0% found this document useful (0 votes)
2 views

STRUCTURE04

The document outlines the design specifications for a wood truss system and associated structural elements, adhering to ASCE 7-22 and Florida Building Code 2020. It includes details on materials, construction methods, and general notes to ensure compliance with local regulations and best practices. The project involves a retail building renovation located at 2901 E Busch Blvd, Tampa, FL.

Uploaded by

AMIR Badillo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views

STRUCTURE04

The document outlines the design specifications for a wood truss system and associated structural elements, adhering to ASCE 7-22 and Florida Building Code 2020. It includes details on materials, construction methods, and general notes to ensure compliance with local regulations and best practices. The project involves a retail building renovation located at 2901 E Busch Blvd, Tampa, FL.

Uploaded by

AMIR Badillo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

BETA

DESING
WOOD TRUSS SYSTEM SHALL BE
7 6 DESIGNED ACCORDING TO ASCE 7-22
04
ALL TRUSS MEMBERS SHALL BE YELLOW
04
AND FLORIDA BUILDING CODE 2020.
PINE WITH A MINIMUM ELASTIC MODULUS
OF 1,400,000 PSI.
Structure roof plan
12' - 0"
PERMIT:

TRUSSES SHALL BE SIMPLY SUPPORTED


WITH A MAXIMUM SPAN OF 28'-1.2".

8" CMU WALL, 9 GAGE 304SS 8" CMU WALL, 9 GAGE 304SS
LADDER WIRE EVERY LADDER WIRE EVERY
2ND ROW., #5 REBAR @ 48" 2ND ROW., #5 REBAR @ 48"
O.C. MAX., GROUTED O.C. MAX., GROUTED
CELLS 4000 PSI. CELLS 4000 PSI.
ALL SIDES OF OPENINGS ALL SIDES OF OPENINGS
AND ALL CORNERS AND ALL CORNERS

#5 REBAR @ 48" O.C. MAX., 5 #5 REBAR @ 48" O.C. MAX.,


GROUTED GROUTED
CELLS 4000 PSI. 04 CELLS 4000 PSI.
ALL SIDES OF OPENINGS ALL SIDES OF OPENINGS
SAWCUT AND REMOVE EXISTING SAWCUT AND REMOVE EXISTING
AND ALL CORNERS AND ALL CORNERS
CONCRETE SLAB FOR NEW CONCRETE SLAB FOR NEW
FOOTING INSTALLATION 8"CMU STEM WALL GROUT WALL SOLID 8"CMU STEM WALL GROUT WALL SOLID FOOTING INSTALLATION
(1) #5 AT OPENING, CORNERS, AND 48" O.C. MAX. (1) #5 AT OPENING, CORNERS, AND 48" O.C. MAX.
9 GAGE 304SS LADDER WIRE EVERY 2ND ROW., 9 GAGE 304SS LADDER WIRE EVERY 2ND ROW.,
First floor
0' - 0"
Fundation plan
-1' - 4"

1'x2' FOOTING 3000 PSI CONCRETE, 1'x2' FOOTING 3000 PSI CONCRETE,
EXISTING CONCRETE SLAB 3" COVER MIN 3" COVER MIN EXISTING CONCRETE SLAB

Section B
1 3/8" = 1'-0"

8" CMU WALL, 9 GAGE 304SS


LADDER WIRE EVERY
2ND ROW., #5 REBAR @ 48"
O.C. MAX., GROUTED
CELLS 4000 PSI.
ALL SIDES OF OPENINGS
AND ALL CORNERS 2% STAMP
WOOD TRUSSES
Structure roof plan
12' - 0"

8" CMU WALL 9 GAGE 304SS LADDER WIRE EVERY


2ND ROW.

#5 REBAR @ 48" O.C. MAX., #5 REBAR @ 48" O.C. MAX.,


GROUTED CELLS 4000 PSI. GROUTED CELLS 4000 PSI.
ALL SIDES OF OPENINGS ALL SIDES OF OPENINGS
AND ALL CORNERS AND ALL CORNERS

Structure wall detail


First floor
3 1 1/2" = 1'-0"
0' - 0"
Fundation plan
-1' - 4" PERMIT APPROVAL

FOOTING 1'x2' 3000 PSI CONCRETE, 8"CMU STEM WALL GROUT WALL SOLID #5 REBAR @ 48" O.C. MAX., WOOD STRUSS WOOD STRUSS

DESING
3" COVER MIN (1) #5 AT OPENING, CORNERS, AND 48" O.C. MAX. GROUTED
9 GAGE 304SS LADDER WIRE EVERY 2ND ROW., CELLS 4000 PSI.
ALL SIDES OF OPENINGS

RETAIL BUILDING
AND ALL CORNERS

Section A

RENOVATION
2901 E Busch Blvd
2

Tampa, FL 33612
3/8" = 1'-0"

BETA
#5 REBAR @ 48" O.C. MAX., GROUTED
2' - 6 1/2" 2' - 6 1/2" 2' - 6 1/2" CELLS 4000 PSI.
ALL SIDES OF OPENINGS AND
ALL CORNERS
TOP CHORD, VERTICALS, AND
DIAGONALS: 2x4 SYP #2 OR BETTER

1'x2' FOOTING 3000 PSI CONCRETE,


3" COVER MIN

(5) #5 CONT.

#5 @ 16" O.C.
1' - 11"

First floor HU2.1/11 w/ (24) 1/4" x 2-1/4" Screws HU2.1/11 w/ (24) 1/4" x 2-1/4" Screws
0' - 0"
FILL CMU CELL SOLID
WITH MORTAR

NEW WALL

ALL TRUSS JOINTS TO BE FASTENED USING SIMPSON STRONG-TIE AS901016HSB TRUSS PLATES
BOTTOM CHORD: 2X6" OR APPROVED EQUIVALENT. PLATES MUST BE INSTALLED USING HYDRAULIC PRESS OR
ROLLER PRESS AS PER MANUFACTURER’S SPECIFICATIONS AND FASTEN ALL 2x4 MEMBERS
W/(2) 16d COMMON NAILS AT EACH CONNECTION.

Struss detail Footing rebar detail Truss conecion detail


7 1 1/2" = 1'-0"
5 1 1/2" = 1'-0"
6 1 1/2" = 1'-0"

GENERAL NOTES • A LICENSED LAND SURVEYOR OR CIVIL ENGINEER SHALL ESTABLISH BUILDING CORNERS, STRUCTURAL COLUMNS, POSTS, GRADES AND OTHER IMPROVEMENTS IN THE FIELD. MARK DATE DESCRIPTION
• MANUFACTURED MATERIALS, EQUIPMENT, ETC., SHALL BE INSTALLED PER MANUFACTURES RECOMMENDATIONS, INSTRUCTIONS AND APPLICABLE ICBO REPORTS UNLESS
• ALL CONSTRUCTION SHALL COMPLY WITH THE 2023 FBC, IECC AND ALL LOCAL CODES AND ORDINANCES, AND ALL OTHER STATE RULES AND REGULATIONS, AS WELL AS ALL OTHERWISE NOTED OR INSTRUCTED. ISSUE:
CITY, COUNTY AND FEDERAL RULES, REGULATIONS, ORDINANCES, SAFETY LAWS AND SANITARY ORDINANCES. IF THE DRAWINGS AND/OR THE SPECIFICATIONS ARE AT • ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE BEST PRACTICES OF THE VARIOUS TRADES INVOLVED. ALL WORK SHALL BE ERECTED AND INSTALLED PLUMB,
VARIANCE THEREWITH, THE CONTRACTOR SHALL SO NOTIFY THE ARCHITECT IMMEDIATELY. LEVEL, SQUARE AND TRUE IN PROPER ALIGNMENT. PROJECT NO: -
• SLOPE GRADE AWAY FROM STRUCTURE A MIN. OF 5% FOR 5 FEET. • THE CONTRACTOR SHALL NOT PROCEED WITH ANY ADDITIONAL WORK REQUIRING ADDITIONAL COMPENSATION BEYOND THE CONTRACT AMOUNT WITHOUT WRITTEN
• ROOF AND DECK DOWNSPOUTS, FOUNDATION PERIMETER DRAIN LINE, DRIVEWAY AND PATIOS SHALL BE CONNECTED TO A SUBTERRANEAN SYSTEM WHERE REQUIRED BY AUTHORIZATION FROM THE OWNER. FAILURE TO OBTAIN AUTHORIZATION SHALL INVALIDATE ANY CLAIM FOR EXTRA COMPENSATION. DATE: 02/17/2025
CURRENT STORM DRAINAGE ORDINANCE. • THE CONTRACTOR SHALL BE RESPONSIBLE FOR DISTRIBUTION OF THE DRAWINGS AND SPECIFICATIONS TO ALL TRADES UNDER HIS JURISDICTION.
• PRIOR TO INSPECTION OF ROOF FRAMING, ENGINEERED CALCULATIONS FOR THE MANUFACTURED ROOF TRUSSES, AS PER PLAN, WILL BE SUBMITTED TO THE BUILDING • SUBSTITUTIONS, REVISIONS OR CHANGES MUST HAVE PRIOR WRITTEN APPROVAL BY THE THE ARCHITECT. DRAWN BY: BRAYAN B.
DEPARTMENT FOR APPROVAL. • NO WORK DEFECTIVE IN CONSTRUCTION OR QUALITY OR DEFICIENT IN ANY REQUIREMENT OF THE DRAWINGS OR NOTES WILL BE ACCEPTABLE AS A CONSEQUENCE OF THE
• THE GENERAL NOTES ARE COMPLEMENTARY TO THE GENERAL CONDITIONS AND SPECIFICATIONS. SHOULD CONFLICTS OCCUR, THEY SHALL BE BROUGHT TO THE ARCHITECT'S ARCHITECTS FAILURE TO DISCOVER OR POINT OUT DEFECTS OR DEFICIENCIES DURING CONSTRUCTION. DEFECTIVE WORK REVEALED WITH IN THE TIME REQUIRED BY
ATTENTION. GUARANTEES SHALL BE REPLACED BY WORK CONFORMING WITH THE INTENT OF THE CONTRACT DOCUMENTS. NO PAYMENT, EITHER PARTIAL OR FINAL, SHALL BE CONSTRUED
CHECKED BY: KEVIN BERNAL
• SHOULD CONFLICTS OCCUR BETWEEN THE DRAWINGS AND SPECIFICATIONS, DRAWINGS SHALL GOVERN IN MATTERS OF DIMENSION OR QUANTITY; SPECIFICATIONS SHALL AS AN ACCEPTANCE OF DEFECTIVE WORK OR IMPROPER MATERIALS.
GOVERN IN MATTERS OF MATERIALS, INSTALLATION OR FINISHES. • IN THE EVENT CERTAIN FEATURES OF CONSTRUCTION ARE NOT FULLY SHOWN ON THE DRAWINGS OR CALLED FOR IN THE NOTES OR SPECIFICATIONS, THEN THE COPYRIGHT: HB DESIGN AND
• DURING CONSTRUCTION, REPORT ALL DISCREPANCIES AND/OR CONFLICTS IN THE DRAWINGS TO THE ARCHITECT IMMEDIATELY. CONSTRUCTION SHALL BE SIMILAR AND OF THE SAME CHARACTER AS SIMILAR CONDITIONS THAT ARE SHOWN OR CALLED FOR. INGINEERING
• VERTICAL AND HORIZONTAL FIRE BLOCKING SHALL CONFORM TO FBC R608.2. • THE CONTRACTOR SHALL DO ALL WORK IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS APPROVED BY THE BUILDING OFFICIAL. THE APPROVED DRAWINGS AND
• THE CONTRACTOR SHALL FURNISH AND INSTALL ALL MATERIALS AND LABOR REQUIRED TO COMPLETE THE WORK. EXCLUSION OF AN ITEM OR ITEMS DOES NOT IMPLY OMISSION. SPECIFICATIONS SHALL NOT BE CHANGED OR MODIFIED WITHOUT THE APPROVAL OF THE BUILDING OFFICIAL. SHEET TITLE:
THE CONTRACTOR'S RESPONSIBILITY IS TO NOTIFY THE ARCHITEC T & OWNER OF THESE OMISSIONS PRIOR TO THE SUBMISSION OF BIDS. THE CONTRACTOR SHALL COMPLY • THE CONTRACTOR SHALL NOTIFY THE OWNER UPON COMPLETION OF THE WORK. AT THAT TIME THE OWNER SHALL COMPLETE A "PUNCH LIST" OF CORRECTIONS. THE OWNERS
WITH THE SPIRIT AND INTENT OF THESE DOCUMENTS AND SHALL COMPLETE THE WORK SATISFACTORILY AND IN A MANNER ACCEPTABLE TO THE OWNER. THESE DOCUMENTS FINAL ACCEPTANCE WILL BE CAUSE FOR FINAL PAYMENT UNDER TERMS OF THE OWNER/CONTRACTOR AGREEMENT. SECTION A
ILLUSTRATE THE MINIMUM STANDARDS OF CONSTRUCTION AND THE CONTRACTOR SHALL MEET OR EXCEED NORMAL CONSTRUCTION TECHNIQUES AND STANDARDS FOR A • THE PROJECT SHALL BE LEFT COMPLETELY CLEAN AND CLEAR TO THE SATISFACTION OF THE OWNER. SECTION B
BUILDING OF THIS TYPE. • ALL WORK AND MATERIAL SHALL BE NEW AND UNUSED AND OF THE HIGHEST QUALITY IN EVERY RESPECT UNLESS OTHERWISE AUTHORIZED BY THE ARCHITECT. VICINITY MAP DETAILS
• NEITHER THE ARCHITECT, THE ENGINEER, OR THE OWNER SHALL BE RESPONSIBLE FOR THE CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES OF • CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING FINAL CITY APPROVALS AND A CERTIFICATE OF OCCUPANCY.
THE CONTRACTOR; SAFETY PRECAUTIONS AND PROGRAMS OF CONTRACTOR; THE ACTS OR OMISSIONS OF THE CONTRACTOR; OR THE FAILURE OF THE CONTRACTOR TO CARRY
OUT THE WORK IN ACCORDANCE WITH THE DRAWINGS OR SPECIFICATIONS. DRAWING SHEET NO:
• VERIFY DIMENSIONS, GRADES, ELEVATIONS AND CRITICAL LOCATIONS, SUCH AS STRUCTURAL SUPPORTS, BEFORE COMMENCING WORK AFFECTED BY THEM. THE CONTRACTOR

S1-04
SHALL REPORT ANY DISCREPANCIES TO THE ARCHITECT.
• THE CONTRACTOR SHALL THOROUGHLY REVIEW THE DRAWINGS, SPECIFICATIONS AND EXISTING SITE CONDITIONS AND NOTIFY THE ARCHITECT OF ANY DISCREPANCIES,