PFMEA_LUMAX
PFMEA_LUMAX
> Minimum Skill level 3 inspector deputed > inspection done as per inspection standard at IQC
Insert Thread Miss/ >Part not check as per drawing
Part rejected at customer on receipt stage. level.
Profile should not be Insert Thread Miss / Damage
end / Line may suffer.
7 Normal requirements. 2
> Part check as per inspection plan and > Minimun Skill Level 3 Inspector on receipt stage.
5 70 Nill
Damage > Un Skilled Inspector .
standard. > Followed the sampling plan ( IM/QA/09)
>Identified visual ,Fitment & Functional >Specific inspection standard >As per testing standard & Supplier PDI report.
Dimension should be as Part not assembled at defect not considered in inspection check >Trained Inspector > Material inspection as per inspection report.(
per specification
Dimensions not as per drawing
assembly process
7 Normal
sheet.
2
>Approved supplier & PPAP Conduct at IM/QA/01)
5 70 Nill
> MTC not as per standard. suppleir end. > Receipt Inspection as per Inspection Std.
Mixing of material with > Operator not aware about FIFO. > Store Engineer verify material on daily basis.
Material storage as per > Trained Operator at storage location.
FIFO system
FIFO not followed. different same grade 6 Normal > FIFO not followed by Operator. 2
> FIFO WI displayed at location.
> Training to store person as per plan. 7 84 Nill
Storage of raw material > FIFO borad not maintened. > FIFO controlled by SAP.
30 &
material & Brass
30A
Insert M2.6 Material / chemical self > Self life of material / chemical not > Material self line monitor as per
life should not be expired
Material self life expired. parts will be scrapped 7 Normal
mainten on daily basis.
2
mentioned on checmical drums/bottels.
> Self life control through the SAP system. 3 42 Nill
Raw Material & Brass >No location defined for material > Material as per planning sheet.
> Store person verify material bag tag with planning
40 & Correct material issue to Wrong material issurance from identification. > SAP grade and material bag Tag match.
Insert M2.6 Issue production. RM store
parts will be scrapped 7 Normal
>Identification tag wrong on bags.
2
> material issue through SAP reservation
sheet. 4 56 Nill
40A >RM issued as per SAP reservation Slip.
Prod. > material reservation slip not followed. Slip.
6 Normal >Mould life over 2 >Shot monitoring and total shot decide >Mould history card maintain on daily basis. 6 72 Nill
Cavity/Material Mark./ Calender marking/ Cavity > Part marking check by prod. Supervisor
> Part marking missed in the mold. > Visually check the LQC team at the FPA / LPA
Date,Month & Year maring, Material Marking & Lot identify very defficulty , during mold load on machine visually.
6 Normal > Part marking damage during running 2 approval. 8 96 Nill
Insert Injection marking & HONDA Mark HONDA Marking miss or Appreance NG
production.
> Abnormality rule difned for any
> Abnormality handling rule define at shop floor.
Moulding / Cooling & must be availabe on part change skipped, abnormality raise during working.
60 FPA/LPA & Inprocess
Inspection
First Part Inspection and
Part Approval should not > Machine run the prod. After approval > FPA/LPA approval from the LQC team.
approval (Setting > Inspector not aware about the part
be skipped during Part rejected at customer from quality LQC team. > Inprocess inspection every 4 hours.
machine startup/ change
Approval)First piece validation
end / Line may suffer.
5 Normal Approval at the mold runing on machine. 2
> Minimum skill level 3 Inspector deputed > Training as per plan for operator / inspector.
5 50 Nill
skipped, Last piece validation > Inspector negligency during mold set up.
over. on machine. > M/c run as per production plan.
skipped.
6 Normal >WIS not clear to the operator 2 >Training of operator as per plan >Effectiveness monitoring of operator through test 8 96 Nill
Fitment Failure/Part will be
Inspection not done
rejected
5 Normal >Low illumination at inspection area 2 >Proper lighting at inspection table >Lux level monitoring on regular basis 7 70 Nill
> Untrained inspector deputed for part > Trained Inspector deputed on inspector
> Inspector check the part as per frequency defined.
Parts not measured at the right Inspection. minimum Skill level 3.
Part Rejected at customer > Dock / Product audit done as per plan.
location & not checked with
end
5 Normal > Receiving gauge identification not 2 > Receiving gauge kept define location.
> Training of inspector as per plan.
7 70 Nill
right gauge , avaialbe. > Identification tag of every gauge/Jig
> validation of gauges as per plan.
> Gauge kept on wrong palaces. available.
80 Packing & Labeling As per Packing Standard > Part Quantity packed as per define
Cstomer line may > Part packed by untrained operator. packing standard. > Part Packing reverify by quality inspector and paste
Less / Excess quantity.
suffer/decreased line speed
5 Normal
> Packing standard not followed.
2
> Trainined operator deputed on material identfication tag on Box.
8 80 Nill
packing stage.
Internal packaging incorrectly Cstomer line may > Part packed by untrained operator. > Material Packed as define packing > Part Packing reverify by quality inspector and paste
placed suffer/decreased line speed
5 Normal
> Packing standard not followed.
2
standard by operator. identfication tag on Box.
8 80 Nill
>Improper packing and covering of >Proper packing & storing of RM in >All material is checked by supervisior during
Storing & issuing Dust may be come 4 Normal
material
2
storage area receiving of material
7 56 Nill
Cstomer line may
material in good
suffer/decreased line speed
condition. Material may damage during >Improper identification and storage
handling
5 Normal
location
2 >Identification through status tag. >100% visual inspection during storage 8 80 Nill
Pre Dispatch
90 >Machine not operate as per operation
Inspection (PDI) standard, mould pin wear out. >Mould preventive maintenance as per
Dimension should be as >Opeartor not trained decide frequency & check for cooling >Part check in inprocess
Dimensions Less / More / not Part Fitment NG 7 2
per specification / Insp.
Std
as per Spec / Std Functional Failure * process parameter not followed
Mould Temperature high due to wrong
channel descaling frequency.
>Machine run as per defined process
>First/Last part approval and PDI report.
> Training to operator as per plan.
5 70 Nill
looping of water pipeline or scaling in parameter > Machine parameter monitoring Every 4 Hours
mould .
Invoice of material as per > Shipment plan not followed. > Plan review throught the SAP/mail and than after
shipment plan
Wrong inivoice 5 Normal
> Wrong shipment plan followed.
2 > Dispatch the part as per plan
make the invoice for material shipment.
5 50 Nill
No mix up parts with Route card system followed throughout the >PDI Inspection is in place.
other model parts
Model mix-up 5 Normal >Material descipline at FG 2
process > Daily production report.
5 50 Nill
RPN Action: The action will be initiated for the RPN value ≥ 100 or Top 3 RPN values and if the severity 8 or above.
PREPARED BY: Vishwnath Singh CHECKED BY : Sukhbir singh APPROVED BY: Mr. Abhishek Goyal