technology

OBJECTIVES OF THE PROJECT

The objective of this project is to let the students apply the programming

knowledge into a real- world situation/problem and exposed the students how

programming skills helps in developing a good software.

1. Write programs utilizing modern software tools.

2. Apply object oriented programming principles effectively when

developing small to medium sized projects.

3. Write effective procedural code to solve small to medium sized problems.

4. Students will demonstrate a breadth of knowledge in Informatics

Practices, as exemplified in the areas of systems, theory and software

development.
5. Students will demonstrate ability to conduct a research or applied IP

project, requiring writing and presentation skills which exemplify

scholarly style in the subject.

PROPOSED SYSTEM

Today one cannot afford to rely on the fallible human beings of be really

wants to stand against today’s merciless competition where not to wise saying

“to err is human” no longer valid, it’s outdated to rationalize your mistake. So,

to keep pace with time, to bring about the best result without malfunctioning

and greater efficiency so to replace the unending heaps of flies with a much

sophisticated hard disk of the computer.

One has to use the data management software. Software has been an

ascent in atomization various organisations. Many software products working

are now in markets, which have helped in making the organizations work easier

and efficiently. Data management initially had to maintain a lot of ledgers and a

lot of paper work has to be done but now software product on this organization

has made their work faster and easier. Now only this software has to be loaded

on the computer and work can be done.

This prevents a lot of time and money. The work becomes fully

automated and any information regarding the organization can be obtained by


clicking the button. Moreover, now it’s an age of computers of and automating

such an organization gives the better look.

SYSTEM DEVELOPMENT LIFE CYCLE (SDLC)

The systems development life cycle is a project management technique


that divides complex projects into smaller, more easily managed segments or
phases. Segmenting projects allows managers to verify the successful
completion of project phases before allocating resources to subsequent phases.
Software development projects typically include initiation, planning,
design, development, testing, implementation, and maintenance phases.
However, the phases may be divided differently depending on the organization
involved.
For example, initial project activities might be designated as request,
requirements-definition, and planning phases, or initiation, concept-
development, and planning phases. End users of the system under development
should be involved in reviewing the output of each phase to ensure the system is
being built to deliver the needed functionality.

PHASES OF SYSTEM DEVELOPMENT LIFE CYCLE

INITIATION PHASE

The Initiation Phase begins when a business sponsor identifies a need or an


opportunity.

The purpose of the Initiation Phase is to:

 Identify and validate an opportunity to improve business


accomplishments of the organization or a deficiency related to a business
need.
 Identify significant assumptions and constraints on solutions to that need.
 Recommend the exploration of alternative concepts and methods to
satisfy the need including questioning the need for technology, i.e., will a
change in the business process offer a solution?
 Assure executive business and executive technical sponsorship. The
Sponsor designates a Project Manager and the business need is
documented in a Concept Proposal. The Concept Proposal includes
information about the business process and the relationship to the
Agency/Organization.
 Infrastructure and the Strategic Plan. A successful Concept Proposal
results in a Project Management Charter which outlines the authority of
the project manager to begin
the project.

Careful oversight is required to ensure projects support strategic business


objectives and resources are effectively implemented into an organization's
enterprise architecture. The initiation phase begins when an opportunity to add,
improve, or correct a system is identified and formally requested through the
presentation of a business case. The business case should, at a minimum,
describe a proposal’s purpose, identify expected benefits, and explain how the
proposed system supports one of the organization’s business strategies. The
business case should also identify alternative solutions and detail as many
informational, functional, and network requirements as possible.

SYSTEM CONCEPT DEVELOPMENT PHASE

The System Concept Development Phase begins after a business need or


opportunity is validated by the Agency/Organization Program Leadership and
the Agency/Organization CIO.

The purpose of the System Concept Development Phase is to:

 Determine the feasibility and appropriateness of the alternatives.


 Identify system interfaces.
 Identify basic functional and data requirements to satisfy the business
need.
 Establish system boundaries; identify goals, objectives, critical success
factors, and performance measures.
 Evaluate costs and benefits of alternative approaches to satisfy the basic
functional requirements
 Assess project risks
 Identify and initiate risk mitigation actions, and Develop high-level
technical architecture, process models, data models, and a concept of
operations. This phase explores potential technical solutions within the
context of the business need.
 It may include several trade-off decisions such as the decision to use
COTS software products as opposed to developing custom software or
reusing software components, or the decision to use an incremental
delivery versus a complete, onetime deployment.
 Construction of executable prototypes is encouraged to evaluate
technology to support the business process. The System Boundary
Document serves as an important reference document to support the
Information Technology Project Request (ITPR) process.
 The ITPR must be approved by the State CIO before the project can
move forward.

PICTORIAL REPRESENTATION OF SDLC:

PLANNING PHASE
The planning phase is the most critical step in completing development,
acquisition, and maintenance projects. Careful planning, particularly in the early
stages of a project, is necessary to coordinate activities and manage project risks
effectively. The depth and formality of project plans should be commensurate
with the characteristics and risks of a given project. Project plans refine the
information gathered during the initiation phase by further identifying the
specific activities and resources required to complete a project.
A critical part of a project manager’s job is to coordinate discussions
between user, audit, security, design, development, and network personnel to
identify and document as many functional, security, and network requirements
as possible. During this phase, a plan is developed that documents the approach
to be used and includes a discussion of methods, tools, tasks, resources, project
schedules, and user input. Personnel assignments, costs, project schedule, and
target dates are established.
A Project Management Plan is created with components related to
acquisition planning, configuration management planning, quality assurance
planning, concept of operations, system security, verification and validation,
and systems engineering management planning.

REQUIREMENTS ANALYSIS PHASE

This phase formally defines the detailed functional user requirements


using high-level requirements identified in the Initiation, System Concept, and
Planning phases. It also delineates the requirements in terms of data, system
performance, security, and maintainability requirements for the system. The
requirements are defined in this phase to alevel of detail sufficient for systems
design to proceed. They need to be measurable, testable, and relate to the
business need or opportunity identified in the Initiation Phase. The requirements
that will be used to determine acceptance of the system are captured in the Test
and Evaluation MasterPlan.
The purposes of this phase are to:

 Further define and refine the functional and data requirements and
document them in the Requirements Document,
 Complete business process reengineering of the functions to be supported
(i.e., verify what information drives the business process, what
information is generated, who generates it, where does the information
go, and who processes it),
 Develop detailed data and process models (system inputs, outputs, and
the process.
 Develop the test and evaluation requirements that will be used to
determine acceptable system performance.

DESIGN PHASE

The design phase involves converting the informational, functional, and


network requirements identified during the initiation and planning phases into
unified design specifications that developers use to script programs during the
development phase. Program designs are constructed in various ways. Using a
top-down approach, designers first identify and link major program components
and interfaces, then expand design layouts as they identify and link smaller
subsystems and connections. Using a bottom-up approach, designers first
identify and link minor program components and interfaces, then expand design
layouts as they identify and link larger systems and connections. Contemporary
design techniques often use prototyping tools that build mock-up designs of
items such as application screens, database layouts, and system architectures.
End users, designers, developers, database managers, and network
administrators should review and refine the prototyped designs in an iterative
process until they agree on an acceptable design. Audit, security, and quality
assurance personnel should be involved in the review and approval process.
During this phase, the system is designed to satisfy the functional requirements
identified in the previous phase. Since problems in the design phase could be
very expensive to solve in the later stage of the software development, a variety
of elements are considered in the design to mitigate risk. These include:

 Identifying potential risks and defining mitigating design features.


 Performing a security risk assessment.
 Developing a conversion plan to migrate current data to the new system.
 Determining the operating environment.
 Defining major subsystems and their inputs and outputs.
 Allocating processes to resources.
 Preparing detailed logic specifications for each software module. The
result is a draft System Design Document which captures the preliminary
design for the system.
 Everything requiring user input or approval is documented and reviewed
by the user. Once these documents have been approved by the Agency
CIO and Business Sponsor, the final System Design Document is created
to serve as the Critical/Detailed Design for the system.
 This document receives a rigorous review byAgency technical and
functional representatives to ensure that it satisfies the business
requirements. Concurrent with the development of the system design, the
Agency Project Manager begins development of the Implementation
Plan, Operations and Maintenance Manual, and the Training Plan.

DEVELOPMENT PHASE

The development phase involves converting design specifications into


executable programs. Effective development standards include requirements
that programmers and other project participants discuss design specifications
before programming begins. The procedures help ensure programmers
clearly understand program designs and functional requirements.
Programmers use various techniques to develop computer programs. The
large transaction oriented programs associated with financial institutions
have traditionally been developed using procedural programming techniques.
Procedural programming involves the line-by-line scripting of logical
instructions that are combined to form a program. Effective completion of
the previous stages is a key factor in the success of the Development phase.
The Development phase consists of:

 Translating the detailed requirements and design into system components.


 Testing individual elements (units) for usability.
 Preparing for integration and testing of the IT system.

INTEGRATION AND TEST PHASE

 Subsystem integration, system, security, and user acceptance testing is


conducted during the integration and test phase. The user, with those
responsible for quality assurance, validates that the functional
requirements, as defined in the functional requirements document, are
satisfied by the developed or modified system. OIT Security staff assess
the system security and issue a security certification and accreditation
prior to installation/implementation.

Multiple levels of testing are performed, including:

 Testing at the development facility by the contractor and possibly


supported by end users
 Testing as a deployed system with end users working together with
contract personnel

 Operational testing by the end user alone performing all functions.


Requirements are traced throughout testing ,a final Independent
Verification & Validation evaluation is performed and all documentation
is reviewed and accepted prior to acceptance of the system.

IMPLEMENTATION PHASE

This phase is initiated after the system has been tested and accepted by
the user. In this phase, the system is installed to support the intended business
functions. System performance is compared to performance objectives
established during the planning phase. Implementation includes user
notification, user training, installation of hardware, installation of software onto
production computers, and integration of the system into daily work processes.
This phase continues until the system is operating in production in accordance
with the defined user requirements.

OPERATIONS AND MAINTENANCE PHASE


The system operation is ongoing. The system is monitored for continued
performance in accordance with user requirements and needed system
modifications are incorporated. Operations continue as long as the system can
be effectively adapted to respond to the organization’s needs. When
modifications or changes are identified, the system may re enter the planning
phase.
The purpose of this phase is to:
 Operate, maintain, and enhance the system.
 Certify that the system can process sensitive information.
 Conduct periodic assessments of the system to ensure the functional
requirements continue to be satisfied.
 Determine when the system needs to be modernized, replaced, or retired.
CODING

BIBLIOGRAPHY
Informatics Practices with Python by Preeti Arora

Informatics Practices by Sumita Arora

WEBSITE: http://www.wikipedia.org

You might also like