Building Systems Design
Building Systems Design
C
12000 12000
2 2
A-02 A-02
75 B 75 75 B 875 75
A-03 A-03
C1 C1 C1 C1 C1 C1
D1
BREAK
2900
2900
EXECUTIVE
ROOM
3625
3550
OFFICE
FILE ROOM ADMIN ROOM
D1 D2 D1 D1
W1 W2
D1
C1 C1 C1 C1 C1 C1
900
900
UP DOWN
A A
3500
A-03 A-03
D1
C1 C1 C1 C1 C1 C1
4 4
D1
A-02 A-02
9600
18000
18000
3 3
CONFERENCE ROOM
A-02 A-02
W1
6100
A
A-01
A-03 A
C1 C1 WAREHOUSE AREA C1 A-03 C1 C1 WAREHOUSE AREA C1
SALES LOBBY
Sheet
W1
W1
900
1:1000
D1
W2
Project
Scale
C1 C1 C1 C1 C1 C1
Date
4775
3875
C1 C1 C1 C1 C1 C1
RAMP RAMP
Contents
B B
A-03 A-03
1 1
PROPOSED WAREHOUSE
A-02 A-02
Project Name
A-01 SCALE 1:1000 A-01 SCALE 1:1000
PRE-ENGINEERED PRE-ENGINEERED
TOP OF ROOF METAL CLADDING METAL CLADDING TOP OF ROOF
DOWNSPOUT (TYP)
2.20
2.20
DOWNSPOUT (TYP)
2.40
7.80 m
7.80 m
SECOND FLOOR LINE SECOND FLOOR LINE
1
3.00
3.00
A-05
0.20
0.20
A-02
PRE-ENGINEERED PRE-ENGINEERED
1.50 x 1.00m JALOUSIE
Sheet
RIB-TYPE ROOFING RIB-TYPE ROOFING
WINDOW w/ SCREEN
(GA.20) (GA.20)
1:1000
2.20
2.20
ELEV 5.40 - BOT. OF CEILING
Project
Scale
ELEV 5.10 - TOP OF WINDOW
Date
2.40
2.40
ELEV 4.10 - BOT. OF WINDOW
7.80 m
7.80 m
ELEV 3.00 - 2F TOP OF SLAB
EXTERIOR ELEVATIONS
ELEV 2.10 - TOP OF WINDOW
ELEV 1.60 - BOT. OF WINDOW
3.00
3.00
0.20
0.20
ELEV 0.00 - GF TOP OF SLAB
Contents
PRE-ENGINEERED PRE-ENGINEERED
0.50 x 0.50m
METAL CLADDING
3 RIGHT SIDE ELEVATION JALOUSIE WINDOW 2
A-05
4 LEFT SIDE ELEVATION METAL CLADDING
PROPOSED WAREHOUSE
Project Name
C1 C1 C1 C1 C1 C1
VENT
805
805
BREAK BREAK
ROOM ROOM Ø 2in. VENT THRU
920
920
FILE ROOM FILE ROOM
PIPE
575
575
D2 D2 D1 D2
0.30m
D2 D1
C1 C1 C1 C1 C1 C1
UP UP
A A
0.80m
KS
C1 C1 C1 C1 C1 C1
FD C1
SEPTIC TANK
C1 C1 WAREHOUSE AREA C1 C1 C1 WAREHOUSE AREA C1
SALES LOBBY SALES LOBBY
Ø 4in. CLEAN OUT
WC
W1
W1
LAV
D1 D1
D2 CO
0.30m
C1 C1 C1 C1 C1 C1
CO
0.40m
UP UP
C1 C1 C1 C1 C1 C1
RAMP
WATER METER
RAMP
C1
IC
PT ISOMETRIC PLAN
1 WATERLINE LAYOUT 2 SANITARY LINE PLAN Ø 4in. SE 3
SANITARY TO P-01
<-
P-01 SCALE 1:1000 P-01 SCALE 1:1000 SCALE 1:1000
PIPE
P-01
Sheet
500mmx500mm MANHOLE COVER
500 WITH Ø10MM LIFT
MANHOLE (TYP) 0.5"Ø ANGLE 0.5"Ø ANGLE
VENT THRU
VALVE VALVE
BATHROOM WALL
100
1:1000
FAUCET ←AIRVENT
1"Ø PPR LAVATORY
1"Ø PPR 1"Ø PPR P-TRAP
←OUTLET PVC PIPE
PVC PIPE PVC PIPE
←INLET
Project
800
Scale
1600
1400
Date
MANHOLE
400
300
MANHOLE
Ø12 @
TOP & BOTTOM
200MM OC
BARS
F.F.L. F.F.L. F.F.L.
FLOOR DRAIN SQUARE
STRAINER W/
SLOT OPENING SHOWER DRAIN
STRAINER BODY
100
P-TRAP
3"x2" PVC WYE REDUCER 4"x3" WATER 3"x3" PVC WYE 3"x2" PVC WYE REDUCER
WATERLINE LAYOUT
CLEAN-OUT
Contents
2"Ø PVC P-TRAP ELEV -200 PVC P-TRAP
NAT. GRADE LINE PIPE BOTTOM
400
100 CLEANING EYE F.F.L.
300 ←OUTLET AIR SPACE ←INLET
ELEV -400
2"Ø PVC PIPE
PIPE BOTTOM
2"Ø PVC
ELBOW 45°
850
PROPOSED WAREHOUSE
1800
LEACHING DIGESTIVE
10MMØ HORIZ. BARS CHAMBER CHAMBER
100MM
SPACED @ EVERY 3RD CHB WALL
COURSE OF CHB
Project Name
4 SEPTIC TANK DETAILS
P-01 SCALE 1:1000