0% found this document useful (0 votes)
17 views

PFMEA_LUMAX

The document outlines various process functions related to raw material handling, inspection, and production, highlighting potential failure modes and their effects. It details current process controls and recommended actions to prevent failures, including training and verification measures. The document emphasizes the importance of proper material identification, storage, and inspection to ensure quality and compliance in production operations.

Uploaded by

sukhbir.singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views

PFMEA_LUMAX

The document outlines various process functions related to raw material handling, inspection, and production, highlighting potential failure modes and their effects. It details current process controls and recommended actions to prevent failures, including training and verification measures. The document emphasizes the importance of proper material identification, storage, and inspection to ensure quality and compliance in production operations.

Uploaded by

sukhbir.singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

C O D D

S L C E R Resp. & Target S O E R


Process function Potential Cause (s) Mechanism(s) Current Process Control Recommended Action C
Requirement Potential Failure Mode Potential Effect Of Failure E A C Current Process Control Detection T P Completion E T P
Requirement of Failure Prevention Action(s) Taken C
V S U E N Date V E N
S R C U C
R
>Identification missing on bags
Material receiving as per -Material grade not as per >Verified by store person during unloading of material
invoice invoice
-Production line may suffer 7 Normal >Material not verified with invoice during 2 WI for good receipt is in place.
check sheet
7 98 Nill
unloading

>Material bags & box damaged during >Unloading Method defined


Material packaging Material/parts May be >Quality inspector verify packaging during incoming
10 & Raw Material & Brass condition should be ok Material Box & Bags damaged. scrapped
7 Normal unloading-unloading method not defined. 2 >Packing Standard defined & agreed by
inspection
7 98 Nill
10A Insert M2.6 Receipt >packaging standard not defined. supplier

>No location defined for material


>Location identified for every grade
Material storage as per Material placed in unidentified Mixing of material with identification. >Store person verify the material storage as per
defined location location other grade
6 Normal
>Operator not aware about identified
2 material on Material Storage Board
defined location
7 84 Nill
>Trained IQC/Store person
location.

>Material received without verification


Correct Grade of >No awareness imparted to inspector/store
>Approved supplier
Material( PBT+PC - Wrong grade,properties/ person to verify grade >Supplier Material Test Certificate
>Trained IQC/Store person
( GF+GS) 40 specification of material parts will be scrapped 7 Normal >MTC not provided by supplier 2
for good receipt is in place at store.
>Incoming inspection report / GRN clearance through 4 56 Nill
(Polyplastics) / Black Received >Unapproved supplier SAP
>MTC along with material
Received >No Identification tag/print of grade on
material bag.
Incoming Inspection
20
( Raw material ) >Not verified during inspection >Incoming inspection standard
>Incoming inspection report/GRN clearance through
Damaged >Not verified during material issuance >Shelf life monitoring is in place
Material condition
expired material,Moisture
parts will be scrapped 7 Normal
Material bags damaged or open in storage
2
>Material bags condition checked during
SAP 4 56 Nill
>Monthly review of shelf life
location unloading.

>Specific inspection standard


>Identified visual ,Fitment & Functional
Testing parametrs of as material not per test MFI- >Trained Inspector >Material as per testing standard & Supplier PDI
per specification specification
parts will be scrapped 7 Normal defect not considered in inspection check 2
>Approved supplier & PPAP Conduct at report
5 70 Nill
sheet
suppleir end.

>Material received without verification


>No awareness imparted to inspector/store
>Approved supplier
Correct Grade of Wrong grade,properties/ person to verify grade >Supplier Material Test Certificate
>Trained IQC/Store person
Material Brass / Yellow ) specification of material parts will be scrapped 7 Normal >MTC not provided by supplier 2
for good receipt is in place at store.
>Incoming inspection report / GRN clearance through 4 56 Nill
Received Received >Unapproved supplier SAP
>MTC along with material
>No Identification tag/print of grade on
material bag.

>Not verified during inspection >Incoming inspection standard


Damaged >Not verified during material issuance >Shelf life monitoring is in place >Incoming inspection report/GRN clearance through
Material condition parts will be scrapped 7 Normal 2 4 56 Nill
Incoming Inspection material,Rust , Dust etc. Material bags damaged or open in storage >Material bags condition checked during SAP
20A location unloading.
( Brass Insert M2.6 )

> Minimum Skill level 3 inspector deputed > inspection done as per inspection standard at IQC
Insert Thread Miss/ >Part not check as per drawing
Part rejected at customer on receipt stage. level.
Profile should not be Insert Thread Miss / Damage
end / Line may suffer.
7 Normal requirements. 2
> Part check as per inspection plan and > Minimun Skill Level 3 Inspector on receipt stage.
5 70 Nill
Damage > Un Skilled Inspector .
standard. > Followed the sampling plan ( IM/QA/09)

>Identified visual ,Fitment & Functional >Specific inspection standard >As per testing standard & Supplier PDI report.
Dimension should be as Part not assembled at defect not considered in inspection check >Trained Inspector > Material inspection as per inspection report.(
per specification
Dimensions not as per drawing
assembly process
7 Normal
sheet.
2
>Approved supplier & PPAP Conduct at IM/QA/01)
5 70 Nill
> MTC not as per standard. suppleir end. > Receipt Inspection as per Inspection Std.

>No location defined for material


>Location identified for every grade
Material storage as per Material placed in unidentified Mixing of material with identification. >Store person verify the material storage as per
defined location location other grade
6 Normal
>Operator not aware about identified
2 material on Material Storage Board
defined location.
7 84 Nill
>Trained IQC/Store person
location.

Mixing of material with > Operator not aware about FIFO. > Store Engineer verify material on daily basis.
Material storage as per > Trained Operator at storage location.
FIFO system
FIFO not followed. different same grade 6 Normal > FIFO not followed by Operator. 2
> FIFO WI displayed at location.
> Training to store person as per plan. 7 84 Nill
Storage of raw material > FIFO borad not maintened. > FIFO controlled by SAP.
30 &
material & Brass
30A
Insert M2.6 Material / chemical self > Self life of material / chemical not > Material self line monitor as per
life should not be expired
Material self life expired. parts will be scrapped 7 Normal
mainten on daily basis.
2
mentioned on checmical drums/bottels.
> Self life control through the SAP system. 3 42 Nill

>No location defined for material


Mixing of material with
Indentification of RM as identification. > Training provided for person as per plan.
per grade
Wrong identification on bag other grade. 5 Normal
>Operator not aware about Identification
2 >Trained IQC/Store person
> Identification tag on RM bags/box.
6 60 Nill
Prod. Line may suffer
tag
C O D D
S L C E R Resp. & Target S O E R
Process function Potential Cause (s) Mechanism(s) Current Process Control Recommended Action C
Requirement Potential Failure Mode Potential Effect Of Failure E A C Current Process Control Detection T P Completion E T P
Requirement of Failure Prevention Action(s) Taken C
V S U E N Date V E N
S R C U C
R

Raw Material & Brass >No location defined for material > Material as per planning sheet.
> Store person verify material bag tag with planning
40 & Correct material issue to Wrong material issurance from identification. > SAP grade and material bag Tag match.
Insert M2.6 Issue production. RM store
parts will be scrapped 7 Normal
>Identification tag wrong on bags.
2
> material issue through SAP reservation
sheet. 4 56 Nill
40A >RM issued as per SAP reservation Slip.
Prod. > material reservation slip not followed. Slip.

>Digital Display show the preheating


>Operator recorded Process parameter in Process
>Wrong Temperature setting temperature
Silver Line/glass mark Parameter sheet.
>operator not trained >Machine PM frequency defined
Preheating temp less/ More (Moisture) creation on the 4 Normal
>Heater malfunctioning
2
>Moisture content parameter covered in
> Re-Verification by LQA & Production Engineer 4 32 Nill
Surface of the Part. >MTC verified
>Moisture in material MTC
Material Preheating temp > M/C PLC controlled.
>Operation Standard defined
& Time as per
specification
Colour Variation , Poor >Wrong Parameter setting >Digital Display show the preheating > Operator recorded Process parameter in Process
Appearance , Part Rejected >operator not trained temperature Parameter sheet.
Preheating Time Less / More
& material jam in hopper or
7 Normal
>Heater malfunctioning
2
>Machine PM frequency defined > Re-Verification by LQC & Production Engineer.
6 84 Nill
Raw Material oven. >Preheating Temp. Not freezed. >Operation Standard defined > Record in material Pre-Heating Register.
50
Preheating
> Material issue throught the material issue
> Material issue from the SAP as per material
Right material load on Wrong material load in > Material issue system not followed. slip.
Machine. machine Hopper
parts will be scrapped 7 Normal
> Material not punch in SAP
2
> issue slip reverify & singed by the shift
mention in BOM. 4 56 Nill
> Reservation Issue Slip.
engineer.

> Clenaning of hopper properly check on check by


No other materpial resin
Colour Variation , Poor > Material cleaning process not followed shift supervisor & record in Mold Loading / Unloading
contamination mixed other material contaminiation > Material clean properly by Shift
with the other material in mixed with other material
Appearance , Part Rejected 7 Normal by operator during start up and change 2
supervisor by air gun.
sheet. 7 98 Nill
. over > Machine start up WI displayed for cleaning of
Hopper
Hopper.

> Re-Verification by LQC & Production Engineer


6 Normal >High injection pressure 2 > First/Last Part Approval by LQC Engineer . 4 48 Nill
> Machine Parameter PLC control.

> Shot weight setting as per Operation standard .


>Re-Verification by LQC & Production Engineer
6 Normal >Excess Shot Weight 2
> First/Last Part Approval by LQC Engineer .
4 48 Nill
> Machine Parameter PLC Control.
>Process parameter freezed & set as per
operation standard >Barrel temp. setting as per Operation standard .
WI for visual defects > Re-Verification by LQC & Production Engineer
6 Normal >Excess Barrel Temp. 2
> First/Last Part Approval by LQC Engineer .
4 48 Nill
> Machine Parameter PLC Control.

> Process parameter setting as per Operation


standard .
6 Normal >Wrong parameter setting at start up 2
> Re-Verification by LQC & Production Engineer
5 60 Nill
Insert Injection
> First/Last Part Approval by LQC Engineer .
Moulding / Cooling &
No Flash , Burr & Problem in Fitment at Assy
60 FPA/LPA & Inprocess Scratch Allowed
Flash , Burr & Scratch on parts
Line and at customer end
Inspection > Process parameter setting as per Operation
PM of machine standard .
6 Normal >Machine parameters malfunctioning 2
> Re-Verification by LQC & Production Engineer
5 60 Nill
> First/Last Part Approval by LQC Engineer .

6 Normal >Mould life over 2 >Shot monitoring and total shot decide >Mould history card maintain on daily basis. 6 72 Nill

> Process parameter setting as per Operation


standard .
>Process parameter freezed & set as per
6 Normal >Mould Clamping pressure less 2
operation standard
> Re-Verification by PQA & Production Engineer 4 48 Nill
> First/Last Part Approval by LQC Engineer .
> Machine Parameter PLC Control

>First/Last part approval by LQC Engineer.


> Visual inspection of parts.
6 Normal >Wear and tear in the mould 2 >Preventive Maintenance of the mould > Preventive maintenance of mould as per schedule. 6 72 Nill
> Charging position checked and recorded during
start of production .
C O D D
S L C E R Resp. & Target S O E R
Process function Potential Cause (s) Mechanism(s) Current Process Control Recommended Action C
Requirement Potential Failure Mode Potential Effect Of Failure E A C Current Process Control Detection T P Completion E T P
Requirement of Failure Prevention Action(s) Taken C
V S U E N Date V E N
S R C U C
R
>First/Last part approval by LQC Engineer.
> Visual inspection of parts.
7 Normal >Wear and tear in the mould 2 > Preventive maintenance of mould as per schedule. 7 98 Nill
> Charging position checked and recorded during
start of production .
No Short Filling / Short
Short Filling / Short Mould /
Mould / Tool Problem in Fitment at Assy >Process parameter freezed & set as per > Shot weight setting as per Operation standard .
Tool Deformation Mark ,
Deformation Mark , Line and part reject & operation standard >Re-Verification by LQC & Production Engineer
Flash / Scratch / Dent /
Flash / Scratch / Dent / Stain
Appearnce NG
7 Normal >Less shot weight 2
WI for visual defects > First/Last Part Approval by LQC Engineer .
4 56 Nill
& crack.
Stain & crack. > Machine Parameter PLC Control.
> injection barrel temp checked and recorded during
start of production.
7 Normal >Low barrel temperature 2
> FirstLast Part approval LQC Engineer.
4 56 Nill
> Machine Parameter PLC Control.
> injection pressure checked and recorded during
start of production.
7 Normal >Less injection pressure 2
> FirstLast Part approval LQC Engineer.
4 56 Nill
> Machine Parameter PLC Control.
> Shot weight setting as per Operation standard .
>Process parameter freezed & set as per
>Re-Verification by LQC & Production Engineer
7 Normal >Less shot weight 2 operation standard
> First/Last Part Approval by LQC Engineer .
4 56 Nill
> Fitment NG at customer WI for visual defects
end > Machine Parameter PLC Control.
Insert Injection No Shrinkage/Warpage Shrinkage/Warpage
> Non fulfill of customer >Temp. checked and recorded during start of
Moulding / Cooling & requirment. production .
> part reject ,Appearnce 7 Normal >Low barrel temperature 2
> First Part Approval.
4 56 Nill
60 FPA/LPA & Inprocess NG > Machine Parameter PLC Control.
Inspection
> Fixture handoverd to production team as per
> Fixture impleted and trained manpower internal system.
deputed on machine Skill Level 3. > Trained manpower deputed skilllevel 3.
7 Normal > Part not cooled with fixture 2
> Fixture checked by senior person during > Cooling fixture conditon check on regular interval.
7 98 Nill
initial producton start up on machine. > FPA /LPA & In process Inspection as per sampling
plan.

> Process Parameter setting and recorded during


No Flow mark Part / >Preheating of raw material prior to start of
Flow mark Part / White mark / start of production
White mark /
Discoloration
Appearnce NG 5 Normal >Preheating not proper of raw material 2 production
> First/Last part Approval by LQC Engineer.
7 70 Nill
Discoloration WI for visual defects
> Parameter verification on regular basis.

> barrel temp checked and recorded during start of


>Process parameter freezed & set as per production
7 Normal >barrel temp high 2 operation standard > First/Last Part Approval by LQC Engineer. 4 56 Nill
WI for visual defects >100% Inspection of parts.
> Machine Parameter PLC Control.
Appearnce NG/Material
No Burning Mark Burning mark
property may degrade
> First / Last Part Approval by LQC Engineer.
>Purging of material befotre start of
>Inprocess petroling inspection
7 Normal >Material degrade in barrel 2 production (if production stop for a long
>Match production report vs Purged material qty.
4 56 Nill
time.
> M/c cycle time control by PLC control.
C O D D
S L C E R Resp. & Target S O E R
Process function Potential Cause (s) Mechanism(s) Current Process Control Recommended Action C
Requirement Potential Failure Mode Potential Effect Of Failure E A C Current Process Control Detection T P Completion E T P
Requirement of Failure Prevention Action(s) Taken C
V S U E N Date V E N
S R C U C
R
> Fixture handoverd to production team as per
> Inspection skipped during production.
> Fixture impleted and trained manpower internal system.
> Untrained manpower for operator /
Part Should be cooled Apperance NG / Dimension deputed on machine Skill Level 3. > Trained manpower deputed skilllevel 3.
with Fixture.
Skilled Part cooling with fixture.
NG
7 Normal Inspector. 2
> Fixture checked by senior person during > Cooling fixture conditon check on regular interval.
7 98 Nill
> Cooling fixture not in use.
initial producton start up on machine. > FPA /LPA & In process Inspection as per sampling
> Cooling fixture damage/
plan.
> Part machine matrix not made. > Part load on machine as per define machine
> Part mold load on machine as per plan.
> prod. Plan not followed. tonnage in PPS.
M/c Selection as per M/c Tonnage not as per define Appearnce NG/Material > Mold / Machine matrix made for prod.
standard standard. property may degrade
7 Normal > Untrained Prod. Shift incharge. 2
Running parts.
> Reverify the shift incharge. 7 98 Nill
> Machine tonnage not define in PPS of > Training of operatr / shift supervisor as per plan.
> Machine tonnage define in PPS of part.
parts. > Mold load on machine as per matrix.
> Clamp force set at the mold set up on
> Clamp force not validiate at the time
Clamping Force as per machine of every set up. > Part FPA/LPA approval by LQC team.
specification
Clamping force low or High Part Appearnce NG 5 Normal mold setup on machine. 2
> Minimum skilled level 3 operator deputed > Minimum Skill level operator / inspector level 3.
5 50 Nill
> Un trained machine Operator.
on machine.

> Mold not fit in the Machine by fitment of


Proper position of mold Part Appearnce NG , Mold > Mold fit the machine with the machine > Mold set up by the shift supervisor.
clamp.
Improper Mold Clamp Position
may be damage.
6 Normal machine loacating ring. 2
loacating ring. > FPA/LPA approve by the LQC team.
5 60 Nill
Insert Injection > Untrained Operator for mold set up.
Moulding / Cooling &
60 FPA/LPA & Inprocess Cstomer line may > Mold load on machine not as per plan. > Mold load on machine as per plan. Reverify the mold plan by shift supervisor.
Inspection Correct mold setup Incorrect mold set up
suffer/decreased line speed
5 Normal
> Mold / maachine matrix not followed.
2
> Mold/ machine matrix followed. > Identification Available on mold.
7 70 Nill
> Mold not fit in the Machine by fitment of
Correct alingnment of Misalignment of the nozzle Part Appearnce NG ,Shot > Mold fit the machine with the machine > Mold set up by the shift supervisor.
Nozzle with the tool with the tool molding .
7 Normal machine loacating ring. 2
loacating ring. > FPA/LPA approve by the LQC team.
5 70 Nill
> Untrained Operator for mold set up.
> Machine parameter not set as per part > Parameter set by the shift supervisor as > Machine parameter check by the LQC inspector as
Incorrect mold temperature
Temp. of mold as per Part Appearnce NG. / Part PPS sheet. per part PPS. recorded in process control chart sheet.
PPS
(cooling lines misrouted,
reject at Inspection.
6 Normal
> Untrained operator for machine paraeter
2
> Skill level minimum 3 operator deputed >FPA/LPA approve by LQC team.
4 48 Nill
incorrect MTC settings,
set up. on machine > Mold Temp PLC Control.
No contamination , no > Mold set up by the shift supervisor.
blocking of cooling lines , > mold cooling line / MTC not check during > Mold check by shfit supervisor on > Mold check by the supervisor before load on the
contaminated /blocked cooling Part Appearnce NG. / Part
incorrect MTC
lines, improper cycle time), reject at Inspection.
5 Normal the mold set up on machine. 3 visually for mold readiness. machne visually. 4 60 Nill
settings ,proper cycle > Mold cooling not PM not done. >Mold PM as per define plan / frequency. > Cycle time and cooling system controlled by M/c
time as PPS. PLC .
> It is controlled by the machine poka yoke
> Operator delay the cycle time during Part FPA/LPA approval from the LQC team.
No material Hold too Holding material for too long in Material Burned in Barrel PLC control.
long time in barrel barrel and chocked.
7 Normal mold unloanding. 2
> Purging done for every start up machine
> Cycle time controlled by the machine Poka yoke 4 56 Nill
> During machine start up. PLC controlled.
delay more thean 10 minutes.
> It is ctrolled from initial design phase.
gate squencing / Incorrect gate sequencing / Part Appearnce NG. / Part > gate Squencing not define in mold at the > Mold gate squencing define during mold
balncing must be correct. balancing the cavities,etc.) , reject at Inspection.
6 Normal
mold manufacturing.
2
design phase.
> Visually check the gate point condition by prod. 4 48 Nill
Operator / supervisor.
C O D D
S L C E R Resp. & Target S O E R
Process function Potential Cause (s) Mechanism(s) Current Process Control Recommended Action C
Requirement Potential Failure Mode Potential Effect Of Failure E A C Current Process Control Detection T P Completion E T P
Requirement of Failure Prevention Action(s) Taken C
V S U E N Date V E N
S R C U C
R
>Skilled Oprator deputed Level-3
>Opeartor not trained >Provide the training to operator about the
Fitment of brass insert Brass insert fitment not as per Part Fitment NG 7 2 >First/Last part approval and PDI report.
should be correct specification Functional Failure
Normal > Wrong method followed by operator part inserting process .
( IM/QA/23)
7 98 Nill
during inserting in mould . > Display the work instruction.
>inprocess petroling inspection. ( IM/QA/05)

Incorrect mould opening >Mold Opening and Ejection squencing


> Mold Opening and Ejection squencing > FPA/LPA approval from the LQC team.
Mold Opening process , process (opens too fast, process validiate at the time every mold
Part Appearnce NG. / Part process not validiate at the time mold > regularly check the mold opening or Ejection
Ejection Squencing overpacked, erratic motion,
reject at Inspection.
5 Normal
setup on machine.
2 setup on machine.
squencing by the machine operator.
5 50 Nill
should be correct. etc.),Incorrect ejection > Skill level minimum 3 deputed operator
> Un trained machine Operator. > Training as per plan for operator / inspector.
sequencing, on machine.

Cavity/Material Mark./ Calender marking/ Cavity > Part marking check by prod. Supervisor
> Part marking missed in the mold. > Visually check the LQC team at the FPA / LPA
Date,Month & Year maring, Material Marking & Lot identify very defficulty , during mold load on machine visually.
6 Normal > Part marking damage during running 2 approval. 8 96 Nill
Insert Injection marking & HONDA Mark HONDA Marking miss or Appreance NG
production.
> Abnormality rule difned for any
> Abnormality handling rule define at shop floor.
Moulding / Cooling & must be availabe on part change skipped, abnormality raise during working.
60 FPA/LPA & Inprocess
Inspection
First Part Inspection and
Part Approval should not > Machine run the prod. After approval > FPA/LPA approval from the LQC team.
approval (Setting > Inspector not aware about the part
be skipped during Part rejected at customer from quality LQC team. > Inprocess inspection every 4 hours.
machine startup/ change
Approval)First piece validation
end / Line may suffer.
5 Normal Approval at the mold runing on machine. 2
> Minimum skill level 3 Inspector deputed > Training as per plan for operator / inspector.
5 50 Nill
skipped, Last piece validation > Inspector negligency during mold set up.
over. on machine. > M/c run as per production plan.
skipped.

>Machine not operate as per operation


standard, mould pin wear out. >Mould preventive maintenance as per
>Opeartor not trained decide frequency & check for cooling
Dimension should be as Dimensions Less /More / not Part Fitment NG 7 2
per specification as per Spec Functional Failure * process parameter not followed
Mould Temperature high due to wrong
channel descaling frequency.
>Machine run as per defined process
>Part check in inprocess
First part approval and PDI report.
5 70 Nill
looping of water pipeline or scaling in parameter
mould .

>Untrained manpower deployed for


6 Normal
inspection
2 >Manpower as per skill matrix >Operator initials tag on Bin after 100% inspection 8 96 Nill

6 Normal >WIS not clear to the operator 2 >Training of operator as per plan >Effectiveness monitoring of operator through test 8 96 Nill
Fitment Failure/Part will be
Inspection not done
rejected
5 Normal >Low illumination at inspection area 2 >Proper lighting at inspection table >Lux level monitoring on regular basis 7 70 Nill

>Appraiser variation high and NG part >Training of operators for inspection by


5 Normal
flown out.
2
limit samples
>Regular R&R study of operators 5 50 Nill

> Inspector check the part as per frequency defined.


Parts not checked at Part Rejected at customer > Part checked by Un trained inspector > Trained Inspector deputed on inspector > Part inspection frequency check by shift engineer.
determined frequencies end
5 Normal
and not aware about frequency.
3
minimum Skill level 3. > Dock / Product audit done as per plan.
6 90 Nill
Visual Inspection as
70 Final Inspection per specifications
> Training of inspector as per plan.

> Untrained inspector deputed for part > Trained Inspector deputed on inspector
> Inspector check the part as per frequency defined.
Parts not measured at the right Inspection. minimum Skill level 3.
Part Rejected at customer > Dock / Product audit done as per plan.
location & not checked with
end
5 Normal > Receiving gauge identification not 2 > Receiving gauge kept define location.
> Training of inspector as per plan.
7 70 Nill
right gauge , avaialbe. > Identification tag of every gauge/Jig
> validation of gauges as per plan.
> Gauge kept on wrong palaces. available.

Part free from appreance


defect i.e. dent , scratches ,
Burn Mark Flash ,Sink Mark , >'> Trained Inspector deputed on inspector > Inspector check the part as per frequency defined.
Warpage ,tool depression Part Rejected at customer > Part inspected by un trained inspector. minimum Skill level 3. > Dock / Product audit done as per plan.
mark , flow mark , Oil mark , end.
6 Normal
> Part Inspection not done as per WI
2
> Part check by Inspector as per WI > Training of inspector as per plan.
7 84 Nill
Burr , Strain , displayed. > Final Inspection WI displayed at work instruction.
Deformation ,discoloration
etc .
C O D D
S L C E R Resp. & Target S O E R
Process function Potential Cause (s) Mechanism(s) Current Process Control Recommended Action C
Requirement Potential Failure Mode Potential Effect Of Failure E A C Current Process Control Detection T P Completion E T P
Requirement of Failure Prevention Action(s) Taken C
V S U E N Date V E N
S R C U C
R
>Identical and single type of bins used for >PDI Inspection is in place.
Wrong Bin / Box Used 5 Normal >Packing standard not followed 2
all shafts > packing as per define standard.
5 50 Nill

>Work Order Provided and tag attached with checked lot


Mix up of Part Cstomer line may 5 Normal >No / Improper tag identification 2 > Operator training
and QA stamp on Bins/Box.
7 70 Nill
suffer/decreased line speed
>Dock audit as per plan.
>Identification tags not available Similar or >Identification system in place.
Wrong Part Pack 5 Normal
identical part nos.operator skill.
2
Packing standards available.
> Packing standard followed. 6 60 Nill
> Training as per plan.

> Part packed as per define packing


Part Rejected at customer > Part packed by untrained operator. stadanrd. > Part Packing reverify by quality inspector and paste
Dirty part packed
end
6 Normal
> Packing standard not followed.
2
> Part checked by Operator before packing identfication tag on Box.
8 96 Nill
in BOX/BIN.

80 Packing & Labeling As per Packing Standard > Part Quantity packed as per define
Cstomer line may > Part packed by untrained operator. packing standard. > Part Packing reverify by quality inspector and paste
Less / Excess quantity.
suffer/decreased line speed
5 Normal
> Packing standard not followed.
2
> Trainined operator deputed on material identfication tag on Box.
8 80 Nill
packing stage.

> Part packed by untrained operator.


Part Rejected at customer > Packing standard not followed. > Material Packed as define packing > Part Packing reverify by quality inspector and paste
No Foam bag used
end
6 Normal
> Foam sheet not availabe in stock for
2
standard by operator. identfication tag on Box.
8 96 Nill
packing.

> Part packed by untrained operator.


Part Rejected at customer > Material Packed as define packing > Part Packing reverify by quality inspector and paste
Partition tray not in places
end
6 Normal > Packing standard not followed. 2
standard by operator. identfication tag on Box.
8 96 Nill
> Partition of tray not availabe in stock.

Internal packaging incorrectly Cstomer line may > Part packed by untrained operator. > Material Packed as define packing > Part Packing reverify by quality inspector and paste
placed suffer/decreased line speed
5 Normal
> Packing standard not followed.
2
standard by operator. identfication tag on Box.
8 80 Nill

>Improper packing and covering of >Proper packing & storing of RM in >All material is checked by supervisior during
Storing & issuing Dust may be come 4 Normal
material
2
storage area receiving of material
7 56 Nill
Cstomer line may
material in good
suffer/decreased line speed
condition. Material may damage during >Improper identification and storage
handling
5 Normal
location
2 >Identification through status tag. >100% visual inspection during storage 8 80 Nill

Pre Dispatch
90 >Machine not operate as per operation
Inspection (PDI) standard, mould pin wear out. >Mould preventive maintenance as per
Dimension should be as >Opeartor not trained decide frequency & check for cooling >Part check in inprocess
Dimensions Less / More / not Part Fitment NG 7 2
per specification / Insp.
Std
as per Spec / Std Functional Failure * process parameter not followed
Mould Temperature high due to wrong
channel descaling frequency.
>Machine run as per defined process
>First/Last part approval and PDI report.
> Training to operator as per plan.
5 70 Nill
looping of water pipeline or scaling in parameter > Machine parameter monitoring Every 4 Hours
mould .

>Non availability of Pre-Dispatch >PDIR inspection standards in place


Inspect PDI material as >Material is checked as per Pre -Dispatch Inspection
per Standard
Passing wrong material Material Danage 5 Normal inspection standards 2 Identification W.I available. Sampling Plan
standard & tagged with appropriate label.
6 60 Nill
Material not identified properly. available
100 Material Storage
Mixing of material with > Operator not aware about FIFO.
Material storage as per > Trained Operator at storage location. > Store Engineer verify material on daily basis.
FIFO system
FIFO not followed. different same model 6 Normal > FIFO not followed by Operator. 2
> FIFO WI displayed at location. > Training to store person as per plan.
7 84 Nill
material > FIFO borad not maintened.

>Wrong labeling >Part wise Packing standard available.


>Material issued in FIFO order as per Identification
Identification tag correct. Identification NG 5 Normal > FIFO system not followed. 2 >Material identification system available.
tags.
5 50 Nill
>Customer dissatisfaction. >FIFO System in place

Quantity as per shipment >WI for keeping desired number of parts in


plan
Less / Excess quantity. 5 Normal >Packing standard not followed 2
the bin (as packing standard)
>Packing standard / PDI Inspection as per standard. 7 70 Nill
Cstomer line may
110 Dispatch suffer/decreased line speed > Part packing reverify by the dispatch >packing check by the store supervisor during
No Packaging damage Damage packing 5 Normal >Packing standard not followed 2
enginner visually during shipment shipment.
7 70 Nill

Invoice of material as per > Shipment plan not followed. > Plan review throught the SAP/mail and than after
shipment plan
Wrong inivoice 5 Normal
> Wrong shipment plan followed.
2 > Dispatch the part as per plan
make the invoice for material shipment.
5 50 Nill

No mix up parts with Route card system followed throughout the >PDI Inspection is in place.
other model parts
Model mix-up 5 Normal >Material descipline at FG 2
process > Daily production report.
5 50 Nill

RPN Action: The action will be initiated for the RPN value ≥ 100 or Top 3 RPN values and if the severity 8 or above.

PREPARED BY: Vishwnath Singh CHECKED BY : Sukhbir singh APPROVED BY: Mr. Abhishek Goyal