NO.1188 2019.3.6 GRPN20 - (630 0.5 4 Stops) - CUMBRES HOSPITAL PROJECT
NO.1188 2019.3.6 GRPN20 - (630 0.5 4 Stops) - CUMBRES HOSPITAL PROJECT
Serial number
hydraulic buffer 150~400
polyurethane buffer 200~350 Direction K2 diagrammatic sketch
300
wall, customer should dig a groove.
300
hook load-bearing 2000kg
If it is an interior wall, the access door
by others hall call box
900
shall be installed.
1200
Hoistway top ring beam reserved hole
(Maintenance platform and ladder are
100 by others
provided by others.)
500
300
Top floor section plan
HH1
150
machine supporting beam
1200
1200
by others
concrete lintel
above the door hole 100
HH1
300
position
∅440
B 150
door hole net
495
∅
350
300
40
225 230
625 width 1000 375
0
hoistway net width 2000
45°
1800
500
500
control cabinet main floor HH1=560
∅400 ∅400
815
The door hole net height
door hole net height 2200
reserved hole
1200
typical floors HH1=430
excludes the decorative layer
net door height 2100
by others
K2
Ring beam is reserved in the hoistway every 2000mm, which is done by others
30
50
90
net door width 800
door hole net
300
R1
door hole net width 1000 The door hole net height 500 width 1000 375
3 F 4500
car net width 1200 200 excludes the decorative layer hoistway net width 2000
150 hoistway net width 2000 2 F 4000
hoistway lighting, lamps are set every 7m
1. All buildings in the hoistway should meet the fire protection G F 4000
requirement. It's not allowed to fix the devices and power which is
finished floor Hoistway profile irrelevant to the elevator and unrelated holes. floor
stops
2. The hoistway must be vertical. The horizontal dimension of the hoistway height
should be the minimum clearance size, and perpendicularity errors is 0 ~
+25mm/0 ~ 30m, 0 ~ +30mm/30m ~ 60m, 0 ~ +50mm/ above 60m.
Technical specification
205 970 825 3. When there is a space where people can reach under the ground of pit, application
the counterweight buffer should be installed on solid pile extending to
solid ground, or the customer should make inquiries of the manufacturer model GRPN20
about installing counterweight safety gear.
distance between CWT rails 900 4. Before installation, safety protective enclosure with the height of not speed (m/s) 0.5
less than 1.2m should be installed in all the landing door holes, and
35 make sure that the enclosure should be strong enough. capacity (kg) 630
traveling height
buffer (generally in the top and bottom of the hoistway). The area of the
speed adjustment method VVVF
holes.
traction ratio 2:1
6 . Reserved holes of landing door and hall call box and other
225
reserved holes should be backfilled after installation. door opening 2-panel center opening door
1010 7. It would be best if the hoistway is concrete. If the hoistway is frame
door hole net height 2200
695
300 car guide rail dstance 1330 structure, concrete ring beam with the height of 300mm should be door size (W x H) 800×2100
815
net door height 2100
set where guide rail brackets are installed. And concrete ring beam
with the height of 300mm and the same width of the hoistway car net size (W x D) 1200×1200
should be set at the top edge and bottom edge of every landing
K1 door hole. If the hoistway is solid load-bearing brick structure, car net height 2300
concrete ring beam with the height of 300mm and the same width
30
50 of the hoistway should be set at the top edge and bottom edge of overhead net height
90
4500
hoistway lighting every landing door hole.
net door width 800 pit depth
8. When the distance of two adjacent landing door sills is over 11m, a 1500
pit ladder door hole net width 1000 safety door, which should not be opened towards the hoisway, should
be fixed. The width of safety door should be not less than 350mm and traveling height 12000
car net width 1200 200 the height should be not less than 1800mm.
hoistway net width 2000 9. The pit should be waterproof. If there is a plash, it should be located in No. of floors and stops 4floors/ 4stops/ 4doors
the wall corner.
10. According to requirements of technical parameters table, customer main power 220V AC 50Hz 3-phase 5-wire
Direction B diagrammatic sketch should introduce main power to the position of elevator distribution
lighting source 110V AC 1KVA/set
box which is marked in the entrance of machine room (1.5m above
finished floor the ground), and fix a protection switch and lock it. The power
fluctuation range should not exceed ±7%. The null line and ground motor capacity (kw/set) 4.1
pit depth
overspeed governor
J
Car rope hitch plate mounting base support, connect 14# channel beam to wall wire of the main power should be separated. And the value of
Hoistway bottom grounding resistance should be not more than 4Ω. project name CUMBRES HOSPITAL PROJECT
with three M12 expansion bolts. The support top sustains the bending unit of car
ring beam rope hitch plate mounting base support; the mounting position can be adjusted. 11. Unless otherwise specified, all the loads marked in the drawing
contract
contain impulse correction. The strength of the hoistway wall and pit quantity
But the support shall avoid rope fastening unit. Please refer to the installation should be capable of withstanding all the marked forces. number
500
diagram of the elevator company for details about how to avoid it.
300
12. Those marked "By others" in the drawing (like embedded steel Elevator civil general arrangement plan
plate etc.) should be set in advance.
13. The temperature of machine room should be maintained within 5 ordered by
~ 40 ℃ .Machine room should be smooth, and must be able to
withstand standard uniformly distributed live load of floor which is designed by signed
101KN
81KN
not less than 7.0KN per square meter. When the heights of the and sealed
Please consult with the site survey Elastic cylindrical pin shall be used to fasten car rope hitch plate mounting base support and guide rail. machine room are different and the difference is more than 500mm,
personnel before installation for specific customer should set up the stairs or steps, and set the fence. drawing
GRPN/FB19-1188
parameters of buffer load-bearing piers. A rail bracket should be set under car rope hitch plate mounting base support. 14. Customer needs to set up a rescue duty room, and lay one cable NO.
processed by
of 6 cores to machine room (We recommend using shielded wire).
Each core wire diameter should be at least 0.75 square millimeters.
version 2019
Load bearing capacity
15. Every separation distance between floors should be ≥2600mm.
R1 38KN Sicher Elevator Co., Ltd.