The document outlines various maintenance and remodeling tasks, including the installation of conference room furniture, caravan floorboard replacements, and bathroom renovations. It also details the specifications and procedures for the installation of a 1400L external diesel tank and the operation of a 40,000 PSI hydroblasting machine. Additionally, it covers housekeeping practices and safety measures for warehouse and company yard management.

Uploaded by

jonathanoghomeh
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views

Cccc

The document outlines various maintenance and remodeling tasks, including the installation of conference room furniture, caravan floorboard replacements, and bathroom renovations. It also details the specifications and procedures for the installation of a 1400L external diesel tank and the operation of a 40,000 PSI hydroblasting machine. Additionally, it covers housekeeping practices and safety measures for warehouse and company yard management.

Uploaded by

jonathanoghomeh
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

DONE

Cleaning and remodeling of conference room

Installation of conference room tables and chairs

Maintenance and remodeling of STUBBCEK

Breaking of floor boards in the specified caravans

Measurements of caravan, cutting out dimension of floor boards

Installation of floor boards

Correction of the flor boards

Using metal sheets to create a base for bathroom

Tiling of bathroom

Installation of air-conditioning unit (1.5 hp ,3 hp )

At stubbcck(7)

Fitting of external layer of hose on tested pipes

Testing of hydoblasting hose

Inspection of gas rack for offshore shipment.

House keeping of ware house and company yard

Maintenance of 40,000 psi hydoblasting machine

Replacement of batteies

Cleaning

Remodeling of office

Breaking and replacement of tiles

Welding of container to stop water from entering the valve testing machine

3.5.2 Importance of an External Diesel Tank


3.5.3 Specifications and Materials
3.5.4 Structural Design
3.5.5 Filtration System
3.5.6Flowline and Transportation
3.5.7 Measurement Scale
3.5.8 Filling and Maintenance
3.5.9 Monitoring and Safety Measures

3.5.2 Importance of an External Diesel Tank


3.5.3 Design and Construction
3.5.4 Specifications and Materials
3.5.6 Structural Design
3..5.7 Filtration System
3.5.8 Flowline and Transportation
3.5.9 Measurement Scale
3.5.10 Operational Procedures
3.5.11 Filling and Maintenance
3.5.12 Monitoring and Safety Measures

3.6 INSTALLATION OF A 1400L EXTERNAL DIESEL TANK


3.6.1 Overview
3.6.2 Site Preparation

3.6.3 Tank Specifications


3.6.4 Site Assessment
3.6.5 Foundation and Support
3.6.6 Tank Placement
3.6.7 Piping and Connections
3.6.8 Safety Measures
3.6.9 Compliance and Regulatory Considerations
3.6.10 Conclusion
3.7 HUGHINS 40,000 PSI HYDROBLATING MACHINE
3.7.1 Components of a 40,000 PSI Perkins Hydroblasting Machine
3.7.2 step-by-step explanation of how a 40,000 PSI hydroblasting machine operates

3.8 ULTRA BAR 30 DIESEL DRIVEN PUMP SET OPERATION AND MAINTENANCE
MANUAL FOR HYDRO BLASTING MACHINE
3.8.1 What is Hydroblasting

3.8.2 Importance of a Hydroblasting Manual


3.8.3 Key Components of a Hydroblasting Manual
3.8.4 Challenges and Considerations
3.8.5 Conclusion
3.9 HYDROBLASTING GUN MAINTENANCE
3.9.1 OVERVIEW

3.9.2 Overview of the Barracuda


3.9.3 Routine Maintenance
3.9.4 Nozzle Replacement
3.9.5 Replacement Procedure
3.9.6 Frequency of Replacement
3.9.7 Documentation and Record Keeping
3.9.8 Conclusion

3.10 TESTING OF 20 WATER HOSE FOR A 40,000 PSI HYDROBLASTING MACHINE


3.10.1 Background
3.10.2 Testing Procedure
3.10.3 Results
3.10.4 Selection and Recommendations
3.10.5 Conclusion
3.11 ADDITION OF AN EXTRA LAYER OF HOSE TO THE SELECTED HOSES FOR OPERATION ON A
40,000 PSI HYDROBLASTING MACHNE

3.11.1 Background
3.11.2 The Need for an Extra Layer
3.11.3 Process and Equipment
3.11.3 Process and Equipment
3.11.5 Conclusion

3.12 REMODELING AND MAINTAINING CARAVANS IN PEERSONNEL HOUSING


AREA AT STUBB CRECK
3.12.1 Overview of Personnel Housing at STUBBCRECK
3.12.2 Current State of Caravans
3.12.3 Importance of Caravans for Personnel

3.12.4 replacement of worn-out floor boards in the onsite caravans


3.12.5 Equipment Required

3.12.6 Step-by-Step Procedure


.3.12.7 Types of Fastening Methods
3.12.8 Recommended Nail Type and Installation Technique
3.12.9 Analysis of Potential Issues
3.12.10 Conclusion and Recommendations

3.13 RENOVATION OF CARAVAN BATHROOM

3.13.1 Step-by-Step Process

3.13.2 Precautions Taken


3.13.3 Equipment Used
3.13.4 Conclusion

3.14 AIR CONDITIONING SYSTEM


3.14.1 Principle of Air Conditioning Operation
3.14.2 Key Components of an Air Conditioning Unit
3.14.3 Step-by-Step Process of Installing a New Air Conditioning Unit

Plate 3.1: 110 kva Generator Operation at CHESROC NIG.


Plate 3.2: 1400L External Diesel Tank for Generator Operation at CHESROC NIG.

Plate 3.3: Diesel Filter and Pipe Connection for External Diesel Tank

Plate 3.4: HUGHINS 40,000 PSI HYDROBLASTING MACHINE


Plate 3.5: Ultra Bar Diesel Driven Pumpset Operation
and Maintenance Manual

Plate 3.6: Nozzle Inspection and Replacement for Barracuda of a


Hydroblasting Gun.
Plate 3.7: Operation of Hydroblasting Machine to Test Various Water Hose

Plate 3.8: Floor Board


Plate 3.9 installation of floor boards
Plate 3.10: fastening of floor boards
Plate 3.11: bathroom of a caravan with the floor removed
Plate 3.12: Cutting of Metal to be used as a base
Plate 3.13: Welding of the metal to the the support beam of the caravan
Plate 3.14: Installation of indoor unit of A/C
Plate 3.15: Removal of A/C unit

3.14.4 Process of Trapping and Adding Refrigerant

3.15 Air Conditioning Unit Removal at CHESROC


3.15.1 Procedure
3.15.2 Observations and Insights
3.15.3 Conclusion

3.16 INSPECTION, CERTIFICATION, WELDING, AND PAINTING OF GAS RACKS


FOR AN FPSO OFFSHORE
3.16.1 Background:

3.16.2 Inspection and Certification:


3.16.3 Welding and Painting
3.16.4 Precautions and Safety Measures
3.16.5 Observations and Insights
3.16.6 Conclusion

3.17 HOUSEKEEPING IN THE WAREHOUSE AND COMPANY YARD AT CHESROC


3.17.1 Background
3.17.2 Housekeeping Practices Observed
3.17.3 Importance of Effective Housekeeping
3.17.4 Recommendations

3.17.5 Conclusion