CONTRACT AGREEMENT
And whereas owner & contractor has agreed to below condition for construction on
site no:-20, Assesment/khata/door no:-5332, revenue Sy no:- 3/3a & 3/4a,shettihalli
village, ward :-20(present election ward 31), Jayanagara south, near varadraja nursing
college, Tumakuru.
5. BED CONCRETE:-
a. For column footing: - 4 inch concrete with using mix ratio: - 1(cement):4(M-
sand):8(40mm jelly). width and length of concrete as per design
b. Below Size stone masonry
1. Main wall: - 4 inch concrete with using mix ratio: - 1(cement):4(M-
sand):8(40mm jelly).
Width: - 3feet.
2. Compound wall: - 4 inch concrete with using mix ratio: - 1(cement):4(M-
sand):8(40mm jelly).
Width: - 2feet.
6. PLINTH BEAM
Soil will filled with excavated soil and if there is shortage, RED soil will be filled.
Soil will filled with available soil and if there is shortage, RED soil will be filled
9 inch width for main walls and 4.5 inch width for partition walls will be provided
up to 10 feet roof.
Depth 6 inches and only for terrace slab water proof course/damp proof course of
JSW I Block will be provided.
16. STAIRS:-
17. STEEL:-
a. For sump Fe550D will be provided as per design. And RCC wall
thickness 6 inches. Up-to Rs.62 if market variation in price above the
agreed price, difference of cost has to be paid by owner.
b. For Beams and columns Fe-550D of JSW will be provided up to
Rs.64/- ,if market variation in price above the agreed price, difference
of cost has to be paid by owner.
18. CEMENT:-
The cost Up to Rs.350/- per bag will be provided and if any variation due to market
difference of cost has to paid by owner
Ultra tech for PPC for plastering and for structure OPC of 43 grade (owners’
choice and market availability).
19. SAND:-
a. M-sand will be used for construction.
b. P-sand will be used for Plastering.
Note:- As per the discussion held , owner agreed to provide River sand for plastering
from their side , it is estimated the 80 tonnes of P sand is required for plastering and the
amount at the rate of Rs.800/- per tonne approximately Rs.64,000/- will be refunded to
the owner from contractor after paying all the dues. The owner has to supply river sand
till completion of plastering and wastage charges after sieving will be paid by/ will be
on owner.
20. FLOORING AND SKIRTING:-
a. Flooring and skirting with Granite/ Vitrified tiles slab, 6x4 feet upto
Rs.100/.Sq.ft will be provided by provided by contractor and due to size
variation if the labour costs difference than the normal it has to be paid by the
owner.
Note: - Inclusive of GST and all the tiles/granite will be owner choice
b. Toilet floor tiles up to Rs. 60/- Per sqft (SKID proof) inclusive of GST.
c. Parking tiles up to Rs.50/- per sqft (SKID proof) inclusive of GST. With cement
adhesive below.
d. Tile fixing adhesive will used for fixing of floor tiles.(T-01 or equivalent depend
on availability)
e. For windows frame granite and nosing charges has to be paid by owner and
laying charges labour has to be paid by contractor.
a. Toilet/Bathroom wall tiles up to Rs. 50/- Per sqft (water proof done using
Epoxy) inclusive of GST upto 7 feet.
b. Kitchen Tiles upto Rs.60/- Per sqft. Above kitchen counter slab upto 7feet
c. Dadoo tiles upto 7 feet and 4 feet wide of ground floor main door and first floor
main door only Rs.60 sq ft.( not included 3rd floor door or any other door)
d. Tile fixing adhesive cement will be used as per height.
e. Kitchen slab thickness 38-40mm will be provided upto Rs.150 per sqft.
f. Washing Sink in the kitchen will be provide 38mm to 40mm cut piece
ABOVE ALL THE RATES ARE INCLUSIVE OF GST
g. Nosing inside the building will be provided by contractor rather than specified it
has to be paid by owner.
Note: - Above 7 feet the full charges has to be paid by owner.
30. SECOND FLOOR TOILET AND BATH :-( only for TWO rooms
& third room one as replica like ground floor)
31. KITCHEN:-
a. Provision shall me made for exhaust fan in the ground floor and first floor.
b. Water inlet and outlet will be provided in the utility area
c. Sink mixer upto Rs.4000/- will be provided.
d. Sink cut piece of granite will be upto Rs.5000/-
With WITNESS
1.
2.
SLAB OF PAYMENT:-
1. 20 lakhs ----------------------------------- till initial up to ground floor lintel
CONTRACTOR