Instructions - Sun 3.6 6k sg03lp1 Eu - 240203 - en
Instructions - Sun 3.6 6k sg03lp1 Eu - 240203 - en
Hybrid Inverter
SUN-5K-SG03LP1-EU
SUN-6K-SG03LP1-EU
User Manual
07/08/2021 11:11:10 Thu
0 2.00 7 0 0.00 5
KW KW
ON
76% Signal
on
0 -1.39
KW
5 0 2.00
KW 5
Contents
1. Safety Introductions 01
2. Product instructions 02-04
3. Installation 05-21
4. OPERATION 22
6. Mode 37-39
7. Fault information and processing 39-42
8. Limitation of Liability 42
9. Datasheet 43-44
10. Appendix I 45-46
11. Appendix II 47
12. EU Declaration of Conformity 47-48
About This Manual
The manual mainly describes the product informa�on, guidelines for installa�on, opera�on and
maintenance. The manual cannot include complete informa�on about the photovoltaic (PV)
system.
1. Safety Introduc�ons
Safety signs
The DC input terminals of the inverter must Surface high temperature, Please do not
not be grounded. touch the inverter case.
The AC and DC circuits must be Prohibit disassembling inverter case,
disconnected separately, and there exis�ng shock hazard, which may
the maintenance personnel cause serious injury or death, please ask
must wait for 5 minutes before they are completely qualified person to repair.
powered off before they can start working.
Please read the instruc�ons carefully Do Not put it in the waste bin! Recycle it
before use. by licensed professional!
· This chapter contains important safety and opera�ng instruc�ons. Read and keep this manual
for future reference.
· Before using the inverter, please read the instruc�ons and warning signs of the ba�ery and
corresponding sec�ons in the instruc�on manual.
· Do not disassemble the inverter. If you need maintenance or repair, take it to a professional
service center.
· Improper reassembly may result in electric shock or fire.
· To reduce risk of electric shock, disconnect all wires before a�emp�ng any maintenance or
cleaning. Turning off the unit will not reduce this risk.
· Cau�on: Only qualified personnel can install this device with ba�ery.
· Never charge a frozen ba�ery.
· For op�mum opera�on of this inverter, please follow required specifica�on to select appropriate
cable size. It is very important to correctly operate this inverter.
· Be very cau�ous when working with metal tools on or around ba�eries. Dropping a tool may
cause a spark or short circuit in ba�eries or other electrical parts, even cause an explosion.
· Please strictly follow installa�on procedure when you want to disconnect AC or DC terminals.
Please refer to "Installa�on" sec�on of this manual for the details.
· Grounding instruc�ons - this inverter should be connected to a permanent grounded wiring
system. Be sure to comply with local requirements and regula�on to install this inverter.
· Never cause AC output and DC input short circuited. Do not connect to the mains when DC
input short circuits.
2. Product Introduc�ons
This is a mul�func�onal inverter, combining func�ons of inverter, solar charger and ba�ery
charger to offer uninterrup�ble power support with portable size. Its comprehensive LCD display
offers user configurable and easy accessible bu�on opera�on such as ba�ery charging, AC/solar
charging, and acceptable input voltage based on different applica�ons.
1
2
3
6
5 7
4
8
9
10
11
12
13
14
15
16
17
18
1: Inverter Indicators 7: DRMs Port 13: Power on/off bu�on
2: LCD display 8: Parallel port 14: DC Switch
3: Func�on Bu�ons 9: Func�on Port 15: PV input with two MPPT
4: Ba�ery input connectors 10: Generator input 16: Ba�ery
5: RS 485/Meter Port 11: Load 17: Temperature sensor
6: BMS 485/CAN Port 12: Grid 18: WiFi Interface
2.2 Product Size
Inverter Size
2.3 Product Features
- Self-consump�on and feed-in to the grid.
- Auto restart while AC is recovering.
- Programmable supply priority for ba�ery or grid.
- Programmable mul�ple opera�on modes: On grid, off grid and UPS.
- Configurable ba�ery charging current/voltage based on applica�ons by LCD se�ng.
- Configurable AC/Solar/Generator Charger priority by LCD se�ng.
- Compa�ble with mains voltage or generator power.
- Overload/over temperature/short circuit protec�on.
- Smart ba�ery charger design for op�mized ba�ery performance
- With limit func�on, prevent excess power overflow to the grid.
- Suppor�ng WIFI monitoring and build-in 2 strings of MPP trackers
- Smart se�able three stages MPPT charging for op�mized ba�ery performance.
- Time of use func�on.
- Smart Load Func�on.
AC cable DC cable
WiFI
GPRS
CT
User
manual
Please AVOID direct sunlight, rain exposure, snow laying up during installa�on and
opera�on. Before connec�ng all wires, please take off the metal cover by removing
screws as shown below:
5 00mm
For proper air circula�on to dissipate heat, allow a clearance of approx. 50cm to the side and
approx. 50cm above and below the unit. And 100cm to the front.
For safe opera�on and compliance, a separate DC over-current protector or disconnect device is
required between the ba�ery and the inverter. In some applica�ons, switching devices may not
be required but over-current protectors are s�ll required. Refer to the typical amperage in the
table below for the required fuse or circuit breaker size.
Connec�ng the ba�ery with a suitable cable is important for safe and efficient
opera�on of the system. To reduce the risk of injury, refer to Chart 3-2 for
recommended cables.
8.4
mm
DC Ba�ery Input Pass the ba�ery power cable Pass the BMS communica�on cable
through the magne�c ring and through the magne�c ring and wrap
wrap it around the magne�c it around the magne�c ring four �mes.
ring two �mes.
4. In case of children touch or insects go into the inverter, Please make sure the inverter
connector is fasten to waterproof posi�on by twist it clockwise.
LOAD
GRID
PE PE PE
N N N
L L L
3. Then, insert AC output wires according to polari�es indicated on the terminal block and �ghten
terminal. Be sure to connect corresponding N wires and PE wires to related terminals as well.
4. Make sure the wires are securely connected.
5. Appliances such as air condi�oner are required at least 2-3 minutes to restart because it is
required to have enough �me to balance refrigerant gas inside of circuit. If a power shortage
occurs and recovers in short �me, it will cause damage to your connected appliances. To
prevent this kind of damage, please check manufacturer of air condi�oner if it is equipped with
�me-delay func�on before installa�on. Otherwise, this inverter will trigger overload fault and
cut off output to protect your appliance but some�mes it s�ll causes internal damage to the air
condi�oner
3.5 PV Connec�on
Before connec�ng to PV modules, please install a separately DC circuit breaker between
inverter and PV modules. It is very important for system safety and efficient opera�on to
use appropriate cable for PV module connec�on. To reduce risk of injury, please use the
proper recommended cable size as below.
To avoid any malfunc�on, do not connect any PV modules with possible current
leakage to the inverter. For example, grounded PV modules will cause current
leakage to the inverter.When using PV modules, please ensure the PV+ & PV-
of solar panel is not connected to the system ground bar.
It is requested to use PV junc�on box with surge protec�on. Otherwise, it will
cause damage on inverter when lightning occurs on PV modules.
3.5.1 PV Module Selec�on:
When selec�ng proper PV modules, please be sure to consider below parameters:
1) Open circuit Voltage (Voc) of PV modules not exceeds max. PV array open circuit voltage of
inverter.
2) Open circuit Voltage (Voc) of PV modules should be higher than min. start voltage.
3) The PV modules used to connected to this inverter shall be Class A ra�ng cer�fied according
to lEC 61730.
Chart 3-5
3.6 CT Connec�on
L N PE L N PE L N PE
*Notewhen the reading of the load power on the LCD is not correct, please
reverse the CT arrow.
3.6.1 Meter Connec�on
1 2 3 4
RS485A
RS485B
CHINT meter
L L
A B GND
N N
5 6 7 8 9 10
A B GND 1+COM 2+
3 4
5 6 7 8 9 10
A B GND 1+COM 2+
3 4 RS485A
When the inverter is working in This diagram is an example for grid systems without special requirements on
backup mode, neutral and PE on
the backup side are connected electrical wiring connec�on.
via the internal relay. Also, this Note: The back-up PE line and earthing bar must be grounded properly and
internal relay will be open when PV effec�vely.
the inverter is working in grid
�ed mode. Otherwise the back-up func�on may be abnormal when the grid fails.
DC Breaker
N
PE
AC Breaker
BMS L L
N N Load
PE PE
Battery Load
DC Breaker CT
Hybrid Inverter
AC Breaker AC Breaker
AC Breaker
L L
CT
N N Grid
Diesel
generator PE PE
Grid
E-BAR
E-BAR
L N PE
Home Loads
This diagram is an example for applica�on that Neutral connects together with
DC Breaker
PE in distribu�on box.
Such as: Australia, New Zealand, South Africa, etc. (Please follow local wiring
PV regula�ons!)
AC Breaker
BMS L L
N N Load
PE or Do not connect this terminal PE
Battery Load
when the neutral wire and PE
wire are connected together.
DC Breaker CT
Hybrid Inverter
AC Breaker AC Breaker
AC Breaker
L L
CT
N N Grid
Diesel
PE PE
generator
Grid
N-BAR
E-N
Link
E-BAR
E-BAR
L N PE
Home Loads
3.10 Typical applica�on diagram of diesel generator
(Region:EU)
L N PE L N PE L N PE
L N PE L N PE L N PE
L N PE L N PE L N PE
L N PE L N PE L N PE
Up To go to previous selec�on
0 1.85 7 0 0.04 5
KW KW
ON
25%
0 -1.79
KW
5 0 0.02
KW
5
1.The icon in the center of the home screen indicates that the system is Normal opera�on. If it
turns into "comm./FXX" , it means the inverter has communica�on errors or other errors,
the error message will display under this icon(FXX errors, detail error info can be viewed in
the System Alarms menu).
3.System Setup Icon, Press this set bu�on,you can enter into the system setup screen which
including Basic Setup, Ba�ery Setup, Grid Setup, System Work Mode, Generator port use,
Advanced func�on and Li-Ba� info.
4.The main screen showing the info including Solar, Grid, Load and Ba�ery. Its also displaying the
energy flow direc�on by arrow. When the power is approximate to high level, the color on the
panels will changing from green to red so system info showing vividly on the main screen.
CANCEL Day Month Year Total CANCEL Day Month Year Total
CANCEL Day Month Year Total CANCEL Day Month Year Total
Solar power curve for daily, monthly, yearly and total can be roughly checked on the LCD, for more
accuracy power genera�on, pls check on the monitoring system. Click the up and down arrow to
check power curve of different period.
5.4 System Setup Menu
System Setup
This is System Setup page.
Basic Advanced
Setting Function Device Info.
Basic Setting
Factory Reset: Reset all parameters of the inverter.
Time Syncs Beep Auto Dim Lock out all changes: Enable this menu for se�ng
Year Month Day Basic parameters that require locking and cannot be set up.
2019 03 17
Set Before performing a successful factory reset and locking
the systems, to keep all changes you need to type in a
Hour Minute password to enable the se�ng.
24-Hour 09 15 The password for factory se�ngs is 9999 and for lock
out is 7777.
Factory Reset Lock out all changes
PassWord
Factory Reset Password: 9999
X--X--X--X DEL Lock out all changes Password: 7777
1 2 3 System selfchek: A�er �cking this item,
it needs input the password.
4 5 6
The default password is 1234
7 8 9
CANCEL 0 OK
5.6 Ba�ery Setup Menu
Battery Setting Ba�ery capacity: it tells Deye hybrid inverter to know
your ba�ery bank size.
Batt Mode Use Ba� V: Use Ba�ery Voltage for all the se�ngs (V).
Lithium Batt Capacity 400Ah Use Ba� %: Use Ba�ery SOC for all the se�ngs (%).
Batt Max. A charge/discharge: Max ba�ery charge/discharge
Mode
Use Batt V Max A Charge 40A current(0-90A for 3.6kW model, 0-120A for 5kW model,
Use Batt %
0-135A for 6kW model).
Max A Discharge 40A
For AGM and Flooded, we recommend Ah ba�ery
No Batt size x 20%= Charge/Discharge amps.
Activate Battery Disable Float Charge
. For Lithium, we recommend Ah ba�ery size x 50% =
Charge/Discharge amps.
. For Gel, follow manufacturer' s instruc�ons.
No Ba�: �ck this item if no ba�ery is connected to the
system.
Ac�ve ba�ery: This feature will help recover a ba�ery that is over discharged by slowly charging from
the solar array or grid.
Disable Float Charge: For the lithium ba�ery with BMS communica�on, the inverter will keep the
charging voltage at the current voltage when the BMS charging current requested is 0. It is used to help
prevent ba�ery from being overcharged.
This is Grid Charge, you need select. ② Gen Force: When the generator is connected, it is forced
to start the generator without mee�ng other condi�ons.
Start =30%: No useJust for customiza�on.
A = 40A: It indicates the Current that the
Grid charges the Ba�ery.
Grid Charge: It indicates that the grid charges
the ba�ery.
Grid Signal: Disable.
0 2.00 7 0 0.00 5
KW KW
ON
76% Signal
on
0 -1.39
KW
5 0 2.00
KW 5
Generator
This page tells generator output voltage, frequency,
Power: 1392W Today=0.0 KWH power. And, how much energy is used from generator.
Total =2.20 KWH
L1: 228V
Freq:50.0Hz
Battery Setting
Lithium Mode: This is BMS protocol.Please reference
the document(Approved Ba�ery).
Lithium Mode 00
Shutdown 10%: It indicates the inverter will shutdown
Batt
Shutdown 10% Set3 if the SOC below this value.
Low Ba� 20%: It indicates the inverter will alarm if the
Low Batt 20%
SOC below this value.
Restart 40% Restart 40%: Ba�ery voltage at 40% AC output will
resume.
Zero Export To Load: Hybrid inverter will only provide power to the backup load connected. The hybrid
inverter will neither provide power to the home load nor sell power to grid. The built-in CT will detect
power flowing back to the grid and will reduce the power of the inverter only to supply the local load and
charge the ba�ery.
Battery
Zero Export To CT: Hybrid inverter will not only provide power to the backup load connected but also give
power to the home load connected. If PV power and ba�ery power is insufficient, it will take grid energy
as supplement. The hybrid inverter will not sell power to grid. In this mode, a CT is needed. The installa�on
method of the CT please refer to chapter 3.6 CT Connec�on. The external CT will detect power flowing back
to the grid and will reduce the power of the inverter only to supply the local load, charge ba�ery and home
load.
CT
Battery
Solar Sell: “Solar sell” is for Zero export to load or Zero export to CT: when this item is ac�ve, the surplus
energy can be sold back to grid. When it is ac�ve, PV Power source priority usage is as follows: load
consump�on and charge ba�ery and feed into grid.
Max. sell power: Allowed the maximum output power to flow to grid
Zero-export Power: for zero-export mode, it tells the grid output power. Recommend to set it as 20-100W
to ensure the hybrid inverter won' t feed power to grid.
Energy Pa�ern: PV Power source priority.
Ba� First: PV power is firstly used to charge the ba�ery and then used to power the load. If PV power is
insufficient, grid will make supplement for ba�ery and load simultaneously.
Load First: PV power is firstly used to power the load and then used to charge the ba�ery. If PV power is
insufficient, grid will make supplement for ba�ery and load simultaneously.
Max Solar Power: allowed the maximum DC input power
Grid Peak-shaving: when it is ac�ve, grid output power will be limited within the set value. If the load
power exceeds the allowed value, it will take PV energy and ba�ery as supplement. If s�ll can’t meet the
load requirement, grid power will increase to meet the load needs.
System Work Mode Time of use: it is used to program when to use grid or
Grid
generator to charge the ba�ery, and when to discharge
Time Of Use the ba�ery to power the load. Only �ck "Time Of Use"
Charge Gen Time Power Batt
Work then the follow items (Grid, charge, �me, power etc.)
01:00 5:00 5000 49.0V Mode2 will take effect.
05:00 9:00 5000 50.2V
Note: when in selling first mode and click �me of use,
the ba�ery power can be sold into grid.
09:00 13:00 5000 50.9V Grid charge: u�lize grid to charge the ba�ery in a �me
13:00 17:00 5000 51.4V period.
Gen charge: u�lize diesel generator to charge the ba�ery
17:00 21:00 5000 47.1V
in a �me period.
21:00 01:00 5000 49.0V Time: real �me, range of 01:00-24:00.
Power: Max. discharge power of ba�ery allowed.
Ba�(V or SOC %): ba�ery SOC % or voltage at when the
ac�on is to happen.
For example:
System Work Mode
During 00:00-05:00, when ba�ery SOC is lower than 80%, it will
Grid Time Of Use
use grid to charge the ba�ery un�l ba�ery SOC reaches 80%.
Charge Gen Time Power Batt During 05:00-08:00 and 08:00-10:00, when ba�ery SOC is higher
Work
00:00 5:00 5000 80% Mode2
than 40%, hybrid inverter will discharge the ba�ery un�l the SOC
reaches 40%.
05:00 8:00 5000 40%
During 10:00-15:00, when ba�ery SOC is higher than 80%, hybrid
08:00 10:00 5000 40% inverter will discharge the ba�ery un�l the SOC reaches 80%.
10:00 15:00 5000 80% During 15:00-18:00, when ba�ery SOC is higher than 40%, hybrid
15:00 18:00 5000 40% inverter will discharge the ba�ery un�l the SOC reaches 40%.
18:00 00:00 5000 35% During 18:00-00:00, when ba�ery SOC is higher than 35%, hybrid
inverter will discharge the ba�ery un�l the SOC reaches 35%.
System Work Mode It allows users to choose which day to execute the
se�ng of “Time of Use”.
Mon Tue Wed Thu Fri Sat Sun For example, the inverter will execute the �me of use
Work page on Mon/Tue/Wed/Thu/Fri/Sat only.
Mode4
5.8 Grid Setup Menu
Grid Setting/F(W) FW: this series inverter is able to adjust inverter output
F(W) power according to grid frequency.
Over frequency Droop f 40%PE/Hz
Droop f: percentage of nominal power per Hz
Grid For example, “Start freq f50.2Hz, Stop freq f50.2,
Start freq f Stop freq f Set4
50.20Hz 50.20Hz
Droop f=40%PE/Hz” when the grid frequency reaches
Start delay f 0.00s Stop delay f 0.00s 50.2Hz, the inverter will decrease its ac�ve power at
Droop f of 40%. And then when grid system frequency
Under frequency Droop f 40%PE/Hz is less than 50.2Hz, the inverter will stop decreasing
Start freq f 49.80Hz Stop freq f 49.80Hz output power.
For the detailed setup values, please follow the local
Start delay f Stop delay f 0.00s
0.00s
grid code.
Grid Setting/V(W) V(Q) V(W): It is used to adjust the inverter ac�ve power
according to the set grid voltage.
V(W) V(Q) V(Q): It is used to adjust the inverter reac�ve power
Lock-in/Pn Lock-out/Pn
according to the set grid voltage.
Grid This func�on is used to adjust inverter output power
5% 20%
Set5 (ac�ve power and reac�ve power) when grid voltage
V1 109.0% P1 100% V1 90.0% Q1 44%
changes.
For example: V2=110%, P2=20%. When the grid voltage reaches the 110% �mes of rated grid voltage,
inverter output power will reduce its ac�ve output power to 20% rated power.
For example: V1=90%, Q1=44%. When the grid voltage reaches the 90% �mes of rated grid voltage,
inverter output power will output 44% reac�ve output power.
For the detailed setup values, please follow the local grid code.
Grid Setting/P(Q) P(F) P(Q): It is used to adjust the inverter reac�ve power
according to the set ac�ve power.
P(Q) P(PF) P(PF): It is used to adjust the inverter PF according
to the set ac�ve power.
Lock-in/Pn Lock-out/Pn
Grid For the detailed setup values, please follow the local
50% 50% Set6 grid code.
P1 0% Q1 0% P1 0% PF1 -2.400 Lock-in/Pn 50%: When the inverter output ac�ve power
is less then 50% rated power, it won't enter the P(PF)
P2 0% Q2 0% P2 0% PF2 0.000 mode.
Lock-out/Pn 50%: When the inverter output ac�ve
P3 0% Q3 0% P3 0% PF3 0.000 power is higher then 50% rated power, it will enter the
P(PF) mode.
P4 0% Q4 0% P4 0% PF4 6.000
Note : only when the grid voltage is equal to or higher
than 1.05�mes of rated grid voltage, then the P(PF)
mode will take effect.
LV1 50%
CANCEL OK
Advanced Function
Secondly, �ck “System selfchek” ,
Solar Arc Fault ON Backup Delay
then it will ask you input the password,
0ms
Clear Arc_Fault Func and the default password is 1234.
Set1
System selfcheck Gen peak-shaving
Note: please don’t �ck “CEI-021 Report ”.
DRM CT Ratio
20001 This “System selfcheck” program is valid only a�er
Signal ISLAND MODE
choosing grid type as "CEI-021".
CEI 0-21 Report
BMS_Err_Stop
PassWord
4 5 6
7 8 9
CANCEL 0 OK
Inverter ID : 2012041234
Self-Test OK 8/8 During the self-test process, all the indicators
Testing 59.S1... Test 59.S1 OK!
will be on and the alarm keeps on.
Testing 59.S2... Test 59.S2 OK! When all the test items shows OK,
Testing 27.S1... Test 27.S1 OK! which means the self-test is completed
Testing 27.S2... Test 27.S2 OK! successfully.
Testing 81>S1... Test 81>S1 OK!
Testing 81>S2... Test 81>S2 OK!
Testing 81<S1... Test 81<S1 OK!
Testing 81<S2... Test 81<S2 OK!
Advanced Function
Solar Arc Fault ON Backup Delay
then press “esc” bu�on to quit from this page.
0ms
Tick “system selfcheck”on the Advanced
Clear Arc_Fault Func func�on menu and �ck “CEI-021 Report”.
Set1
System selfcheck Gen peak-shaving
DRM CT Ratio
20001
Signal ISLAND MODE
PassWord
System selfchek: A�er �cking this item,
it needs input the password.
X--X--X--X DEL
The default password is 1234.
1 2 3 A�er input the password and then �ck "OK"`
4 5 6
7 8 9
CANCEL 0 OK
Inverter ID : 2012041234
Self-Test Report This page will shows the test result of
59.S1 threshold253V 900ms 59.S1: 228V 902ms "CEI-021 self-check".
59.S2 threshold264.5V 200ms 59.S2: 229V 204ms
27.S1 threshold195.5V 1500ms 27.S1: 228V 1508ms
27.S2 threshold 34.5V 200ms 27.S2: 227V 205ms
81>.S1 threshold 50.2Hz 100ms 81>.S1: 49.9Hz 103ms
81>.S2 threshold 51.5Hz 100ms 81>.S2: 49.9Hz 107ms
81<.S1 threshold 49.8Hz 100ms 81<.S1: 50.0Hz 95ms
81<.S2 threshold 47.5Hz 100ms 81<.S2: 50.1Hz 97ms
Advanced Function
DC 1 for WindTurbine DC 2 for WindTurbine
On-Grid Inverter
Solar Solar
Meter
Battery Battery
CT
Smart Load Grid Smart Load CT Grid
6. Mode
Mode I:Basic
AC cable DC cable COM cable
Solar
CT
Battery
Grid
Grid
CT
Battery
Generator
Grid
CT
Battery
Smart Load
CT Grid
Solar
Backup Load
Battery
On-Grid Inverter
AC cable DC cable
Solar
Battery
CT
Smart Load Grid
AC cable DC cable
Backup Load
Solar
Battery
CT
Smart Load Grid
The 1st priority power of the system is always the PV power, then 2nd and
3rd priority power will be the ba�ery bank or grid according to the se�ngs.
The last power backup will be the Generator if it is available.
If any of the fault messages listed in Table 7-1 appear on your inverter and the
fault has not been removed a�er restar�ng, please contact your local dealer or
service center. You need to have the following informa�on ready.
8.Limita�on of Liability
In addi�on to the product warranty described above, the state and local laws and regula�ons
provide financial compensa�on for the product's power connec�on (including viola�on of implied
terms and warran�es). The company hereby declares that the terms and condi�ons of the
product and the policy cannot and can only legally exclude all liability within a limited scope.
9. Datasheet
SUN-3.6K- SUN-5K- SUN-6K-
Model
SG03LP1-EU SG03LP1-EU SG03LP1-EU
Battery Input Data
Ba�ery Type Lead-acid or Li-Ion
Ba�ery Voltage Range(V) 40-60V
Max. Charging Current(A) 90A 120A 135A
Max. Discharging Current(A) 90A 120A 135A
Charging Curve 3 Stages / Equaliza�on
External Temperature Sensor yes
Charging Strategy for Li-Ion Ba�ery Self-adap�on to BMS
PV String Input Data
Max. DC Input Power(W) 4680W 6500W 7800W
PV Input Voltage(V) 370V (125V-500V)
MPPT Range(V) 150-425V
Full Load DC Voltage Range 300-425V
Start-up Voltage(V) 125V
PV Input Current(A) 13A+13A
Max.PV Isc(A) 17A+17A
No. of MPP Trackers 2
No. of Strings Per MPP Tracker 1+1
AC Output Data
Rated AC Output and UPS Power(W) 3600 5000 6000
Max. AC Output Power(W) 3960 5500 6600
Peak Power(off grid) 2 �mes of rated power, 10 S
AC Output Rated Current(A) 16.4/15.7A 22.7/21.7A 27.3/26.1A
Max. AC Current(A) 18/17.2A 25/23.9A 30/28.7A
Max. Con�nuous AC Passthrough(A) 35A 40A
Power Factor 0.8 leading to 0.8 lagging
Output Frequency and Voltage 50/60Hz; 220/230V (single phase)
Grid Type Single Phase
Total Harmonic Distor�on (THD) <3% (of nominal power)
DC current injec�on <0.5% In
Efficiency
Max. Efficiency 97.60%
Euro Efficiency 96.50%
MPPT Efficiency >99%
Protection
PV Input Lightning Protec�on Integrated
An�-islanding Protec�on Integrated
PV String Input Reverse Polarity Protec�on Integrated
Insula�on Resistor Detec�on Integrated
Residual Current Monitoring Unit Integrated
Output Over Current Protec�on Integrated
Output Shorted Protec�on Integrated
Surge Protec�on TYPE II(DC), TYPE II(AC)
Over Voltage Category OVC II(DC), OVC III(AC)
SUN-3.6K- SUN-5K- SUN-6K-
Model
SG03LP1-EU SG03LP1-EU SG03LP1-EU
Certifications and Standards
IEC 61727,IEC 62116,CEI 0-21,EN 50549,NRS 097,RD 140,
Grid Regula�on
UNE 217002,OVE-Richtlinie R25,G99,VDE-AR-N 4105
General Data
Opera�ng Temperature Range() -40 to +60, >45 Dera�ng
Cooling Intelligent Air Cooling
Noise(dB) <30 dB
Communica�on with BMS RS485; CAN
Weight(kg) 25
Cabinet size(mm) 330W×580H×232D (Excluding connectors and brackets)
Protec�on Degree IP65
Installa�on Style Wall-mounted
5 Years/10 Years
Warranty the Warranty Period Depends the Final Installa�on Site of Inverter,
More Info Please Refer to Warranty Policy
10. Appendix I
RS 485/METER Port
Defini�on of RJ45 Port Pin for BMS485
RS232
Lead Outside
NINGBO DEYE INVERTER TECHNOLOGY CO., LTD. confirms herewith that the products
described in this document are in compliance with the fundamental requirements and other
relevant provisions of the above mentioned directives. The entire EU Declaration of Conformity
and certificate can be found at https://www.deyeinverter.com/download/#hybrid-inverter-�.
230926006
www.deyeinverter.com
EU Declaration of Conformity
Product: Hybrid Inverter
Models: SUN-3K-SG03LP1-EU;SUN-3.6K-SG03LP1-EU;SUN-5K-SG03LP1-EU;SUN-6K-SG03LP1-EU;
Name and address of the manufacturer: Ningbo Deye Inverter Technology Co., Ltd.
No. 26 South YongJiang Road, Daqi, Beilun, NingBo, China
This declaration of conformity is issued under the sole responsibility of the manufacturer. Also this product
is under manufacturer’s warranty.
This declaration of conformity is not valid any longer: if the product is modified, supplemented or changed in
any other way, as well as in case the product is used or installed improperly.
The object of the declaration described above is in conformity with the relevant Union harmonization legislation:
The Low Voltage Directive (LVD) 2014/35/EU;the Electromagnetic Compatibility (EMC) Directive 2014/30/EU;the
restriction of the use of certain hazardous substances (RoHS) Directive 2011/65/EU.
References to the relevant harmonized standards used or references to the other technical specifications in
relation to which conformity is declared:
LVD:
EN 62109-1:2010 🔴
EN 62109-2:2011 🔴
EMC:
EN IEC 61000-6-1:2019 🔴
EN IEC 61000-6-2:2019 🔴
EN IEC 61000-6-3:2021 🔴
EN IEC 61000-6-4:2019 🔴
EN IEC 61000-3-2:2019/A1:2021 🔴
EN 61000-3-3:2013/A2:2021/AC:2022-01 🔴
EN IEC 61000-3-11:2019 🔴
EN 61000-3-12:2011 🔴
EN 55011:2016/A2:2021 🔴