OFFER FOR INDOOR
DISTRIBUTION
Capacity-400 KVA
SUBMIT TO:
OFFICE:HOUSE#10(1stfloor),ROAD#12,NIKUNJA-2,DHAKA-1229
PROJECT: IMRAN HOSSAIN GONG
19/6/A,WEST MANIKDI NAMAPARA,DHAKA CANTT-1206
SUBMIT ON: 05 NOVEMBER 2024.
SUBMITED BY:
SHELTER POWER ENGINEERING.
(A Sister Concern of SAFE POWER ELECTRIC COMPANY)
Head Office: Plot#73,Bonorupa,Khilkhet,Dhaka-1229
Corporate Office:328/3,West Manikdi,Dhaka Cantoment,Dhaka-1206
Side Office:Hazi Moslim Uddin Plaza,2nd Floor,Sas More,Mymensingh.
Mobile: 01911-276-461,
Web: www.shelterpowerengineering.com
E-mail: [email protected]
05-11-2024
To
OFFICE:HOUSE#10(1st floor),ROAD#12,NIKUNJA-2,DHAKA-1229
PROJECT: IMRAN HOSSAIN GONG
19/6/A,WEST MANIKDI NAMAPARA,DHAKA CANTT-1206
Subject: Quotation for Supply, Installation, Testing & Commissioning of 400 KVA, 11/0.415kV,
Electrical Sub-station Equipment.
Dear Sir,
Thank you very much for your interest in Shelter Power Engineering. for the above subject and are
pleased to submit our QUOTATION for your kind consideration:
A. Equipment Part:
Sl. Description Unit Qty Unit Price Total Price
no
01 400 KVA Transformer No’s 01 7,60,000.00 7,60,000.00
03 LT Switcher gear (630Amp) No’s 01 2,40,000.00 2,40,000.00
04 PFI Plant (240KVAR) No’s 01 2,20,000.00 2,20,000.00
05 HT Switchgear(630A) No’s 01 2,30,000.00 2,30,000.00
05 Drop Out Fuse (11KV) Set 01 9,500.00 9,500.00
06 Lighting Arrester (11KV) Set 01 9,500.00 9,500.00
Earthing Complete Boring 100Ft With Sets 04 15,000.00 60,000.00
07
Copper Wire, Nut, bolt, etc.
Heat Shrink KIT( Cable kit Water Proof Set 06 2,000.00 12,000.00
08
Indoor & out door
Installation : Transformer, LT/HT Rack, No’s 01 15,000.00 15,000.00
LT ,Distribution Board, PFI Plant, Cable
09 Fitting, PVC Pipe Nut, Bolt Pib tape
&others Raw Materials etc.
10 Cable Laying With Road Cutting Job 01
11 Transport Job 01 6,000.00 6,000.00
Sub Total Amount (BDT)= 15,62,000/=
In Word: Fifteen Lac Sixty Two Thousand Taka Only.
B. Cable Part:
Sl.n Description Unit Qty Unit Price
Total Price
o
01 HT Cable 3x95rm XLPE Meter 10665.00/-
02 LT Cable 1x120rm NYY Meter 45 2270.00/-
03 LT Cable 1x120rm NYY Meter 20 2200.00/-
04 LT Cable 1x10rm BYA Coil 1 23,454.00/-
Sub Total Amount (BDT) =
C. Solar System.
Sl. Description Unit Qty Unit Price Total Price
no
01 Solar System WP 1000 80.00/- 80,000.00
Installation & Delivery Job Nill 0.00 0.00
1) Module warranty 25 years.
02
2) Inverter 2 years
3) Others Accessories 1 years
Sub Total Amount (BDT) =80,000.00/=
In Word: Eighty Thousand Taka Only.
D. Deposit for 400 KVA Sub-Station (as per DESCO requirement).
Sl. Description Unit Qty Unit Price Total Price
no
01 HT Meter No 01 3,80,000.00 3,80,000.00
02 Single Phase Pospaid Meter No. 45 2000.00 90,000.00
Deposit For Load demand KW 320 kw 1,000.00 3,20,000.00
03
Sub Total Amount (BDT) =7,90,000.00/=
In Word: Seven Lac Ninety Thousand Taka Only.
(If DESCO provides Prepaid meter,than the amount has to be paid
accordingly)
E. Miscellaneous.
Description Unit Qty Unit Price Total Price
01 Permission for Licensing Board(ELB) Job 01 80,000.00 80,000.00
02 File Movement for Quick Connection by Job 01 1,50,000.00 1,50,000.00
DESCO
Sub Total Amount (BDT) =2,30,000.00/=
In Word: Two Lac Thirty Thousand Taka Only.
Total= (A+0+C+D+E) =26,62,000 TK
2. Payment:
a. Payment: During work order pay as a advance -30%
b. After supply of Transformer, LT Switchgear & PFI Panel will be pay-30%
c. After ELB Certificate Submit -10%
d. After File Submit For DESCO-20%
e. After Line Connection-10%
4. Delivery: Delivery within 8-10 weeks after receipt of confirmed order along with
advance payment.
B). TECHNICAL PART:
1. Dropout Fuse:Supply and installation of best quality concern load supply authority
approved standard outdoor type 11 KV drop out fuse complete with mounting
accessories.
• Rated Voltage (Nominal) : 11kV
• Rated Maximum Voltage : 15 kV
• Rated Frequency : 50 Hz
• BIL : 95 kV
• Rated Current RMS : 60 A
• Interrupting Current RMS : 35 kA
• Withstand Test Voltage
• Dry, 1 Min. : 35 kV
• Wet, 10 sec. : 30 kV
Origin: Brazil.
5. Lightning Arrestor: Supply and installation of best quality concern load supply
authority approved standard outdoor type 11 KV 50 Hz. Lighting arrestor complete with
mounting accessories etc.
• Rated Voltage (Nominal) : 11 kV
• Rated System Voltage : 12 kV
• Frequency : 50 Hz
• Minimum Spark Over (RMS) : 14 kV
• Maximum Spark Over (RMS) : 40 kV
• Maximum Impulse Spark (Crest) : 45 kV
• BIL(Peak) : 75 kV
• Withstand Test Voltage
• Dry, 1 min. : 28 kV
• Wet, 10 Sec. : 24 kV
• Discharge 33 kV (Crest) : 5 kV
• Impulse Current Withstand : 55 kA
Origin: Brazil.
5.SWITCHGEAR WITH LBS
Sheet steel clad (14SWG), dust and vermin proof, and free standing floor mounting, indoor
type 11kV, 50HZ. HT Switchgear having 630A, hard drawn electrolytic copper Bus bars
1 No. 11kV, 630A, 50 HZ, 20kA breaking capacity Three phase Load break switch with
automatic tripping mechanism whenever any of the fuses blow.
Origin : ABB, Italy
2 Nos. 11 kV cast resin insulated, double pole, PT having ratio 11000/110V, class 0.5, 50VA.
Origin: Siemens, Germany.
3 Nos. Cast resin insulated, 11 KV dry type double core CT with Ratio: 30/5/5A, 1st core for
metering,
Origin: Siemens, Germany.
1 Nos. Ammeter having scale 0-30A.Digital
1 No. Voltmeter having scale 0-15 KV. Digital
3 No. Controlling Fuse 6A,
3 Nos. Including lamp.
1 No. Panel Heater.
6. Transformer: Shelter Power Engineering. make 3 Phase oil immersed, naturally air
cooled Transformer to VDE/IEC/DIN standard with oil level indicator, drain and filling
plug, lifting lugs, earthing terminals, with first filling of oil in Transformer.
Technical Data
Model : SPE400 T
Rated Capacity : 400 KVA
Rated Frequency : 50 Hz
Rated Voltage : 11 KV (Primary) and 400 V (Secondary)
Vector Group : DYN11
Ambient Temperature : 40°C
Temperature rise : in Oil: 60°C (Max) and in Coil: 65°C (Max)
Max. Service altitude : 1000 Meters
Installation : Indoor
No load losses : 785 W (±15% as per IEC)
Full load losses : 3220 W (±15% as per IEC)
Impedance : 4% (approx.)
Standard Accessories:
▪ High & low voltage bushings
▪ Off-circuit tap charger in 5 positions
▪ Lifting lugs
▪ Earthing terminals
▪ Filling plug
▪ Drain cock
▪ Buchholtz relay
▪ Silica gel breather
▪ Thermometer
Materials & Origin:
▪ Core: Kawasaki steel, Japan/Equivalent
▪ Insulation: Wiedmann, Switzerland/Equivalent
▪ Super Enameled Copper: RR Imperial/BRB, Bangladesh
▪ Oil: Savita, India/Equivalent
7. LT Switchgear: Shelter Power Engineering. make 16 SWG Sheet steel clad, powder
coated, free standing on floor, 400V, 50 Hz, indoor type Low Tension Switchgear with hard
drawn copper bus bars, TPN&E equipped with:
Incoming:
▪ 1 No 630 A, 65 KA, TP MCCB with adjustable thermal overload & magnetic
short circuit release.
▪ 1 Set of 320 A TPN & E hard drawn electrolytic copper bus bar
▪ 4 Nos. Current Transformer, ratio: 400/5A with suitable accuracy and burden
▪ 1 No. Digital Multifunction Meter.
Outgoing:
▪ 1 No. 320 A, 25 KA, (for PFI) TP MCCB with thermal overload & magnetic
short circuit release.
▪ 1 No. 63 A, 25 KA,TP MCCB with thermal overload & magnetic short circuit
release.
Brand & Origin:
▪ Breaker:,Hyundai-Korea
08. 240 KVAR AUTOMATIC PFI PLANT: Shelter Power Engineering. assembled
Sheet steel clad, dust and vermin proof, free standing, Powder Coated, floor mounting,
400V, 50 Hz, 240 KVAR Indoor type Automatic Power Factor Improvement Plant,
comprising.
▪ 4 Nos. 25 KVAR Bank of TP dry type Power Capacitors with built-in direct
discharge resister
▪ 4 No. 15 KVAR Bank of TP dry type Power Capacitors with built-in direct
discharge resiste
▪ 3 No. 12.5 KVAR Bank of TP dry type Power Capacitors with built-in direct
▪ discharge resiste
▪ 5 No. 10 KVAR Bank of TP dry type Power Capacitors with built-in direct
discharge resister
▪ 1 No. 2.5 KVAR Bank of TP dry type Power Capacitors with built-in direct
discharge resister (Direct)
▪ 1 No. 12 Stage Automatic Power Factor Correction Relay
▪ 11 Nos. TP Magnetic Contactors of adequate rating.
▪ 21 Nos. HRC Fuses with base of adequate rating.
▪ 11 Nos. Indicating Lamps
▪ 1 Set of Control fuses
Brand & Origin:
▪ Capacitor: Sujuki,Japan.
▪ Magnetic Contactor: Havells,India,Hyundai,Donga, Korea
▪ HRC fuse: Risesun, Taiwan
▪ PFC Relay: Mikro- Malaysia
10. Ear-thing for Substation:
Earthing Block:Supply, installation, testing and commissioning of 2 nos. copper
earthing block with required nos. of 1/4” hole for ECC connection, One for transformer
is neutral and another for all substations equipment’s ECC connections.
Earth Electrode: Supply and installation of 10 rft length 1.5” dia GI pipe buried up to
the depth of 100 rft as required in the damp soil including 4 SWG copper wire top &
bottom of GI pipe up to ground.
Earthing Lead:Supply and installation of earthing lead, 4 SWG copper wires (if
required) from earthing block to earth electrode.
11. Warranty: Six months from the date of delivery of equipment or 12 months from the
date of commissioning whichever is earlier. After expiry of the warranty period
maintenance can be carried out a nominal cost from our experience service team.
Yours sincerely,
S.M.Masum Billah Engr. Md.Moktadir Billah
CEO Manager
Shelter Power Engineering Shelter Power Engineering
Cell: 01911-169226 Cell: 01911-276461