0% found this document useful (0 votes)
49 views15 pages

Cluster 6 - Logistic Hub Combined Infrastructure Drawings

This document contains the tendering and IFC package for the infrastructure cluster 6 drawings related to the logistics hub and service jetty. It includes a detailed drawing list with document numbers and titles for various utility networks, including wastewater, stormwater, domestic water, and firefighting networks. The document has undergone revisions, with the latest being Rev B issued on March 2, 2023, for approval.

Uploaded by

Avinash Pradeep
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views15 pages

Cluster 6 - Logistic Hub Combined Infrastructure Drawings

This document contains the tendering and IFC package for the infrastructure cluster 6 drawings related to the logistics hub and service jetty. It includes a detailed drawing list with document numbers and titles for various utility networks, including wastewater, stormwater, domestic water, and firefighting networks. The document has undergone revisions, with the latest being Rev B issued on March 2, 2023, for approval.

Uploaded by

Avinash Pradeep
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 15

DRAWINGS

4800000492/000 – BOOK 4 – INFRASTRUCTURE


CLUSTER 6 DRAWINGS –LOGISTICS HUB AND
SERVICE JETTY
TENDERING AND IFC PACKAGE

13-180001-4800000492-CH2-INF-DRG-700001 Rev B, 02 March 2023

©NEOM [2023]. All rights reserved.

4
Document History
Revision code Description of changes Purpose of issue Date

Rev A First Issue For Approval 23.01.2023

Rev B Second Issue- 3D Stage For Approval 02.03.2023

Document Approval
Prepared by Reviewed by Approved by

Name ELSAYED/ ABDERRAHMANE/ MAHAVEER/ RAJESH/SUMAN NAVNEET SHARMA/PRITAM BAMANE MOHAMED FOUDA

Job Title SENIOR UTILITIES ENGINEER WET & DRY UTILTIIES INFRASTRUCTURE PROJECT MANAGER
LEAD

DOCUMENT CODE : 13-180001-4800000492-CH2-INF-DRG-700001 REVISION : B PAGE 2 OF 4

©NEOM [2023]. All rights reserved.


Drawing list Document Number Title

Document Number Title 13-180001-4800000492-CH2-INF-DRG-


4800000492/000-WASTEWATER NETWORK LAYOUT SHEET INDEX
161350
WET UTILITIES
13-180001-4800000492-CH2-INF-DRG-
4800000492/000-WASTEWATER NETWORK LAYOUT - SHEET-1
SERVICE CORRIDORS 161351
13-180001-4800000492-CH2-INF-DRG- 13-180001-4800000492-CH2-INF-DRG-
4800000492/000-SERVICE CORRIDORS LAYOUT SHEET INDEX 4800000492/000-SEWER VACUUM COLLECTION CHAMBER DETAILS
161000 561350
13-180001-4800000492-CH2-INF-DRG-
4800000492/000-SERVICE CORRIDORS LAYOUT SHEET 1
161001
STORMWATER NETWORK
13-180001-4800000492-CH2-INF-DRG-
4800000492/000-SERVICE CORRIDORS SECTION 13-180001-4800000492-CH2-INF-DRG-
361000 4800000492/000-STORMWATER NETWORK LAYOUT SHEET INDEX
161400

13-180001-4800000492-CH2-INF-DRG-
4800000492/000-STORMWATER NETWORK LAYOUT - SHEET-1
DOMESTIC WATER NETWORK 161401
13-180001-4800000492-CH2-INF-DRG- 13-180001-4800000492-CH2-INF-DRG-
4800000492/000-DOMESTIC WATER NETWORK LAYOUT SHEET INDEX 4800000492/000-STORMWATER NETWORK PROFILE - SHEET-1
161100 261401
13-180001-4800000492-CH2-INF-DRG- 13-180001-4800000492-CH2-INF-DRG-
4800000492/000-DOMESTIC WATER NETWORK LAYOUT - SHEET-1 4800000492/000-STORMWATER CATCHMENT LAYOUT SHEET INDEX
161101 261425
13-180001-4800000492-CH2-INF-DRG- 13-180001-4800000492-CH2-INF-DRG-
4800000492/000-TYPICAL HOUSE CONNECTION DETAILS 4800000492/000-STORMWATER CATCHMENT LAYOUT – SHEET-1
561100 261426
13-180001-4800000492-CH2-INF-DRG- 13-180001-4800000492-CH2-INF-DRG-
4800000492/000-TRENCH EXCAVATION & BEDDING DETAILS 4800000492/000-STORMWATER NETWORK-MANHOLE TYPICAL DETAILS
561101 561400

13-180001-4800000492-CH2-INF-DRG- 4800000492/000- STORMWATER TRENCH EXCAVATION AND BEDDING


FIREFIGHTING WATER NETWORK 561401 DETAILS

13-180001-4800000492-CH2-INF-DRG- 13-180001-4800000492-CH2-INF-DRG-
4800000492/002 -FIREFIGHTING NETWORK LAYOUT SHEET INDEX 4800000492/000- STORMWATER GRATED CHANNEL/CATCH BASIN DETAILS
161250 561402

13-180001-4800000492-CH2-INF-DRG-
4800000492/002 -FIREFIGHTING NETWORK LAYOUT-SHEET-1
161251 DRY UTILITY
13-180001-4800000492-CH2-INF-DRG- LV NETWORK
4800000492/002 -TRENCH EXCAVATION AND BEDDING DETAILS
561250
13-180001-4800000492-CH2-INF-DRG-
4800000492/000-LV NETWORK SHEET INDEX
161450
IRRIGATION WATER NETWORK 13-180001-4800000492-CH2-INF-DRG-
4800000492/000-LV NETWORK SHEET - 1
13-180001-4800000492-CH2-INF-DRG- 161451
4800000492/002-IRRIGATION NETWORK LAYOUT SHEET INDEX
161300 13-180001-4800000492-CH2-INF-DRG-
4800000492/000-STANDARD DETAILS FOR LV NETWORK
13-180001-4800000492-CH2-INF-DRG- 560450
4800000492/002-IRRIGATION NETWORK LAYOUT - SHEET-1
161301

13-180001-4800000492-CH2-INF-DRG- STREET/UNDERPASS LIGHTING


4800000492/002-IRRIGATION NETWORK PROFILE - SHEET-1
261301 NETWORK
13-180001-4800000492-CH2-INF-DRG- 13-180001-4800000492-CH2-INF-DRG-
4800000492/002- TRENCH EXCAVATION AND BEDDING DETAILS 4800000492/000-STREET/ UNDERPASS LIGHTING SHEET INDEX
561300 161500

13-180001-4800000492-CH2-INF-DRG-
4800000492/000-STREET/ UNDERPASS LIGHTING SHEET - 1
WASTEWATER NETWORK 161501
13-180001-4800000492-CH2-INF-DRG-161501 4800000492/000-STREET/ UNDERPASS LIGHTING S

DOCUMENT CODE : 13-180001-4800000492-CH2-INF-DRG-700001 REVISION : B PAGE 3 OF 4

©NEOM [2023]. All rights reserved.


Document Number Title

13-180001-4800000492-CH2-INF-DRG-
4800000492/000-UNDERPASS LIGHTING DETAILS
161502

13-180001-4800000492-CH2-INF-DRG-
4800000492/000-STANDARD DETAILS FOR STREET/ UNDERPASS LIGHTING
560500

13-180001-4800000492-CH2-INF-DRG- 4800000492/000-SINGLE LINE DIAGRAM FOR STREET /UNDERPASS


560500 LIGHTING

ICT NETWORK

13-180001-4800000492-CH2-INF-DRG-
4800000492/000-ICT CIVIL WORK NETWORK SHEET INDEX
161550

13-180001-4800000492-CH2-INF-DRG-
4800000492/000-ICT CIVIL WORK NETWORK - SHEET - 1
161551

13-180001-4800000492-CH2-INF-DRG-
4800000492/000-STANDARD DETAILS FOR ICT NETWORK
560550

DOCUMENT CODE : 13-180001-4800000492-CH2-INF-DRG-700001 REVISION : B PAGE 4 OF 4

©NEOM [2023]. All rights reserved.


ROAD 1
1 2 3 4 5
GENERAL KEY PLAN:
C4-V06 N N

CL4_ROAD 2
C4-V16
QIBLA

C4-V07 QIBLA

C4-V08

E
C4-V09

UP
C4-V10 LVL 3.120 SHEET-1

UP

HP
AS
E
PH
CB LVL 3.420

LOW SOURCE
AIR
TEM
HP
AS

PER HEAT
L
O

ATU PUM
PO

LOW SOURCE
AIR

RE
TEM
PER HEAT

P
ATU PUM
RE
AS

C4-V11
HP

P
AS
HP

LVL 1.100

UP

LVL 3.120

D C

H
PWS PWS
3

FT
D
PWS 4
12 PWS PWS
2 1 PWS
LVL 3.120
5
PWS
12

PWS PWS

NOTES:
1A 6
PWS
PWS D 7
PWS
12 9
500X400X250

PWS
H

PWS 10 PWS D
8

H
C
11
PPL

D
H
2
PWS
12
H
D

C
PPL

C4-V12
4
PPL
PPL 5
PPL 12
PPL 14 PPL
H
5 19
PPL ∅300X180H
DC
5 PPL

H
PPL PPL PPL 18
C
PPL PPL 5 TF 1 16 PPL
9 PPL
D
PPL 6 3
17
DRAWER

7 PPL
RAIL

PPL
SPEED

8 14 ICE
CHEST
D
PPL PPL

S
EP
DE
STATION

16
BLENDER

R
LIA
PPL 11 PPL
10
300X200X180H
D C
5 H

PPL
PPL 15
13
LVL 3.120
D C PPL
3

1. THIS DRAWING IS THE COPYRIGHT OF JACOBS AND MUST NOT BE RETAINED, COPIED OR USED
WITHOUT THE ABOVE CONSULTANT'S AUTHORITY.
PWA
12

PWA PWA

ANGLE
15

LEDGE
13
PWA
1A PWA
11
PWA

C
2. DO NOT SCALE FROM THE DRAWINGS.

D
10

H
PWA PWA

C
14 9
PWA PWA PWA

FT
D
3 2
PWA 5
PWA
1 PWA
4
8

D
500X400X

H
250H

H
PWA PWA

C
PWA
7 12
3 PWA

D
6

H
POT
8

FT
D

DH C
PWA
2 POT
1A
PCP PWA

C
D POT

H
6 12

HD
5

∅300X180H

C
POT

H D

D
PCP 8

C
400X400X200H
PCP PCP 3
8 1
PCP POT POT

D
4

C
12 7 POT
POT

C
PCP 6 9

HD
5
POT POT
PCP 4 10
7 POT POT
2 9
PCP
2 POT
1

Cr
D

Cs
SSF SSF
1

C
9 POT

D
ICE

D
POT 11 3
BVS 3

H
SSF

C
3 BVS 8 ICE D
BVS 2 4 ICE
2 1

H
BVS
3
SSF
3 ICE
BVS SSF SSF 2 CHF
1 10 3
4
BVS FT
D SSF
3 7 CHF

3. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS NOTED OTHERWISE. ALL

D
SSF 1

3/1
REFRIGERA

6 TED CHF
BVS WELL 2
4
GN

SSF
BVS
5
2 SSF
BVS 4

C
3/1
1

BAIN-MAR
H

D
SSF

D
H

400X400X200H
IE
FT
BVS 2 HPK

GN
BVS
4 3 BVS 2 HPK
BVS 3 24
FT 1 HPK

D
BVS 8
HPK
3 BVS BVS 25
BVS 3 6 HPK HPK
3 3 26
HPK
HPK D
22 27
BVS HPK
BVS HPK
BVS 3 1 21 1 HPK
3 28
BVS HPK
BVS

FT
HPK HPK

D
HPK 10
3 7

GN1/1
3 31
20 HPK HPK HPK HPK
HPK
15 1 23 29
BVS 19
3 BVS HPK
BVS 30 HPK

D
7 HPK HPK HPK
3 BVS BVS 18

ANGLE
GN1/1

DIMENSIONS TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.

G
16 22 33

LEDGE
5 3 BVS
3 HPK

G
HPK 10

ANGLE
BVS HPK HPK

LEDGE
34 6
5 10
BVS BVS BVS

C
HPK
3 3 BVS 3 HPK HPK

G
HPK 5 11 1A
8 4 HPK HPK

D
HPK

∅300X180H
HPK FT
D
HPK 17 33

G
H D
BVS

C
8 1
BVS 3 10

H
SPA

400X400X200
3 HPK HPK

D
SPA
SPA 4 6 HPK 14

C
D
8 H 12 HPK
SPA 5
BVS SPA 32
3 6
SPA 2 HPK
7 HPK

ANGLE
BVS 7

LEDGE
5 SPA 13

D
1

C
BVS

H
D
3 HPK
SPA

DC
∅300X180H
H 9
SPA 9 SPA MPA
11 3D 400X400X200H
4 HPK

G
C
MPA
33

H
5

C
SPA MPA
10 6 MPA
MPA
7 4
MPA MPA HPK
MPA

H
400X400X200
33
8 1 MPA 6 HPK

D H
MPA 7

C
MPA VPA 33

D
MPA 9

D C
MPA 8 H 2
11 MPA

H
12

400X400X200
12 VPA
MPA MPA VPA VPA

FTD
14 4 1A 3
10

ANGLE
MPA VPA VPA

LEDGE
13 5 11
LVL 3.120 VPA VPA
H
6

D
MPA 6 50

C
2 VPA 5
VPA
14

53
400X400X200H
MPA 7 6

D H
C

90
3 MPA VPA VPA
8 VPA 7
11 VPA VPA
LEDGE 1 11
ANGLE 9 VPA
MPA
VPA 12
LVL 0.620

D
10 11 VPA
VPA
13
VPA 10
15 VPA
14
LEDGE
ANGLE

UP

4. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT ARCHITECTURAL,


VPA
15

LVL 1.620

STRUCTURAL, MECHANICAL, ELECTRICAL, AND CIVIL DRAWINGS AND ALL RELEVANT SECTIONS OF
THE SPECIFICATIONS.
UP

D 5. ELECTRICAL STANDARD DETAILS REFER TO DRAWING NO. 13-180001-4800000492-CH2-INF-DRG-560450.


UP

6. TIE IN POINT FOR LV CABLES FROM PSS TO THE LH PLOT IS TENTATIVE ONLY. EXACT TIE IN POINT SHALL BE
REFLECTED ON THE DRAWING DURING IFC STAGE ONCE RESPONSE TO THE RFI (JCB-RFI-000225) IS
RECEIVED.

3103400 N 3103400 N

10.0
10.0
10.0
10.0 2x110 DIA HDPE ROAD
3103300 N CROSSING DUCT (TYP.)

FREEZER
G00-001B

FFL +4.120 m
SSL +4.020 m
CHILLER
G00-001A

10.0

5.0
RECEIVING
G00-001

LOA
DIN
G
BAY
WASH BAY 01
G00-002

WASH BAY 02
G00-003

FD
REPAIR 01
G00-004

REPAIR 02
G00-005

ELECT.
G00-009

STA ICT
GIN

(14

FD
G00-010
G

Nos
LAN

.)
ES

10.0

FD
1M RR
CO
WID IDO
E R
PARKING &

UTI
LIT
STORAGE AREA

Y
G00-007

CONDENSING
G00-044

10.0

FD
0
600mm(W)x600mm(H)x200mm(D)

60

10
.0

STA Nos
(16

GIN
G
.)
LAN
ES
SLOT IN THE WALL FOR

FD
0+
LIGHTING DB-01

UP
.0
10
WASTE COLLECTION

EV
G00-011

CHA Nos

PAR ING
(20

RG

KIN BAY
G
.)

& S
FD

+4.270 m

FLOOR OPERATION
DESK
G00-008

WORKSHOP
G00-012

BORDER SECURITY
G00-013

MEETING ROOM
G00-016

LOGISTIC HUB +4.270 m


SECURITY DRI
VEW
G00-014
AY

10
OFFICE 01
G00-017
.0

OFFICE CORRIDOR
OFFICE 02
G00-019
G00-018

FFL +4.320 m
SSL +4.220 m
TOILET / CHANGING
M.

UP
WC G00-026
G00-026A

UP
CHANGING M. CORRIDOR
WC G00-025 G00-042
G00-026B

LOC
WC

KER
G00-030A

S
ABLUTION M.
G00-024
VESTIBULE
G00-023
TOILET / CHANGING FERRY WAITING
F. JANITOR AREA
G00-030 G00-022 G00-015

INB
VESTIBULE

STA
OUGIN
G00-027 ADA TOILET

NDG LAN
G00-020B

LOC

ES
KER
S
CHANGING F. TOILET F.
G00-029 G00-020
FIRST AID ROOM
UPS ABLUTION F. WC
G00-031
G00-035 G00-028 G00-020A

WC
G00-021A

SHEET-1

OU
STA
TOILET M.

TBOGIN
UN LAN
G00-021
DISHWASH AREA

D
G
G00-032

ES
ADA TOILET
G00-021B

PRAYER ROOM
G00-034
MECHANICAL ROOM
G00-038
MECHANICAL ROOM
G00-037 FFL +4.270 m
SSL +4.170 m

TOW
JET

ARD
FFL +4.270 m

TY
SSL +4.170 m

S
SERVER ROOM BOH LOGISTICS
G00-039 STAFF
G00-033

TIE-IN POINT FOR LV CABLES COMING

.
NO
ING
R-

AW
MTR & GSM

DR
-MA
G00-040

TO
CH2

ER
92-

REF
004
000

TY
+4.420 m -48

JET
FROM PROPOSED DEDICATED PSS

10
001

621
FOR
180

G-1
13-

DR
LV ROOM
G00-041

FOR LOGISTIC HUB


CONDENSING
+4.170 m G00-043

4.270

4.320

UP

3103200 N 3103200 N

6x1WAY 200mm DIA


HDPE DUCT

PLINTH FOR MOBILE DG


(PROVISIONAL)
0
50
0+

PROPOSED DEDICATED PSS


0m 20m 40m 60m 80m 100m
FOR LH BUILDING
(BY OTHERS)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF NEOM. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT FROM NEOM.
ACCESS
LVDB ACCESS
TR

VISUAL SCALE 1:1000 @ A0


LVDB
OPENING
CABLE
ENTRY

PANEL
LV

TRAFO.
OPENING
HV
CABLE
ENTRY

RMU
ACCESS
TR ACCESS
RMU

STAGE 3D-TENDERING AND IFC

B STAGE 3D-TENDERING AND IFC MAF 02.03.23


A STAGE 3B - DEVELOPED DESIGN MAF 23.01.23
REV DESCRIPTION APP DATE
3103100 N
C PURPOSE OF ISSUE:

FOR APPROVAL
CLIENT: PROJECT MANAGEMENT CONSULTANT:

DESIGN CONSULTANT NAME & LOGO (s): CONTRACTOR NAME & LOGO (s):
668100 E

668200 E

668300 E

668400 E

668500 E
C:\My Access\Projects\58 NEOM\ACC MESSED\01.24.2023\13-180001-4800000492-CH2-INF-DRG-161450.dwg

DESIGN SUB-CONSULTANT NAME & LOGO (s):

3103000 N

B DESIGN CONSULTANT / CONTRACTOR: NEOM'S REVIEW:


DRAWN: RKK 02.03.23
CHECKED: PS/PB 02.03.23 CHECKED:
APPROVED: MAF 02.03.23 APPROVED:

SCALE: 1:1000 SHEET SIZE: A0


DISCIPLINE NAME:
INFRASTRUCTURE

4800000492/002 - BOH LOGISTIC HUB


LV NETWORK LAYOUT - SHEET INDEX
PROJECT NAME:

4800000492/002 - SINDALAH ISLAND


BOH LOGISTICS HUB AND SERVICE JETTY
13 - SINDALAH ISLAND

LEGEND: NEOM
A PROPOSED LV CABLE ROUTE IN CONTAINMENT
PROPOSED HDPE ROAD CROSSING BURIED
KINGDOM OF SAUDI ARABIA
DUCT (2x110mm Ø) REGION ASSET CODE CONTRACT CODE
PROPOSED 6x1WAY 200mm DIA BURIED DUCT
13 180001 4800000492
02/03/2023 4:48:20 PM

33kV BACKBONE INFRA NETWORK (BY OTHERS)


PROPOSED STREET LIGHTING / UNDERPASS DRAWING NUMBER
LIGHTING DISTRIBUTION BOARD
667900 N

668100 N

668300 N

668500 N

668700 N
ORIGINATOR DISCIPLINE DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

CH2 INF DRG 161450 B


NEOM-NEN-PRC-010_TMP02_02.00
1 2 3 4 5
GENERAL KEY PLAN:
N

N QIBLA

QIBLA
3103400 N

SHEET-1

NOTES:
1. THIS DRAWING IS THE COPYRIGHT OF JACOBS AND MUST NOT BE RETAINED, COPIED OR USED
WITHOUT THE ABOVE CONSULTANT'S AUTHORITY.

2. DO NOT SCALE FROM THE DRAWINGS.

3. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS NOTED OTHERWISE. ALL
DIMENSIONS TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.

4. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT ARCHITECTURAL,


STRUCTURAL, MECHANICAL, ELECTRICAL, AND CIVIL DRAWINGS AND ALL RELEVANT SECTIONS OF
THE SPECIFICATIONS.

D 5. ELECTRICAL STANDARD DETAILS REFER TO DRAWING NO. 13-180001-4800000492-CH2-INF-DRG-560450.

6. TIE IN POINT FOR LV CABLES FROM PSS TO THE LH PLOT IS TENTATIVE ONLY. EXACT TIE IN POINT SHALL BE
REFLECTED ON THE DRAWING DURING IFC STAGE ONCE RESPONSE TO THE RFI (JCB-RFI-000225) IS
RECEIVED.

10.0
10.0
10.0
10.0 2x110 DIA HDPE ROAD
3103300 N CROSSING DUCT (TYP.)

FREEZER
G00-001B

FFL +4.120 m
SSL +4.020 m
CHILLER
G00-001A

10.0

5.0
RECEIVING
G00-001

LO
AD
IN
G
WASH BAY 01

BA
Y
G00-002

WASH BAY 02
G00-003

FD

REPAIR 01
G00-004

REPAIR 02
G00-005

ELECT.
G00-009

ICT

ST 4 N
(1

FD
AG os
G00-010

IN .)
G
LA
N
ES
10.0

FD
1M OR
C
W RID
ID O
E R
PARKING &

U
TI
STORAGE AREA

LI
TY
G00-007

CONDENSING
G00-044

10.0
FD

0
10
600mm(W)x600mm(H)x200mm(D)

60
.0

ST 6 N
(1
AG os
IN .)
G
LA
N
ES
SLOT IN THE WALL FOR

FD
0+ LIGHTING DB-01

U
P
. 0
10
WASTE COLLECTION

EV HARNos
G00-011

C 0
PA G .)
(2

R ING
KI
N BA
G
& YS
FD
+4.270 m

FLOOR OPERATION
DESK
G00-008

WORKSHOP
G00-012

BORDER SECURITY
G00-013

MEETING ROOM
G00-016

LOGISTIC HUB +4.270 m


SECURITY

D
R
IV
G00-014

EW
AY
10
OFFICE 01
G00-017
.0

OFFICE CORRIDOR
OFFICE 02
G00-019
G00-018

FFL +4.320 m
SSL +4.220 m
TOILET / CHANGING
M.
U
P

WC G00-026
G00-026A
U
P

CHANGING M. CORRIDOR
WC G00-025 G00-042
G00-026B
LO

WC
C
KE

G00-030A
R
S

ABLUTION M.
G00-024
VESTIBULE
G00-023
TOILET / CHANGING FERRY WAITING
F. JANITOR AREA
G00-030 G00-022 G00-015

IN AG
VESTIBULE

BO IN
ST

U G
G00-027 ADA TOILET

N LA
D
G00-020B
LO

N
C

ES
KE
R
S

CHANGING F. TOILET F.
G00-029 G00-020
FIRST AID ROOM
UPS ABLUTION F. WC
G00-031
G00-035 G00-028 G00-020A

WC
G00-021A

O
UT

ST
TOILET M. BO

AG
UN

IN
DISHWASH AREA G00-021 D

G
LA
G00-032

N
ES
ADA TOILET
G00-021B

PRAYER ROOM
G00-034
MECHANICAL ROOM
G00-038
MECHANICAL ROOM
FFL +4.270 m
G00-037
SSL +4.170 m

TO
W

JE
AR

TT
FFL +4.270 m DS

Y
SSL +4.170 m

SERVER ROOM BOH LOGISTICS


G00-039 STAFF
G00-033

TIE-IN POINT FOR LV CABLES COMING


.
- NO
AR G
2- IN
H AW

MTR & GSM


M
-C R
92 D

G00-040
04 TO
00 ER
EF
00
R
00 TTY
48

+4.420 m

FROM PROPOSED DEDICATED PSS


1-

0
JE

11
13 R
80

62
FO

-1
-1

G
DR

LV ROOM
G00-041

FOR LOGISTIC HUB


CONDENSING
+4.170 m G00-043

4.270

4.320

UP

3103200 N

0m 10m 20m 30m 40m 50m


6x1WAY 200mm DIA
HDPE DUCT

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF NEOM. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT FROM NEOM.
VISUAL SCALE 1:500 @ A0

PLINTH FOR MOBILE DG STAGE 3D-TENDERING AND IFC


(PROVISIONAL)
0
50
0+

B STAGE 3D-TENDERING AND IFC MAF 02.03.23


A STAGE 3B - DEVELOPED DESIGN MAF 23.01.23
REV DESCRIPTION APP DATE
C PURPOSE OF ISSUE:

PROPOSED DEDICATED PSS FOR APPROVAL


FOR LH BUILDING
(BY OTHERS) CLIENT: PROJECT MANAGEMENT CONSULTANT:

SS
ACCE SS
LVDB ACCE
TR
LVDB
OPEN
CABL
ING ENTR
E
Y

L
PANE
LV
O.
TRAF
HV
OPEN E
CABL
ING
ENTR
Y

SS RMU
SS
ACCE
TR ACCE
RMU

DESIGN CONSULTANT NAME & LOGO (s): CONTRACTOR NAME & LOGO (s):
C:\My Access\Projects\58 NEOM\ACC MESSED\01.24.2023\13-180001-4800000492-CH2-INF-DRG-161451.dwg

DESIGN SUB-CONSULTANT NAME & LOGO (s):

B DESIGN CONSULTANT / CONTRACTOR: NEOM'S REVIEW:


DRAWN: RKK 02.03.23

3103100 N CHECKED: PS/PB 02.03.23 CHECKED:


APPROVED: MAF 02.03.23 APPROVED:

SCALE: 1:500 SHEET SIZE: A0


DISCIPLINE NAME:
INFRASTRUCTURE

4800000492/002 - BOH LOGISTIC HUB


LV NETWORK LAYOUT - SHEET 01
PROJECT NAME:

4800000492/002 - SINDALAH ISLAND


BOH LOGISTICS HUB AND SERVICE JETTY
13 - SINDALAH ISLAND

LEGEND: NEOM
A PROPOSED LV CABLE ROUTE IN CONTAINMENT
PROPOSED HDPE ROAD CROSSING BURIED
KINGDOM OF SAUDI ARABIA
DUCT (2x110mm Ø) REGION ASSET CODE CONTRACT CODE
PROPOSED 6x1WAY 200mm DIA BURIED DUCT
13 180001 4800000492
02/03/2023 4:45:48 PM

33kV BACKBONE INFRA NETWORK (BY OTHERS)


PROPOSED STREET LIGHTING / UNDERPASS DRAWING NUMBER
LIGHTING DISTRIBUTION BOARD
668100 E

668200 E

668300 E

668400 E

668500 E
ORIGINATOR DISCIPLINE DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

CH2 INF DRG 161451 B


NEOM-NEN-PRC-010_TMP02_02.00
1 2 3 4 5
GENERAL KEY PLAN:

NOT APPLICABLE FOR THIS PACKAGE


BACKFILL BACKFILL BACKFILL
FGL WARNING TAPE FGL WARNING TAPE FGL WARNING TAPE

300 (MIN)

300 (MIN)

300 (MIN)
BACKFILL BACKFILL

(VARIES)

(VARIES)

(VARIES)
FGL FGL

150

150

150
WARNING TAPE WARNING TAPE
E
300 (MIN)

300 (MIN)
COMPACTED COMPACTED SAND COMPACTED SAND

300

300

300
(VARIES)

(VARIES)
SAND

150

150
HDPE DUCT 200mm Ø HDPE DUCT 110mm Ø HDPE DUCT 110mm Ø
(TYP.) (TYP.) (TYP.)

800

800

800
COMPACTED COMPACTED SAND

300

300

300
300

300
SAND
500

500
HDPE DUCT 200mm Ø HDPE DUCT 110mm Ø
(TYP.) (TYP.)
200

200

200

200

200
NOTES:
1.1.THIS
ALL DIMENSION
DRAWING ISARE
THEINCOPYRIGHT
MM UNLESSOFOTHERWISE STATED.
JACOBS AND MUST NOT BE RETAINED, COPIED OR USED
WITHOUT THE ABOVE CONSULTANT'S AUTHORITY.
2.DUCT BANK AND PULL PIT DIMENSIONS INDICATED HERE ARE TENTATIVE AND SHALL BE UPDATED BY
200 300 300 300 300 300 200 200 300 300 300 200 150 250 250 150 150 250 150 150 250 150 2. DO NOT SCALEIN
CONTRACTOR FROM
SHOPTHE DRAWINGS.
DRAWINGS STAGE IF REQUIRED AS PER SITE CONDITION AND SHALL BE
SUBMITTED FOR APPROVAL TO ENGINEER.
1900 1300 800 550 550 3. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS NOTED OTHERWISE. ALL
DIMENSIONS
3.FINALIZED TO BE DETAIL
DURING VERIFIED ON SITE
DESIGN & APPROVED BY THE ENGINEER.
STAGE.

6x1x200mmØ BURIED 4x2x200mmØ BURIED 3x2x110mmØ BURIED 2x2x110mmØ BURIED 2x1x110mmØ BURIED 4. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT ARCHITECTURAL,
4.UNUSED CABLE ENTRIES SHALL BE SEALED BY PLUGS.
STRUCTURAL, MECHANICAL, ELECTRICAL, AND CIVIL DRAWINGS AND ALL RELEVANT SECTIONS OF
THE SPECIFICATIONS.

D DUCT BANK-DETAIL DUCT BANK-DETAIL DUCT BANK-DETAIL DUCT BANK-DETAIL DUCT BANK-DETAIL 5.THE HDPE CONDUIT SHALL BE SEALED WITH NON FLAMMABLE SEALING COMPOUND.

LV CABLES LV CABLES LV CABLES LV CABLES LV CABLES 6.ELECTRICAL LV NETWORK LAYOUT REFER TO DRAWING NO. 13-180001-4800000492-CH2-INF-DRG-161450
TO 13-180001-4800000492-CH2-INF-DRG-161451.

600x600 CLEAR 800x800 CLEAR


600x600 CLEAR
OPENING OPENING BACKFILL
OPENING
FGL WARNING TAPE

200

200
200

300 (MIN)

(VARIES)
110mm HDPE 110mm HDPE
110mm HDPE

150
DUCTS DUCTS
DUCTS

500

500

500

500
500

500

250 SPLAYED ENDS 250 250 SPLAYED ENDS


250 SPLAYED ENDS
COMPACTED

300
800

SAND
1100

1100
HDPE DUCT 200mm Ø
(TYP.)
300

300
300

300

800
CONCRETE CLASS CONCRETE CLASS
300

CONCRETE CLASS

300
210/20 210/20
210/20
50mm DRAINAGE
150

SLEEVE
300

300

200
BLINDING CONCRETE
CLASS 110/25 50mm DRAINAGE 50mm DRAINAGE
SLEEVE SLEEVE
150

150
50

150 600 150 200 300 300 200


BLINDING CONCRETE BLINDING CONCRETE
CLASS 110/25 CLASS 110/25 1000
SECTION
50

50
150 600 150 150 800 150
CABLE DRAWPIT 3x2x200mmØ BURIED
600x600x800 SECTION SECTION DUCT BANK-DETAIL
CABLE DRAWPIT CABLE DRAWPIT LV CABLES
600x600x1100 800x800x1100

2x110 mm
2x110 mm HDPE DUCTS
2x110 mm FINISHED ROAD/SIDEWALK SURFACE
HDPE DUCTS
HDPE DUCTS
FOR PAVEMENT DETAILS
REFER LANDSCAPE DRAWING

450
2x110mm 2x110mm
2x110mm
HDPE DUCTS HDPE DUCTS
HDPE DUCTS

200
WARNING TAPE

450
BACKFILL

250
600x600 PIT COVER 600x600 PIT COVER FINE SAND
OF HEAVY DUTY OF HEAVY DUTY 800x800 PIT COVER

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF NEOM. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT FROM NEOM.
TYPE TYPE 100 LV CABLE
OF HEAVY DUTY
50mm TYPE (TYP.)
50mm STAGE 3D-TENDERING AND IFC
DRAINAGE SLEEVE 50mm
DRAINAGE SLEEVE
DRAINAGE SLEEVE 1000

PLAN PLAN PLAN B STAGE 3D-TENDERING AND IFC MAF 02.03.23


A STAGE 3B - DEVELOPED DESIGN MAF 23.01.23
CABLE DRAWPIT CABLE DRAWPIT DIRECT BURIED CABLE IN REV DESCRIPTION APP DATE
C
CABLE DRAWPIT PURPOSE OF ISSUE:
600X600X1100 800X800X1100 LV CORRIDOR
600X600X800 FOR APPROVAL
CLIENT: PROJECT MANAGEMENT CONSULTANT:

200 mm FLOOR SLAB


2000x2000 CLEAR HDPE DUCTS FFL
OPENING
C:\Users\paulj\Desktop\NEOM Sindalah Island (electrical)\Logistic Hub\13-180001-4800000492-CH2-INF-DRG-560450.dwg

DESIGN CONSULTANT NAME & LOGO (s): CONTRACTOR NAME & LOGO (s):
200

200mm HDPE
250 300 300 300 300 300 250
300

DUCTS DESIGN SUB-CONSULTANT NAME & LOGO (s):

SPLAYED ENDS
500

CONCRETE CLASS 210/20 200mm

300
B DESIGN CONSULTANT / CONTRACTOR: NEOM'S REVIEW:
HDPE DUCTS CONCRETE/ COMPACTED
1100

DRAWN: RKK 02.03.23


SAND (STRUCTURAL TO CHECKED: PS/PB 02.03.23 CHECKED:
300

300

800
DECIDE) APPROVED: MAF 02.03.23 APPROVED:

300
HDPE DUCT 200mm Ø SCALE: NTS SHEET SIZE: A0
(TYP.) DISCIPLINE NAME:
300

300

200
INFRASTRUCTURE

4800000492/002 - BOH LOGISTIC HUB


150

50mm DRAINAGE SLEEVE


200 300 300 300 300 300 200
BLINDING CONCRETE ELECTRICAL STANDARD DETAILS - LV NETWORK
CLASS 110/25 1900
PROJECT NAME:
50

150 2000 150 4800000492/002 - SINDALAH ISLAND


SECTION A-A BOH LOGISTICS HUB AND SERVICE JETTY
SECTION 13 - SINDALAH ISLAND
6x2x200mmØ LV CABLE DUCT
CABLE DRAWPIT NEOM
50mm (UNDER FLOOR SLAB) - DETAIL
A 2000x2000x1100 DRAINAGE SLEEVE KINGDOM OF SAUDI ARABIA
REGION ASSET CODE CONTRACT CODE

PLAN 13 180001 4800000492


02/03/2023 2:12:20 PM

CABLE DRAWPIT DRAWING NUMBER


ORIGINATOR DISCIPLINE DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

CH2 INF DRG 560450 B


NEOM-NEN-PRC-010_TMP02_02.00
ROAD 1
1 2 3 4 5
GENERAL KEY PLAN:
C4-V06 N N

CL4_ROAD 2
C4-V16
QIBLA

C4-V07 QIBLA

C4-V08

E
C4-V09

UP
C4-V10 LVL 3.120 SHEET-1

UP

HP
AS
E
PH
CB LVL 3.420

LOW SOURCE
AIR
TEM
HP
AS

PER HEAT
L
O

ATU PUM
PO

LOW SOURCE
AIR

RE
TEM
PER HEAT

P
ATU PUM
RE
AS

C4-V11
HP

P
AS
HP

LVL 1.100

UP

LVL 3.120

C
HD

PWS PWS
4 D 3

FT
PWS
12 PWS PWS
2 1 PWS
LVL 3.120
5
PWS
12

PWS

NOTES:
PWS
1A 6
PWS
PWS D 7
PWS
12 9
500X400X250

PWS
PWS
PWS 10
D
H C
11 8
D H PPL
PWS 2
12
D

H
C
PPL

C4-V12
4
PPL
PPL 5
PPL 12
PPL 14 PPL
H
5 19
PPL D
∅300X180H

PPL

C
5 PPL PPL H
PPL 18
C PPL PPL 5 1 16 PPL
PPL

TDF
9 PPL 6 3
17 DRAWER

7 PPL
RAIL

PPL
SPEED

14
CHEST

8
ICE D
PPL

PS
PPL

DEE
STATION

LIAR
PPL 11 16
BLENDER

PPL
10 5
D
300X200X180H

C
H
PPL
PPL 15
13
LVL 3.120
PPL

C
D
3

1. THIS DRAWING IS THE COPYRIGHT OF JACOBS AND MUST NOT BE RETAINED, COPIED OR USED
WITHOUT THE ABOVE CONSULTANT'S AUTHORITY.
PWA
12

PWA PWA ANGLE

LEDGE

13 15
PWA
1A PWA
11
PWA

2. DO NOT SCALE FROM THE DRAWINGS.

C
D
10

H
C PWA PWA
14 9
PWA PWA PWA

FT
D
3 PWA 2 5
PWA
1 PWA
4
8

D
500X400 DH
X250H

D
PWA
C
PWA PWA
7 12
3 PWA
D

H
6
POT
8

FT
D

DH C
PWA
2 POT
1A
PCP PWA

DC
H POT
6 12

H
D
5

∅300X180H

C
POT

H D
PCP 8

D
400X400X200
PCP 3

H
PCP
8 1
PCP POT POT

D
C
4 12 7 POT
C POT
PCP 6 9

D
H
5
POT POT
PCP
4 10
7 POT POT
2 9
PCP
2 POT
1
Cr

Cs
SSF SSF
1

C
9 POT

D
D ICE
POT 11 3
BVS 3

H
SSF

C
3 BVS
8 ICE

D
BVS 2 4 ICE
2 1

H
BVS
3
SSF
3 ICE
BVS SSF SSF 2 CHF
1 10 3
4
BVS SSF

FT
D
3 7 CHF

3. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS NOTED OTHERWISE. ALL
D

SSF 1

3/1
REFRIGERA

6 TED CHF
BVS WELL 2
4
GN

SSF
BVS
5
2 SSF
BVS 4

C D
3/1
1
BAIN-MAR

D
SSF

H
H
IE

400X400X200
FT
D
GN

BVS 2 HPK
BVS

H
3 BVS 2 HPK
4 BVS 3 24
FT
D 1 HPK
BVS 8
HPK
3 BVS BVS 25
BVS 3 6 HPK HPK
3 3 26
HPK HPK

D
22 27
BVS HPK
BVS HPK
BVS 3 1 21 1 HPK
3 28
BVS HPK

D
BVS FT HPK HPK
HPK 10
3 7

GN1/1
3 31
20 HPK HPK HPK HPK
HPK 15
BVS 19 1 23 29
3 BVS HPK
BVS 30 HPK

D
7 HPK HPK HPK
3 BVS BVS 18

ANGLE
33

GN1/1
DIMENSIONS TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.

G
16 22

LEDGE
5 3 BVS
3 HPK

G
HPK 10

ANGLE
BVS HPK HPK

LEDGE
34 6
5 10
C
BVS BVS BVS HPK
3 3 BVS 3 5 HPK HPK

G
HPK 11 1A
8 4 HPK HPK

D
HPK

∅300X180H
HPK

FT
D
BVS HPK 17 33

G
C
1

H D
8
BVS 3 10

400X400X200H
3 SPA HPK HPK

D
SPA 4 HPK
6

CD
8 SPA 14

H
5 12 HPK
SPA
BVS SPA 32
3 6
SPA 2 HPK
7 HPK

ANGLE
BVS 7

LEDGE
5 D SPA 13
BVS 1

D C
H

∅300X180H
3 C HPK
SPA
9

H
D
SPA 9 SPA MPA
11 3 400X400X200H
4 HPK

D H

G
MPA

C
5 33

C
SPA MPA
10 6 MPA
MPA
7 4
MPA MPA HPK
MPA 33
8 1 MPA 6 400X400X200H
HPK

D H
C
MPA 7 33
MPA VPA

D
MPA 9 C
8 2

H
11 MPA MPA

H
12

400X400X200
12
VPA FT VPA
MPA MPA VPA

D
14 4 1A 3
10
ANGLE

MPA
LEDGE
VPA VPA
13
LVL 3.120 VPA
5 11
6

H
VPA

D
MPA 6 5 50

C
H
2 VPA VPA

400X400X200
14

53
MPA 7 6 D

C
VPA

90
VPA

H
3 MPA
11 8 VPA VPA 7
VPA 1
VPA 11
LEDGE

ANGLE 9
MPA D
VPA 12
10

VPA
VPA
10
11 VPA
13
LVL 0.620
15 VPA
14
LEDGE
ANGLE

UP

4. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT ARCHITECTURAL,


VPA
15

LVL 1.620

STRUCTURAL, MECHANICAL, ELECTRICAL, AND CIVIL DRAWINGS AND ALL RELEVANT SECTIONS OF
THE SPECIFICATIONS.
UP

D 5. STREET LIGHTING STANDARD DETAILS REFER TO DRAWING NO.


UP
13-180001-4800000492-CH2-INF-DRG-560500.

6. STREET LIGHTING SINGLE LINE DIAGRAM REFER TO DRAWING NO.


13-180001-4800000492-CH2-INF-DRG-661500.

7. UNDERPASS LIGHTING DETAILS REFER TO DRAWING NO. 13-180001-4800000492-CH2-INF-DRG-161502.

3103400 N 3103400 N

LDB-01/01/04

17.00
LDB-01 / CIRCUIT-1
LDB-01/01/03 4Cx6sqmm Cu/XLPE/SWA/PVC+
1Cx6sqmm Cu/PVC ECC.

16.00
LENGTH FROM FP=130m

LDB-01/01/02

10.0
10.0
LDB-01/01/01 .00
17

10.0
10.0

3103300 N
N1

0
9.0
N15

FREEZER
G00-001B

N2

FFL +4.120 m
SSL +4.020 m
CHILLER
G00-001A

10.0
N14

5.0
RECEIVING
G00-001

LOA
DIN
G
WASH BAY 01

BAY
G00-002

N3
WASH BAY 02
G00-003

FD
REPAIR 01
G00-004

N13

REPAIR 02
G00-005

ELECT.
G00-009

N4

(14 ICT

STA

FD
Nos G00-010

GIN
.)

G
LAN
ES
10.0
N12

FD
1M RR
CO
WID IDO
E R
PARKING &

UTI
STORAGE AREA

LITY
G00-007

CONDENSING
G00-044

10.0
N5

FD
0
N11

600mm(W)x600mm(H)x200mm(D)

60
10
.0

STA Nos
(16

GIN
G
.)
LAN
SLOT IN THE WALL FOR LIGHTING DB-01

ES
FD
0+
E1

UP
D1

D2

.0
10
WASTE COLLECTION
D3 D35 G00-011 CHA

EV
PAR
(20
RG
ING

Nos

KIN
N10

G
.)
BAY

&
D4 S

D5 FD

D6
N6
D7 D34
D8
+4.270 m

D9

D10
E5
D11
E2 D33
FLOOR OPERATION
D12 DESK
G00-008

D13

D32
D14
WORKSHOP
G00-012

D15 D31

BORDER SECURITY
G00-013 D30
D16
MEETING ROOM
G00-016 N7
D29
N9
LOGISTIC HUB +4.270 m
SECURITY DRI D28
VEW
G00-014 D17 AY

D27
10
OFFICE 01
G00-017
.0 D26

OFFICE CORRIDOR
OFFICE 02 D25
G00-019
G00-018
D18

D24
FFL +4.320 m
SSL +4.220 m
TOILET / CHANGING
M.
D23

UP
WC G00-026
G00-026A
E3 D22

UP
CHANGING M. CORRIDOR
WC G00-025
G00-026B
G00-042
D19 E4
N1

LOC
WC

KER
G00-030A

S
ABLUTION M.
G00-024
VESTIBULE
G00-023
TOILET / CHANGING FERRY WAITING
F. JANITOR AREA
G00-030 G00-022 G00-015 D20
INB
VESTIBULE OU

STA
ND
G00-027 ADA TOILET

GIN
G
G00-020B

LOC

LAN
ES
KER
S
CHANGING F. TOILET F.
G00-029 G00-020
FIRST AID ROOM
UPS ABLUTION F. G00-031 WC
G00-035 G00-028 G00-020A N8
D21
WC
G00-021A

SHEET-1

OU GIN
STA
TOILET M.

TBO
UN LAN
DISHWASH AREA G00-021

G
D ES
G00-032
ADA TOILET
G00-021B

PRAYER ROOM
G00-034
MECHANICAL ROOM
G00-038
MECHANICAL ROOM
G00-037 FFL +4.270 m
SSL +4.170 m

TOW
JET

ARD
FFL +4.270 m

TY
SSL +4.170 m

S
SERVER ROOM BOH LOGISTICS
G00-039 STAFF
G00-033

.
AR- NO
2-M ING
CH AW
MTR & GSM

92- DR
G00-040

004 TO
000 ER
REF
-162001 TY
110-48
+4.420 m

DRG 180 JET


FOR
13-
LV ROOM
G00-041

CONDENSING
+4.170 m G00-043

4.270

4.320

UP

3103200 N 3103200 N
0
50
0+

0m 20m 40m 60m 80m 100m

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF NEOM. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT FROM NEOM.
VISUAL SCALE 1:1000 @ A0

STAGE 3D-TENDERING AND IFC

B STAGE 3D-TENDERING AND IFC MAF 02.03.23


A STAGE 3B - DEVELOPED DESIGN MAF 23.01.23
REV DESCRIPTION APP DATE
3103100 N
C PURPOSE OF ISSUE:

FOR APPROVAL
CLIENT: PROJECT MANAGEMENT CONSULTANT:
C:\Users\paulj\Desktop\NEOM Sindalah Island (electrical)\Logistic Hub\13-180001-4800000492-CH2-INF-DRG-161500.dwg

DESIGN CONSULTANT NAME & LOGO (s): CONTRACTOR NAME & LOGO (s):
668100 E

668200 E

668300 E

668400 E

668500 E
DESIGN SUB-CONSULTANT NAME & LOGO (s):

3103000 N

B DESIGN CONSULTANT / CONTRACTOR: NEOM'S REVIEW:


DRAWN: RKK 02.03.23
CHECKED: PS/PB 02.03.23 CHECKED:
APPROVED: MAF 02.03.23 APPROVED:

SCALE: 1:1000 SHEET SIZE: A0


DISCIPLINE NAME:
INFRASTRUCTURE

4800000492/002 - BOH LOGISTIC HUB


STREET/UNDERPASS LIGHTING NETWORK LAYOUT - SHEET INDEX
PROJECT NAME:

LEGEND:
4800000492/002 - SINDALAH ISLAND
4M HIGH SMART STREET LIGHTING POLE WITH BOH LOGISTICS HUB AND SERVICE JETTY
2666LUMEN, 3000K CCT LED FIXTURE
LED FIXTURE WITH 44100 LUMEN, 3000K CCT
13 - SINDALAH ISLAND
D INSTALLED AT 3.50M HIGH (D - DAY FIXTURE)
LED FIXTURE WITH 7000 LUMEN, 3000K CCT
NEOM
A N INSTALLED AT 3.50M HIGH (N - NIGHT FIXTURE)
LED FIXTURE WITH 7000 LUMEN, 3000K CCT
KINGDOM OF SAUDI ARABIA
E INSTALLED AT 3.50M HIGH (E - EMERGENCY FIXTURE) REGION ASSET CODE CONTRACT CODE
PROPOSED STREET LIGHTING CABLE (BURIED)

13 180001 4800000492
02/03/2023 2:26:18 PM

PROPOSED EARTH ROD

CABLE DROPPING
DRAWING NUMBER
PROPOSED LIGHTING DISTRIBUTION BOARD (LDB)
667900 N

668100 N

668300 N

668500 N

668700 N
ORIGINATOR DISCIPLINE DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

CH2 INF DRG 161500 B


NEOM-NEN-PRC-010_TMP02_02.00
1 2 3 4 5
GENERAL KEY PLAN:
N

N QIBLA

QIBLA
3103400 N

SHEET-1

NOTES:
1. THIS DRAWING IS THE COPYRIGHT OF JACOBS AND MUST NOT BE RETAINED, COPIED OR USED
WITHOUT THE ABOVE CONSULTANT'S AUTHORITY.

2. DO NOT SCALE FROM THE DRAWINGS.

3. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS NOTED OTHERWISE. ALL
DIMENSIONS TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.

LDB-01/01/04 4. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT ARCHITECTURAL,
STRUCTURAL, MECHANICAL, ELECTRICAL, AND CIVIL DRAWINGS AND ALL RELEVANT SECTIONS OF
THE SPECIFICATIONS.

D 5. STREET LIGHTING STANDARD DETAILS REFER TO DRAWING NO.

17.00
13-180001-4800000492-CH2-INF-DRG-560500.

6. STREET LIGHTING SINGLE LINE DIAGRAM REFER TO DRAWING NO.


13-180001-4800000492-CH2-INF-DRG-661500.
LDB-01 / CIRCUIT-1
LDB-01/01/03 4Cx6sqmm Cu/XLPE/SWA/PVC+ 7. UNDERPASS LIGHTING DETAILS REFER TO DRAWING NO. 13-180001-4800000492-CH2-INF-DRG-161502.
1Cx6sqmm Cu/PVC ECC.

16.00
LENGTH FROM FP=130m

LDB-01/01/02

10.0
10.0
LDB-01/01/01 .0
0
17

10.0
10.0

3103300 N
N1

0
9.0
N15

FREEZER
G00-001B

N2

FFL +4.120 m
SSL +4.020 m
CHILLER
G00-001A

10.0
N14

5.0
RECEIVING
G00-001

LO
AD
IN
G
WASH BAY 01

BA
Y
G00-002

N3
WASH BAY 02
G00-003

FD
REPAIR 01
G00-004

N13

REPAIR 02
G00-005

ELECT.
G00-009

N4

ICT

ST 4 N
(1

FD
AG os
G00-010

IN .)
G
LA
N
ES
10.0
N12 FD

1M RR
CO
W ID
ID O
E R
PARKING &

UT
IL
STORAGE AREA

IT
Y
G00-007

CONDENSING
G00-044

10.0
N5

FD

0
N11

10
600mm(W)x600mm(H)x200mm(D)

60
.0

ST 6 N
(1
AG os
IN .)
G
LA
SLOT IN THE WALL FOR LIGHTING DB-01

N
ES
FD
0+ E1

U
P
D1

D2

0
.
10
WASTE COLLECTION
D3 D35 CH

EV
G00-011
AR

PA
(2
G

R
0
IN

KI
N
G

N
os
N10

G
BA

.)

&
YS
D4

D5 FD

D6
N6
D7 D34
D8
+4.270 m

D9

D10
E5
FOR UNDERPASS LIGHTING DETAILS
D11
E2
D12

D13
D33
FLOOR OPERATION
DESK
G00-008
REFER TO DRAWING NO.
WORKSHOP
G00-012
D14
D32
13-180001-4800000492-CH2-INF-DRG-161502
D15 D31

BORDER SECURITY
G00-013 D30
D16
MEETING ROOM
G00-016 N7
D29
N9
LOGISTIC HUB +4.270 m
SECURITY D28

D
R
D17

IV
G00-014

EW
AY
D27
10
OFFICE 01
G00-017
.0 D26

OFFICE CORRIDOR
OFFICE 02 D25
G00-019
G00-018
D18

D24
FFL +4.320 m
SSL +4.220 m
TOILET / CHANGING
M.
D23
U
P

WC G00-026
G00-026A
E3 D22
U
P

CHANGING M. CORRIDOR
WC G00-025
G00-026B
G00-042
D19 E4
N1
LO

WC
C
KE

G00-030A
R
S

ABLUTION M.
G00-024
VESTIBULE
G00-023
TOILET / CHANGING FERRY WAITING
F. JANITOR AREA
G00-030 G00-022 G00-015 D20

IN
VESTIBULE

BO IN
ST

U G
AG
G00-027 ADA TOILET

N LA
D
G00-020B
LO

N
CK

ES
ER
S

CHANGING F. TOILET F.
G00-029 G00-020
FIRST AID ROOM
UPS ABLUTION F. WC
G00-035 G00-028
G00-031
G00-020A
N8
D21
WC
G00-021A

O
UT AG
ST
TOILET M.

BO ING
UN LA
G00-021
DISHWASH AREA

D N
G00-032

ES
ADA TOILET
G00-021B

PRAYER ROOM
G00-034
MECHANICAL ROOM
G00-038
MECHANICAL ROOM
G00-037 FFL +4.270 m
SSL +4.170 m

TO
W

JE
AR

TT
FFL +4.270 m DS

Y
SSL +4.170 m

SERVER ROOM BOH LOGISTICS


G00-039 STAFF
G00-033
.
- NO
AR G
2- IN
H AW

MTR & GSM


M
-C R
92 D

G00-040
04 TO
0 00 ER
11 48 EF
00
62 1- Y R
R 80 TT

+4.420 m
D -1 JE
G 00
13 R
FO

-1

LV ROOM
G00-041

CONDENSING
+4.170 m G00-043

4.270

4.320

UP

3103200 N

0m 10m 20m 30m 40m 50m

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF NEOM. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT FROM NEOM.
VISUAL SCALE 1:500 @ A0

STAGE 3D-TENDERING AND IFC


0
50
0+

B STAGE 3D-TENDERING AND IFC MAF 02.03.23


A STAGE 3B - DEVELOPED DESIGN MAF 23.01.23
REV DESCRIPTION APP DATE
C PURPOSE OF ISSUE:

FOR APPROVAL
CLIENT: PROJECT MANAGEMENT CONSULTANT:
C:\Users\paulj\Desktop\NEOM Sindalah Island (electrical)\Logistic Hub\13-180001-4800000492-CH2-INF-DRG-161501.dwg

DESIGN CONSULTANT NAME & LOGO (s): CONTRACTOR NAME & LOGO (s):

DESIGN SUB-CONSULTANT NAME & LOGO (s):

B DESIGN CONSULTANT / CONTRACTOR: NEOM'S REVIEW:


DRAWN: RKK 02.03.23

3103100 N CHECKED: PS/PB 02.03.23 CHECKED:


APPROVED: MAF 02.03.23 APPROVED:

SCALE: 1:500 SHEET SIZE: A0


DISCIPLINE NAME:
INFRASTRUCTURE

4800000492/002 - BOH LOGISTIC HUB


STREET/UNDERPASS LIGHTING NETWORK LAYOUT - SHEET 01
PROJECT NAME:

LEGEND:
4800000492/002 - SINDALAH ISLAND
4M HIGH SMART STREET LIGHTING POLE WITH BOH LOGISTICS HUB AND SERVICE JETTY
2666LUMEN, 3000K CCT LED FIXTURE
LED FIXTURE WITH 44100 LUMEN, 3000K CCT
13 - SINDALAH ISLAND
D INSTALLED AT 3.50M HIGH (D - DAY FIXTURE)
LED FIXTURE WITH 7000 LUMEN, 3000K CCT
NEOM
A N INSTALLED AT 3.50M HIGH (N - NIGHT FIXTURE)
LED FIXTURE WITH 7000 LUMEN, 3000K CCT
KINGDOM OF SAUDI ARABIA
E INSTALLED AT 3.50M HIGH (E - EMERGENCY FIXTURE) REGION ASSET CODE CONTRACT CODE
PROPOSED STREET LIGHTING CABLE (BURIED)

13 180001 4800000492
02/03/2023 2:07:11 PM

PROPOSED EARTH ROD

CABLE DROPPING
DRAWING NUMBER
668100 E

668200 E

668300 E

668400 E

668500 E
PROPOSED LIGHTING DISTRIBUTION BOARD (LDB) ORIGINATOR DISCIPLINE DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

CH2 INF DRG 161501 B


NEOM-NEN-PRC-010_TMP02_02.00
1 2 3 4 5

6
GENERAL KEY PLAN:
N

FD

FD
QIBLA
0+

0+
E1 E1

U
P

P
D1 D1

E .0 D2 D2

.0
10

10
WASTE COLLECTION WASTE COLLECTION
D3 D35 D3 D35

EV HA No

EV HA No
G00-011 G00-011

C 0

C 0
PA RG .)

PA RG .)
(2

(2
R I NG

R I NG
KI

KI
N BA

N BA
s

s
G Y

G Y
N10 N10 SHEET-1

& S

& S
D4 D4

D5 D5

FD

FD
D6 D6
N6 N6
D7 D7 NOTES:
D34 D34
D8 D8 1. THIS DRAWING IS THE COPYRIGHT OF JACOBS AND MUST NOT BE RETAINED, COPIED OR USED
+4.270 m +4.270 m
WITHOUT THE ABOVE CONSULTANT'S AUTHORITY.
D9 D9
2. DO NOT SCALE FROM THE DRAWINGS.
D10 D10
E5 E5 3. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS NOTED OTHERWISE. ALL
D11 D11 DIMENSIONS TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.
E2 D33 E2 D33
FLOOR OPERATION FLOOR OPERATION
D12 DESK
D12 DESK
4. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT ARCHITECTURAL,
G00-008 G00-008 STRUCTURAL, MECHANICAL, ELECTRICAL, AND CIVIL DRAWINGS AND ALL RELEVANT SECTIONS OF
THE SPECIFICATIONS.
D13 D13
D 5. SPECIALIST LIGHTING CONTRACTOR SHALL FURTHER DEVELOP CONTROL PHILOSOPHY AND TUNNEL
D32 D32 LIGHTING NETWORK AS PER FINAL SELECTED PRODUCTS.
D14 D14
WORKSHOP WORKSHOP
G00-012 G00-012 6. STREET/ UNDERPASS LIGHTING LAYOUT REFER TO DRAWING NO.
13-180001-4800000492-CH2-INF-DRG-161500 AND 13-180001-4800000492-CH2-INF-DRG-161501.
D15 D31 D15 D31
7. STREET/ UNDERPASS LIGHTING SINGLE LINE DIAGRAM REFER TO DRAWING NO.
13-180001-4800000492-CH2-INF-DRG-661500.
BORDER SECURITY BORDER SECURITY
G00-013 D30 G00-013 D30
D16 D16
MEETING ROOM MEETING ROOM
G00-016 N7 G00-016 N7
D29 D29
N9 N9
LOGISTIC HUB +4.270 m LOGISTIC HUB +4.270 m
SECURITY D
R
D28 SECURITY D
R
D28
IV IV
G00-014 D17 EW
AY
G00-014 D17 EW
AY

D27 D27
10
OFFICE 01 10
OFFICE 01
.0
G00-017
D26
G00-017
. 0 D26

OFFICE CORRIDOR
OFFICE 02 D25 OFFICE CORRIDOR
OFFICE 02 D25
G00-019
G00-018
D18 G00-019
G00-018
D18

D24 D24
FFL +4.320 m FFL +4.320 m
SSL +4.220 m SSL +4.220 m
TOILET / CHANGING
M.
U
P
D23 TOILET / CHANGING
M.
U
P
D23
G00-026 G00-026

E3 D22 E3 D22
U

U
P

P
CHANGING M. CORRIDOR CHANGING M. CORRIDOR
G00-025 G00-025
G00-042
D19 E4
N1 G00-042
D19 E4
N1
LO

LO
C

C
KE

KE
R

R
S

S
ABLUTION M. ABLUTION M.
G00-024 G00-024
VESTIBULE VESTIBULE
G00-023 G00-023
FERRY WAITING FERRY WAITING
JANITOR AREA JANITOR AREA
G00-022 G00-015 D20 G00-022 G00-015 D20

IN TA

IN TA
VESTIBULE VESTIBULE

BO GI

BO GI
S

S
U NG

U NG
G00-027 ADA TOILET G00-027 ADA TOILET

N L

N L
D A

D A
G00-020B G00-020B

N
ES

ES
TOILET F. TOILET F.
G00-020 G00-020
FIRST AID ROOM FIRST AID ROOM
WC WC
G00-031
G00-020A
N8 G00-031
G00-020A
N8
D21 D21
WC WC
G00-021A G00-021A
O TA

O TA
U G

U G
S

S
TOILET M. TOILET M.
TB IN

TB IN
O G

O G
U LA

U LA
G00-021 G00-021
N

N
DISHWASH AREA DISHWASH AREA
D NE

D NE
G00-032 G00-032
ADA TOILET ADA TOILET
S

S
G00-021B G00-021B

PRAYER ROOM PRAYER ROOM


G00-034 G00-034
MECHANICAL ROOM MECHANICAL ROOM
G00-038 G00-038

FFL +4.270 m FFL +4.270 m


SSL +4.170 m SSL +4.170 m

TO ETT

TO ETT
J

J
W Y

W Y
AR

AR
D

D
S

S
SERVER ROOM BOH LOGISTICS SERVER ROOM BOH LOGISTICS
G00-039 STAFF G00-039 STAFF
G00-033 G00-033

PLAN (LIGHTING LAYOUT DAY TIME) PLAN (LIGHTING LAYOUT NIGHT TIME) 0m 2m 4m 6m 8m 10m

SCALE 1:100 SCALE 1:100

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF NEOM. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT FROM NEOM.
VISUAL SCALE 1:100 @ A0

STAGE 3D-TENDERING AND IFC


Configuration PC

A STAGE 3D-TENDERING AND IFC MAF 02.03.23


REV DESCRIPTION APP DATE
C PURPOSE OF ISSUE:
UPS FOR APPROVAL
Digital
Master inputs/outputs CLIENT: PROJECT MANAGEMENT CONSULTANT:
SCADA Control Unit
Client
Ethernet for I/O
R MCU RS-485 repeater
optional
RS-485 repeater R
optional
C:\Users\paulj\Desktop\NEOM Sindalah Island (electrical)\Logistic Hub\13-180001-4800000492-CH2-INF-DRG-161502.dwg

DESIGN CONSULTANT NAME & LOGO (s): CONTRACTOR NAME & LOGO (s):
RS-485 Ring Bus 1 RS-485 Ring Bus 2
Portal photometers
max. 4/MCU
R
DESIGN SUB-CONSULTANT NAME & LOGO (s):
DALI group LEGEND
RS-485
repeater Gateways (DGGs) Interior zone light sensor OPERATION MODE
optional max. 250 DGGs/MCU max. 4/Bore, 8/MCU SYMBOL SYMBOL
B DAY NIGHT EMERGENCY DESIGN CONSULTANT / CONTRACTOR: NEOM'S REVIEW:
LED FIXTURE WITH 44100 LUMEN, 3000K CCT DRAWN: RKK 02.03.23
DALI LED D INSTALLED AT 3.50M HIGH (D - DAY FIXTURE) - - CHECKED: PS/PB 02.03.23 CHECKED:
LUX LUX LUX LUX
Luminaires Max. 60 drives / DGG driver panel
LED FIXTURE WITH 7000 LUMEN, 3000K CCT APPROVED: MAF 02.03.23 APPROVED:
N INSTALLED AT 3.50M HIGH (N - NIGHT FIXTURE) -
LED FIXTURE WITH 7000 LUMEN, 3000K CCT SCALE: 1:100 SHEET SIZE: A0
E INSTALLED AT 3.50M HIGH (E - EMERGENCY FIXTURE) DISCIPLINE NAME:
INFRASTRUCTURE

AS PER SASO, CIE 88 STANDARD, UNDERPASS LENGTH OF 25M - 75M (WITH EXIT IS NOT VISIBLE VIEWING FROM 4800000492/002 - BOH LOGISTIC HUB
Driver STOPPING DISTANCE) SHALL BE CONSIDERED AS A SHORT TUNNEL WITH 50% OF THRESHOLD ZONE ILLUMINANCE
LED panel AT THE TUNNEL ENTRANCE ZONE. UNDERPASS LIGHTING DETAILS
Local DALI can be up PROJECT NAME:
sub-networks to 100m LEGEND : (CONTROL PHILOSOPHY) THRESHOLD ZONE ILLUMINANCE LTH- 158 Cd/m² 4800000492/002 - SINDALAH ISLAND
DRIVER TO LED PANEL CABLE (max. 100m) STOPPING DISTANCE SD - 17M BOH LOGISTICS HUB AND SERVICE JETTY
RS-485 CABLE (max. 1000m BEFORE REPEATER NEEDED) ILLUMINANCE AT TUNNEL ENTRANCE ZONE - 50% OF LTH = 79 Cd/m²
13 - SINDALAH ISLAND
DALE CABLE (max. 300m / DGG) ILLUMINANCE AT TRANSITION ZONE - 29 Cd/m²
NEOM
ETHERNET UTP CABLE (max. 100m) ILLUMINANACE AT INTERIOR ZONE = 3 Cd/m²
A
SCADA MODBUS OVER SERIAL OR ETHERNET UTP CABLE ILLUMINANCE AT NIGHT TIME - 2 Cd/m² KINGDOM OF SAUDI ARABIA
MINIMUM AVERAGE LUX LEVEL AT EMERGENCY CONDITION, Eav = 10 Lux REGION ASSET CODE CONTRACT CODE

13 180001 4800000492
02/03/2023 2:17:31 PM

UNDERPASS/TUNNEL LIGHTING CONTROL PHILOSOPHY (TYPICAL) DRAWING NUMBER


ORIGINATOR DISCIPLINE DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

SCALE : NTS CH2 INF DRG 161502 A


NEOM-NEN-PRC-010_TMP02_02.00
1 2 3 4 5
GENERAL KEY PLAN:

NOTES:
1.1. THIS
THISDRAWING
DRAWING ISISTHE
THECOPYRIGHT
COPYRIGHTOF JACOBS AND MUST
OF JACOBS ANDNOT BE RETAINED,
MUST COPIED OR USED
NOT BE RETAINED, WITHOUT
COPIED THE ABOVE
OR USED
CONSULTANT'S AUTHORITY.
WITHOUT THE ABOVE CONSULTANT'S AUTHORITY.
2. ALL DIMENSIONS ARE IN MILIMETERS AND LEVELS ARE IN METER UNLESS NOTED OTHERWISE.
3. GROUNDING SYSTEM MATERIALS CONDUCTORS AND RODS SHALL BE AS REQUIRED BY SPECIFICATIONS.
2. DO NOT SCALE FROM THE DRAWINGS.
4. LIGHTING POLE SHALL BE STEEL, DOUBLE HOT DIP GALVANIZED INSIDE AND OUTSIDE.
5. LIGHTING POLE SHOULD BE GROUNDED BY GROUNDING WIRE TO 16mm DIA. GROUNDING ROD, L= 1.5m AS REQUIRED.
3. ALL
ALLDIMENSIONS ARE
JOINTING OF THE IN MILLIMETERS
GROUNDING AND LEVELS
SYSTEM SHALL BE DONEIN METERS
USING UNLESS
EXOTHERMIC NOTED OTHERWISE. ALL
WELDING.
DIMENSIONS TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.
6. USE ARMOUR OF THE CABLES AS EARTHING CONDUCTOR AND CONNECT THEM WITH THE EARTHING TERMINALS IN THE
P0LE.
4.7. THIS
THEDRAWING SHOULD
CONTRACTOR SHOULDBE READA IN
SUBMIT CONJUNCTION
STREET WITH
LIGHTING POLE OTHER RELEVANT
FOUNDATION ARCHITECTURAL,
AS PER MANUFACTURER
RECOMMENDATIONS.
STRUCTURAL, MECHANICAL, ELECTRICAL, AND CIVIL DRAWINGS AND ALL RELEVANT SECTIONS OF
8. UNUSED CABLE ENTRIES SHALL BE SEALED BY PLUGS.
THE SPECIFICATIONS.
9. THE uPVC CONDUIT SHALL BE SEALED WITH NON FLAMMABLE SEALING COMPOUND.
D 10. ALL SUPPORT MATERIALS AND ITS COATING SHALL BE SUITABLE FOR SEVERE CORROSIVE ENVIRONMENT AND MARINE
GRADE REQUIREMENTS.
11. ALL DIMENSION SHOWN ARE TENTATIVE WILL BE FINALIZED AFTER GETTING FINAL VENDOR DATA.
12. POLE FOUNDATION DETAILS PROVIDED IN THE DRAWING ARE FOR REFERENCE ONLY. CONTRACTOR SHALL PREPARE
DETAIL STRUCTURAL CALCULATION FOR THE POLE FOUNDATION AS PER AUTHORITY REQUIREMENT AND SECURE
APPROVAL FROM AUTHORITY / ENGINEER PRIOR TO THE INSTALLATION ON SITE.
13. STREET LIGHTING LAYOUT REFER TO DRAWING NO. 13-180001-4800000492-CH2-INF-DRG-161500 TO
13-180001-4800000492-CH2-INF-DRG-161501.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF NEOM. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT FROM NEOM.
STAGE 3D-TENDERING AND IFC

CONCRETE COVER WITH B STAGE 3D-TENDERING AND IFC MAF 02.03.23


A STAGE 3B - DEVELOPED DESIGN MAF 23.01.23
INSCRIPTION "GROUNDING PIT" REV DESCRIPTION APP DATE
C PURPOSE OF ISSUE:
Ø350
FOR APPROVAL
65 Ø220 65 CLIENT: PROJECT MANAGEMENT CONSULTANT:

90
BACKFILL SOIL
C:\Users\paulj\Desktop\NEOM Sindalah Island (electrical)\Logistic Hub\13-180001-4800000492-CH2-INF-DRG-560500.dwg

DESIGN CONSULTANT NAME & LOGO (s): CONTRACTOR NAME & LOGO (s):

60

250
PROTECTIVE COVER
FILLED WITH GREASE
CONCRETE HOUSING
DESIGN SUB-CONSULTANT NAME & LOGO (s):
100

GRAVEL FILLING
B DESIGN CONSULTANT / CONTRACTOR: NEOM'S REVIEW:
DRAWN: RKK 02.03.23
CHECKED: PS/PB 02.03.23 CHECKED:
Ø120
90 90 APPROVED: MAF 02.03.23 APPROVED:
Ø300

SCALE: NTS SHEET SIZE: A0


DISCIPLINE NAME:
INFRASTRUCTURE

4800000492/002 - BOH LOGISTIC HUB


COPPER STEEL GROUNDING ROD
PURE COPPER 16mm DIA., 1.5m LONG STANDARD DETAILS - STREET LIGHTING
GROUNDING PLATE PROJECT NAME:

600x600x4mm 4800000492/002 - SINDALAH ISLAND


BOH LOGISTICS HUB AND SERVICE JETTY
13 - SINDALAH ISLAND
GROUNDING PIT FOR LIGHTING PANEL NEOM
A
& MDB KINGDOM OF SAUDI ARABIA
REGION ASSET CODE CONTRACT CODE

13 180001 4800000492
02/03/2023 2:11:41 PM

DRAWING NUMBER
ORIGINATOR DISCIPLINE DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

CH2 INF DRG 560500 B


NEOM-NEN-PRC-010_TMP02_02.00
1 2 3 4 5
GENERAL KEY PLAN:

SUPPLY FROM
ELECTRICAL ROOM AT
LOGISTIC HUB
4Cx16mm² Al, XLPE/SWA/PVC
1Cx16mm2 Y/G.

NOTES:
LIGHTING DB-01 1. THIS DRAWING IS THE COPYRIGHT OF JACOBS AND MUST NOT BE RETAINED, COPIED OR USED

T.C.L.=13.33 kVA WITHOUT THE ABOVE CONSULTANT'S AUTHORITY.

DEMAND LOAD = 12.06 kVA 2. DO NOT SCALE FROM THE DRAWINGS.


63A TPN
R B Y 3. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS NOTED OTHERWISE. ALL
MCCB DIMENSIONS TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.

4. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT ARCHITECTURAL,


STRUCTURAL, MECHANICAL, ELECTRICAL, AND CIVIL DRAWINGS AND ALL RELEVANT SECTIONS OF
THE SPECIFICATIONS.
A ASS
D 5. THIS DRAWING IS THE COPYRIGHT OF JACOBS AND MUST NOT BE RETAINED, COPIED OR USED
0-30A WITHOUT THE ABOVE CONSULTANT'S AUTHORITY.
FUSE
6. CIRCUIT BREAKING RATINGS, CABLE SIZES, BUS BAR RATING ETC. INDICATED IN THE SINGLE LINE
V VSS DIAGRAM ARE TENTATIVE AND SHALL BE FINALIZED DURING DETAIL DESIGN STAGE.

0-500V 7. LIGHTING DISTRIBUTION BOARD (LDB) SHALL BE SUITABLE FOR OUTDOOR INSTALLATION WITH IP65
PROTECTION.
8. STREET/UNDERPASS LIGHTING NETWORK LAYOUTS REFER TO DRAWING NO.
13-180001-4800000492-CH2-INF-DRG-161500 TO 13-180001-4800000492-CH2-INF-DRG-161502.

LEGENDS AND ABBREVIATIONS :


4M HIGH SMART STREET LIGHTING POLE WITH
2666LUMEN, 3000K CCT LED FIXTURE
63A, 400V, Cu BUS BAR, 3 PH, 4W LED FIXTURE WITH 44100 LUMEN, 3000K CCT
D
INSTALLED AT 3.50M HIGH (D - DAY FIXTURE)
RYB1 RYB2 RYB3 RYB4 RYB5 RYB6 RYB7 RYB8 LED FIXTURE WITH 7000 LUMEN, 3000K CCT
N
INSTALLED AT 3.50M HIGH (N - NIGHT FIXTURE)
LED FIXTURE WITH 7000 LUMEN, 3000K CCT
E
INSTALLED AT 3.50M HIGH (E - EMERGENCY FIXTURE)
16A TPN 16A TPN 16A TPN 16A TPN 16A TPN 16A TPN 16A TPN 16A TPN PROPOSED EARTH ROD
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB
MOULDED CASE AIR CIRCUIT BREAKER (MCCB)

MINIATURE CIRCUIT BREAKER (MCB)

INDICATION LAMP
SPARE
(1.27 kVA) A AMMETER

ASS VSS AMPERE / VOLT SELECTOR SWITCH


CIRCUIT-1 CIRCUIT-2 CIRCUIT-3 CIRCUIT-4 CIRCUIT-5 CIRCUIT-6 CIRCUIT-8
FUSE

3 PH + N
4Cx6mm² Cu, XLPE/SWA/PVC 1 PH + N
1Cx6mm² Y/G EP - EARTH PIT
TPN - TRIPLE POLE NEUTRAL
KVA - KILO VOLT AMPERE
DB - DISTRIBUTION BOARD
01/01 D35 D1 D2 N5 N11 R - RED, Y - YELLOW, B - BLUE
4Cx6mm² Al, XLPE/SWA/PVC
1Cx6mm2 Y/G.
01/02 D3 D4
N10 N4 N12

01/03
D34 D5 D6 N3 N13
UPS DB WITH BATTERY BACKUP
01/04
D33 N6 D7 N2 N14
T.C.L.=1 kVA
DEMAND LOAD =0.725 kVA 16A TPN
MCCB
D32 D8 D9 N1 N15

16A, 400V, Cu BUS BAR, 3 PH, 4W

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF NEOM. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT FROM NEOM.
D31 D10 D11
R Y B

D30 D12 D13 STAGE 3D-TENDERING AND IFC


6A 2P 6A 2P 6A 2P 6A 2P
MCB MCB MCB MCB
D29 D14 D15
B STAGE 3D-TENDERING AND IFC MAF 02.03.23
A STAGE 3B - DEVELOPED DESIGN MAF 23.01.23
REV DESCRIPTION APP DATE
N9 D16 N7 PURPOSE OF ISSUE:
C
FOR APPROVAL
D28 D17 D18 CLIENT: PROJECT MANAGEMENT CONSULTANT:
SPARE SPARE
(0.15 kVA) (0.125 kVA)
D27 D19 D20

CIRCUIT-1 CIRCUIT-2
D26 N8 D21

2Cx4mm² Cu, XLPE/SWA/PVC


D25 1Cx4mm² ECC
C:\Users\paulj\Desktop\NEOM Sindalah Island (electrical)\Logistic Hub\13-180001-4800000492-CH2-INF-DRG-661500.dwg

E5 DESIGN CONSULTANT NAME & LOGO (s): CONTRACTOR NAME & LOGO (s):

D24
E4
DESIGN SUB-CONSULTANT NAME & LOGO (s):
D23 TO THE
E3 UNDERPASS /
TUNNEL LIGHTING
D22 CONTROLLER
B E2 (MCU) DESIGN CONSULTANT / CONTRACTOR: NEOM'S REVIEW:
DRAWN: RKK 02.03.23
(0.50 kVA)
CHECKED: PS/PB 02.03.23 CHECKED:
E1 APPROVED: MAF 02.03.23 APPROVED:

SCALE: NTS SHEET SIZE: A0


DISCIPLINE NAME:
INFRASTRUCTURE

4800000492/002 - BOH LOGISTIC HUB


TOTAL LOAD (IN kVA) 0.091 4.21 3.03 3.28 0.225 0.225 0.225
SINGLE LINE DIAGRAM FOR STREET/UNDERPASS LIGHTING
PROJECT NAME:

4800000492/002 - SINDALAH ISLAND


BOH LOGISTICS HUB AND SERVICE JETTY
13 - SINDALAH ISLAND
NEOM
A
KINGDOM OF SAUDI ARABIA
REGION ASSET CODE CONTRACT CODE

13 180001 4800000492
02/03/2023 2:09:34 PM

DRAWING NUMBER
ORIGINATOR DISCIPLINE DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

CH2 INF DRG 661500 B


NEOM-NEN-PRC-010_TMP02_02.00
ROAD 1
1 2 3 4 5
(REF TO GOLF COURSE PACKAGE) GENERAL KEY PLAN:
C4-V06 N N

CL4_ROAD 2
C4-V16
QIBLA

C4-V07 QIBLA

C4-V08

E
C4-V09

UP
C4-V10 LVL 3.120 SHEET-1

FP-GBS-01-01
UP

HP
AS
E
PH
CB LVL 3.420

LOW SOURCE
AIR
IS

TEM
HP
AS

PER HEAT
L
O
INDUSTRIAL SWITCH CABINET 15

ATU PUM
PO

LOW SOURCE
AIR

RE
TEM
PER HEAT

P
ATU PUM
RE
AS

C4-V11
HP

P
AS
HP

LVL 1.100

UP

LVL 3.120

C
HD

PWS PWS
4 D 3

FT
PWS
12 PWS PWS
2 1 PWS
LVL 3.120
5
PWS
12

PWS

NOTES:
PWS
1A 6
PWS
PWS D 7
PWS
12 9
500X400X250

PWS
PWS
PWS 10
D
H C
11 8
D H PPL
PWS 2
12
D

H
C
PPL

C4-V12
4
PPL
PPL 5
PPL 12
PPL 14 PPL
H
5 19
PPL D
∅300X180H

PPL

C
5 PPL PPL H
PPL 18
C PPL PPL 5 1 16 PPL
PPL

TDF
9 PPL 6 3
17 DRAWER

7 PPL
RAIL

PPL
SPEED

14
CHEST

8
ICE D
PPL

PS
PPL

DEE
STATION

LIAR
PPL 11 16
BLENDER

PPL
10 5
D
300X200X180H

C
H
PPL
PPL 15
13
LVL 3.120
PPL

C
D
3

1. THIS DRAWING IS THE COPYRIGHT OF JACOBS AND MUST NOT BE RETAINED, COPIED OR USED
WITHOUT THE ABOVE CONSULTANT'S AUTHORITY.
PWA
12

PWA PWA ANGLE

LEDGE

13 15
PWA
1A PWA
11
PWA

2. DO NOT SCALE FROM THE DRAWINGS.

C
D
10

H
C PWA PWA
14 9
PWA PWA PWA

FT
D
3 PWA 2 5
PWA
1 PWA
4
8

D
500X400 DH
X250H

D
PWA
C
PWA PWA
7 12
3 PWA
D

H
6
POT
8

FT
D

DH C
PWA
2 POT
1A
PCP PWA

DC
H POT
6 12

H
D
5

∅300X180H

C
POT

H D
PCP 8

D
400X400X200
PCP 3

H
PCP
8 1
PCP POT POT

D
C
4 12 7 POT
C POT
PCP 6 9

D
H
5
POT POT
PCP
4 10

IS
7 POT POT
2 9
PCP
2 POT

INDUSTRIAL SWITCH CABINET 20


1
Cr

Cs
SSF SSF
1

C
9 POT

D
D ICE
POT 11 3
BVS 3

H
SSF

C
3 BVS
8 ICE

D
BVS 2 4 ICE
2 1

H
BVS
3
SSF
3 ICE
BVS SSF SSF 2 CHF
1 10 3
4
BVS SSF

FT
D
3 7 CHF

3. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS NOTED OTHERWISE. ALL
D

SSF 1

3/1
REFRIGERA

6 TED CHF
BVS WELL 2
4
GN

SSF
BVS
5
2 SSF
BVS 4

C D
3/1
1
BAIN-MAR

D
SSF

H
H
IE

400X400X200
FT
D
GN

BVS 2 HPK
BVS

H
3 BVS 2 HPK
4 BVS 3 24
FT
D 1 HPK
BVS 8
HPK
3 BVS BVS 25
BVS 3 6 HPK HPK
3 3 26
HPK HPK

D
22 27
BVS HPK
BVS HPK
BVS 3 1 21 1 HPK
3 28
BVS HPK

D
BVS FT HPK HPK
HPK 10
3 7

GN1/1
3 31
20 HPK HPK HPK HPK
HPK 15
BVS 19 1 23 29
3 BVS HPK
BVS 30 HPK

D
7 HPK HPK HPK
3 BVS BVS 18

ANGLE
33

GN1/1
DIMENSIONS TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.

G
16 22

LEDGE
5 3 BVS
3 HPK

G
HPK 10

ANGLE
BVS HPK HPK

LEDGE
34 6
5 10
C
BVS BVS BVS HPK
3 3 BVS 3 5 HPK HPK

G
HPK 11 1A
8 4 HPK HPK

D
HPK

∅300X180H
HPK

FT
D
BVS HPK 17 33

G
C
1

H D
8
BVS 3 10

400X400X200H
3 SPA HPK HPK

D
SPA 4 HPK
6

CD
8 SPA 14

H
5 12 HPK
SPA
BVS SPA 32
3 6
SPA 2 HPK
7 HPK

ANGLE
BVS 7

LEDGE
5 D SPA 13
BVS 1

D C
H

∅300X180H
3 C HPK
SPA
9

H
D
SPA 9 SPA MPA
11 3 400X400X200H
4 HPK

D H

G
MPA

C
5 33

C
SPA MPA
10 6 MPA
MPA
7 4
MPA MPA HPK
MPA 33
8 1 MPA 6 400X400X200H
HPK

D H
C
MPA 7 33
MPA VPA

D
MPA 9 C
8 2

H
11 MPA MPA

H
12

400X400X200
12
VPA FT VPA
MPA MPA VPA

D
14 4 1A 3
10
ANGLE

MPA
LEDGE
VPA VPA
13
LVL 3.120 VPA
5 11
6

H
VPA

D
MPA 6 5 50

C
H
2 VPA VPA

400X400X200
14

53
MPA 7 6 D

C
VPA

90
VPA

H
3 MPA
11 8 VPA VPA 7
VPA 1
VPA 11
LEDGE

ANGLE 9
MPA D
VPA 12
10

VPA
VPA
10
11 VPA
13
LVL 0.620
15 VPA
14
LEDGE
ANGLE

UP

4. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT ARCHITECTURAL,


VPA
15

LVL 1.620

STRUCTURAL, MECHANICAL, ELECTRICAL, AND CIVIL DRAWINGS AND ALL RELEVANT SECTIONS OF
THE SPECIFICATIONS.
UP

D 5.ALL DUCTS LAID UNDER THE CARRIAGEWAY SHALL BE CONCRETE PROTECTED.


UP

6.ALL LEAD-IN DUCTS FOR PLOT CONNECTION SHALL BE TERMINATED WITH END-CAP AND MARKER. THE
BUILDING CONTRACTOR SHALL PROVIDE THE OPTICAL DISTRIBUTION BOX FOR INTERFACE BETWEEN
THE LEAD-IN DUCTS AND THE BUILDING ENTRANCE FACILITY.

7.THE CONTRACTOR SHALL LOCATE THE TIE-IN MANHOLE FROM THE BACKBONE NETWORK AND
PROVIDE CONNECTION UP TO THE GOLF CLUB HOUSE BUILDING ENTRANCE FACILITY.

8.ICT STANDARD DETAILS REFER TO DRAWING NO. 13-180001-4800000492-CH2-INF-DRG-560550.

IS
INDUSTRIAL SWITCH CABINET 16

3103400 N 3103400 N

10.0
10.0
10.0
10.0

3103300 N

ICT-MH1-21
(BY OTHERS) FREEZER
G00-001B

FFL +4.120 m
SSL +4.020 m
CHILLER
G00-001A

10.0

5.0
RECEIVING
G00-001

LOA
DIN
G
WASH BAY 01

BAY
G00-002

WASH BAY 02
G00-003

FD
REPAIR 01
G00-004

REPAIR 02
G00-005

2 X 4 WAY 40/33 HDPE MICRODUCTS PROPOSED ELECT.


G00-009

TIE-IN CONNECTION (PRIMARY) TO MAIN (14 ICT

STA

FD
Nos G00-010

GIN
.)

G
BACKBONE MANHOLE

LAN
ES
10.0
(REFER NOTE 7)

FD
1M RR
CO
WID IDO
E R
PARKING &

UTI
STORAGE AREA

LITY
G00-007

CONDENSING
G00-044

10.0
PROPOSED ICT DUCT TIE-IN CONNECTION

FD
0
SHALL BE LAID ALONG WITH EXISTING ICT

60
10
BACKBONE CORRIDOR .0

STA Nos
(16

GIN
G
.)
LAN
ES
FD
0+

UP
.0
10
WASTE COLLECTION
G00-011 CHA

EV
PAR
(20
RG
ING

Nos

KIN
G
.)
BAY

&
S

FD

+4.270 m

FLOOR OPERATION
DESK

2 X 4 WAY 40/33 HDPE MICRODUCTS


G00-008

WORKSHOP

FOR BUILDING MTR CONNECTION.


G00-012

(REFER NOTE 6) MEETING ROOM


G00-016
BORDER SECURITY
G00-013

LOGISTIC HUB +4.270 m


SECURITY DRI
VEW
G00-014
AY

10
OFFICE 01
G00-017
.0

OFFICE CORRIDOR
OFFICE 02
G00-019
G00-018

FFL +4.320 m
SSL +4.220 m
TOILET / CHANGING
M.

UP
WC G00-026
G00-026A

UP
CHANGING M. CORRIDOR
WC G00-025 G00-042
G00-026B

LOC
WC

KER
G00-030A

S
ABLUTION M.
G00-024
VESTIBULE
G00-023
TOILET / CHANGING FERRY WAITING
F. JANITOR AREA
G00-030 G00-022 G00-015
INB
VESTIBULE OU

STA
ND
G00-027 ADA TOILET

GIN
G
G00-020B

LOC

LAN
ES
KER
S
CHANGING F. TOILET F.
G00-029 G00-020
FIRST AID ROOM
UPS ABLUTION F. G00-031 WC
G00-035 G00-028 G00-020A

PROPOSED ICT DUCT TIE-IN CONNECTION


WC
G00-021A

SHEET-1

OU GIN
STA
TOILET M.

TBO
UN LAN
DISHWASH AREA G00-021

G
D ES
SHALL BE LAID ALONG WITH EXISTING ICT
G00-032
ADA TOILET
G00-021B

PRAYER ROOM
G00-034
MECHANICAL ROOM
G00-038
MECHANICAL ROOM
FFL +4.270 m

BACKBONE CORRIDOR
G00-037 SSL +4.170 m

TOW
JET

ARD
FFL +4.270 m

TY
SSL +4.170 m

S
SERVER ROOM BOH LOGISTICS
G00-039 STAFF
G00-033

.
AR- NO
2-M ING
CH AW
MTR & GSM

92- DR
G00-040

004 TO
000 ER
REF
-162001 TY
110-48
+4.420 m

DRG 180 JET


FOR
13-
LV ROOM
G00-041

2 X 4 WAY 40/33 HDPE MICRODUCTS PROPOSED +4.170 m


CONDENSING
G00-043

TIE-IN CONNECTION (SECONDARY) TO MAIN 4.270

4.320

BACKBONE MANHOLE (REFER NOTE 7) UP

3103200 N 3103200 N

ICT-MH1-3 ICT-MH1-20
(BY OTHERS)

0m 20m 40m 60m 80m 100m

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF NEOM. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT FROM NEOM.
VISUAL SCALE 1:1000 @ A0

STAGE 3D-TENDERING AND IFC

B STAGE 3D-TENDERING AND IFC MAF 02.03.23


A STAGE 3B - DEVELOPED DESIGN MAF 23.01.23
REV DESCRIPTION APP DATE
3103100 N
C PURPOSE OF ISSUE:

FOR APPROVAL
CLIENT: PROJECT MANAGEMENT CONSULTANT:

1
FP-SPA-01-0
C:\Users\paulj\Desktop\NEOM Sindalah Island (electrical)\Logistic Hub\13-180001-4800000492-CH2-INF-DRG-161550.dwg

DESIGN CONSULTANT NAME & LOGO (s): CONTRACTOR NAME & LOGO (s):
668100 E

668200 E

668300 E

668400 E

668500 E
DESIGN SUB-CONSULTANT NAME & LOGO (s):

3103000 N

B DESIGN CONSULTANT / CONTRACTOR: NEOM'S REVIEW:


DRAWN: RKK 02.03.23
CHECKED: PS/PB 02.03.23 CHECKED:
APPROVED: MAF 02.03.23 APPROVED:

SCALE: 1:1000 SHEET SIZE: A0


DISCIPLINE NAME:
INFRASTRUCTURE

4800000492/002 - BOH LOGISTIC HUB


ICT CIVIL WORK NETWORK LAYOUT - SHEET INDEX
PROJECT NAME:

4800000492/002 - SINDALAH ISLAND


BOH LOGISTICS HUB AND SERVICE JETTY
13 - SINDALAH ISLAND
NEOM
A
LEGEND:
KINGDOM OF SAUDI ARABIA
2 x 4 WAY 40/33 HDPE MICRODUCTS REGION ASSET CODE CONTRACT CODE

ICT BACKBONE MANHOLE


13 180001 4800000492
02/03/2023 2:20:02 PM

(PROVIDED BY OTHERS)
ICT BACKBONE TIE-IN MANHOLE DRAWING NUMBER
(PROVIDED BY OTHERS)
667900 N

668100 N

668300 N

668500 N

668700 N
ORIGINATOR DISCIPLINE DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

CH2 INF DRG 161550 B


NEOM-NEN-PRC-010_TMP02_02.00
1 2 3 4 5
GENERAL KEY PLAN:
N

N QIBLA

IS
INDUSTRIAL SWITCH CABINET 16

QIBLA
3103400 N

SHEET-1

NOTES:
1. THIS DRAWING IS THE COPYRIGHT OF JACOBS AND MUST NOT BE RETAINED, COPIED OR USED
WITHOUT THE ABOVE CONSULTANT'S AUTHORITY.

2. DO NOT SCALE FROM THE DRAWINGS.

3. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS NOTED OTHERWISE. ALL
DIMENSIONS TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.

4. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT ARCHITECTURAL,


STRUCTURAL, MECHANICAL, ELECTRICAL, AND CIVIL DRAWINGS AND ALL RELEVANT SECTIONS OF
THE SPECIFICATIONS.

D 5.ALL DUCTS LAID UNDER THE CARRIAGEWAY SHALL BE CONCRETE PROTECTED.

6.ALL LEAD-IN DUCTS FOR PLOT CONNECTION SHALL BE TERMINATED WITH END-CAP AND MARKER. THE
BUILDING CONTRACTOR SHALL PROVIDE THE OPTICAL DISTRIBUTION BOX FOR INTERFACE BETWEEN
THE LEAD-IN DUCTS AND THE BUILDING ENTRANCE FACILITY.

7.THE CONTRACTOR SHALL LOCATE THE TIE-IN MANHOLE FROM THE BACKBONE NETWORK AND
PROVIDE CONNECTION UP TO THE GOLF CLUB HOUSE BUILDING ENTRANCE FACILITY.

8.ICT STANDARD DETAILS REFER TO DRAWING NO. 13-180001-4800000492-CH2-INF-DRG-560550.

10.0
10.0
10.0
10.0

3103300 N

ICT-MH1-21
(BY OTHERS) FREEZER
G00-001B

FFL +4.120 m
SSL +4.020 m
CHILLER
G00-001A

10.0

5.0
RECEIVING
G00-001

LO
AD
IN
G
WASH BAY 01

BA
Y
G00-002

WASH BAY 02
G00-003

FD
REPAIR 01
G00-004

REPAIR 02
G00-005

2 X 4 WAY 40/33 HDPE MICRODUCTS PROPOSED ELECT.


G00-009

TIE-IN CONNECTION (PRIMARY) TO MAIN ICT

ST 4 N
(1

FD
AG os
G00-010

IN .)
G
BACKBONE MANHOLE

LA
N
ES
10.0
FD

(REFER NOTE 7)

1M RR
CO
W ID
ID O
E R
PARKING &

UT
IL
STORAGE AREA

IT
Y
G00-007

CONDENSING
G00-044

10.0
PROPOSED ICT DUCT TIE-IN CONNECTION FD

0
SHALL BE LAID ALONG WITH EXISTING ICT
10

60
BACKBONE CORRIDOR .0

ST 6 N
(1
AG os
IN .)
G
LA
N
ES
FD
0+

U
P
0
.
10
WASTE COLLECTION
CH

EV
G00-011
AR

PA
(2
G

R
0
IN

KI
N
G

N
os

G
BA

.)

&
YS

FD

+4.270 m

FLOOR OPERATION
DESK

2 X 4 WAY 40/33 HDPE MICRODUCTS


G00-008

WORKSHOP

FOR BUILDING MTR CONNECTION.


G00-012

(REFER NOTE 6) MEETING ROOM


G00-016
BORDER SECURITY
G00-013

LOGISTIC HUB +4.270 m


SECURITY

D
R
IV
G00-014

EW
AY
10
OFFICE 01
G00-017
.0

OFFICE CORRIDOR
OFFICE 02
G00-019
G00-018

FFL +4.320 m
SSL +4.220 m
TOILET / CHANGING
M.
U
P

WC G00-026
G00-026A
U
P

CHANGING M. CORRIDOR
WC G00-025 G00-042
G00-026B
LO

WC
C
KE

G00-030A
R
S

ABLUTION M.
G00-024
VESTIBULE
G00-023
TOILET / CHANGING FERRY WAITING
F. JANITOR AREA
G00-030 G00-022 G00-015

IN
VESTIBULE

BO IN
ST

U G
AG
G00-027 ADA TOILET

N LA
D
G00-020B
LO

N
CK

ES
ER
S

CHANGING F. TOILET F.
G00-029 G00-020
FIRST AID ROOM
UPS ABLUTION F. WC
G00-031
G00-035 G00-028 G00-020A

PROPOSED ICT DUCT TIE-IN CONNECTION


WC
G00-021A

O
UT AG
ST
TOILET M.

BO ING
UN LA
G00-021
DISHWASH AREA

D N
SHALL BE LAID ALONG WITH EXISTING ICT
G00-032

ES
ADA TOILET
G00-021B

PRAYER ROOM
G00-034
MECHANICAL ROOM
G00-038
MECHANICAL ROOM
FFL +4.270 m

BACKBONE CORRIDOR
G00-037
SSL +4.170 m

TO
W

JE
AR

TT
FFL +4.270 m DS

Y
SSL +4.170 m

SERVER ROOM BOH LOGISTICS


G00-039 STAFF
G00-033
.
- NO
AR G
2- IN
H AW

MTR & GSM


M
-C R
92 D

G00-040
04 TO
0 00 ER
11 48 EF
00
62 1- Y R
R 80 TT

+4.420 m
D -1 JE
G 00
13 R
FO

-1

LV ROOM
G00-041

2 X 4 WAY 40/33 HDPE MICRODUCTS PROPOSED +4.170 m


CONDENSING
G00-043

TIE-IN CONNECTION (SECONDARY) TO MAIN 4.320


4.270

BACKBONE MANHOLE (REFER NOTE 7) UP

3103200 N

ICT-MH1-20
(BY OTHERS) 0m 10m 20m 30m 40m 50m

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF NEOM. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT FROM NEOM.
VISUAL SCALE 1:500 @ A0

STAGE 3D-TENDERING AND IFC

B STAGE 3D-TENDERING AND IFC MAF 02.03.23


A STAGE 3B-DEVELOPED DESIGN MAF 23.01.23
REV DESCRIPTION APP DATE
C PURPOSE OF ISSUE:

FOR APPROVAL
CLIENT: PROJECT MANAGEMENT CONSULTANT:
C:\Users\paulj\Desktop\NEOM Sindalah Island (electrical)\Logistic Hub\13-180001-4800000492-CH2-INF-DRG-161551.dwg

DESIGN CONSULTANT NAME & LOGO (s): CONTRACTOR NAME & LOGO (s):

DESIGN SUB-CONSULTANT NAME & LOGO (s):

B DESIGN CONSULTANT / CONTRACTOR: NEOM'S REVIEW:


DRAWN: RKK 02.03.23

3103100 N CHECKED: PS/PB 02.03.23 CHECKED:


APPROVED: MAF 02.03.23 APPROVED:

SCALE: 1:500 SHEET SIZE: A0


DISCIPLINE NAME:
INFRASTRUCTURE

4800000492/002 - BOH LOGISTIC HUB


ICT CIVIL WORK NETWORK LAYOUT - SHEET 01
PROJECT NAME:

4800000492/002 - SINDALAH ISLAND


BOH LOGISTICS HUB AND SERVICE JETTY
13 - SINDALAH ISLAND
NEOM
A
LEGEND:
KINGDOM OF SAUDI ARABIA
-01
FP-SPA-01 REGION ASSET CODE CONTRACT CODE
2 x 4 WAY 40/33 HDPE MICRODUCTS
ICT BACKBONE MANHOLE
13 180001 4800000492
02/03/2023 2:14:55 PM

(PROVIDED BY OTHERS)
ICT BACKBONE TIE-IN MANHOLE DRAWING NUMBER
(PROVIDED BY OTHERS)
668100 E

668200 E

668300 E

668400 E

668500 E
ORIGINATOR DISCIPLINE DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

CH2 INF DRG 161551 B


NEOM-NEN-PRC-010_TMP02_02.00
1 2 3 4 5
GENERAL KEY PLAN:

E NOTE CONTINUOUS:
5. THE FOUNDATION/BOTTOM OF DUCT BANK AND MANHOLES SHALL BE INSPECTED BY A
QUALIFIED GEOLOGIST/GEOTECHNICAL ENGINEER TO SPECIFY THE FOUNDATION SUBGRADE
TREATMENT IF REQUIRED. THE BOTTOM OF FOUNDATIONS SHALL BE PREPARED AS FOLLOWS:

· WHERE FOUNDATIONS ARE BEARING ON QUATERNARY DEPOSITS, ALL EXISTING LOOSE


SILT/CLAY LAYERS AND/OR INFERIOR AND WEAK MATERIALS ENCOUNTERED AT THE
SURFACE SHALL BE CLEARED WHEN ENCOUNTERED AT THE FINAL EXCAVATION LEVEL AND
REPLACED BY APPROVED FILL MATERIALS.

50mm
NOTES:
ASPHALT 1. THIS DRAWING IS THE COPYRIGHT OF JACOBS AND MUST NOT BE RETAINED, COPIED OR USED
· THE CONTRACTOR SHALL SCARIFY AND RECOMPACT THE TOP 30CM AT THE FINAL WITHOUT THE ABOVE CONSULTANT'S AUTHORITY.
EXCAVATION LEVEL TO 100% OF MDD.
2. DO NOT SCALE FROM THE DRAWINGS.

· REPLACEMENT SHALL BE DONE USING ENGINEERED FILL MATERIALS CONFORMING TO THE 3. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS NOTED OTHERWISE. ALL
DIMENSIONS TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.
PROJECT SPECIFICATIONS AND LAID AND COMPACTED AS SPECIFIED.
CONCRETE

200mm
4. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT ARCHITECTURAL,
STRUCTURAL, MECHANICAL, ELECTRICAL, AND CIVIL DRAWINGS AND ALL RELEVANT SECTIONS OF
· ENGINEERED FILL LIMITS SHOULD EXTEND A MINIMUM DISTANCE EQUAL TO HALF THE THE SPECIFICATIONS.
WARNING TAPE

450mm
D
THICKNESS OF THE FILL LAYER BEYOND THE FOUNDATION EDGES FROM EACH SIDE

6. FOR FOUNDATIONS BEARING ON ROCK, BOTTOM OF THE EXCAVATED AREA SHALL BE


SCADA AND THOROUGHLY INSPECTED AND CLEARED OF ANY SOFT SPOTS OR UNSUITABLE MATERIAL TO
40/33 HDPE

200mm
SECURITY DETERMINE THE TYPE OF TREATMENT REQUIRED. ACCORDING TO THE CONDITION OF THE
BEDROCK AT FINAL EXCAVATION LEVEL, THE GROUND TREATMENT WILL INCLUDE THE
SAND FOLLOWING:

· ANY UNFAVORABLE MATERIAL SUCH AS SOILS OR HIGHLY FRACTURED ROCK EXPOSED AT


FINAL EXCAVATION LEVEL ARE TO BE TRIMMED, CLEANED AND THEN FILLED WITH LEAN OR
TELECOMMUNICATION 130mm CYCLOPEAN CONCRETE AS PER SPECIFICATIONS.

· ANY CAVITIES/FISSURES EXPOSED AT FINAL EXCAVATION LEVEL ARE TO BE TRIMMED,


CLEANED AND THEN FILLED WITH LEAN CONCRETE.

· WHERE ZONES OF EXTENSIVELY FISSURED AND JOINTED BEDROCK ARE EXPOSED AT


FOUNDATION LEVEL, THEN SLUSH GROUT/HIGH SLUMP LEAN CONCRETE SHALL BE APPLIED
ON THE SURFACE OF THESE ZONES TO SEAL THE ROCK SURFACE PRIOR TO CONCRETING
OF THE STRUCTURAL FOUNDATIONS.
1 TELECOM & ICT DUCTS WITH CONCRETE
-
TRENCH FOR LEAD-IN DUCTS · OPEN AND/OR SOIL FILLED JOINTS AND DISCONTINUITIES SHALL BE CLEANED AND FILLED
WITH LEAN CONCRETE.

7. THE ABOVE WILL NOT ACCOUNT FOR ANY BENDING/SETTLEMENT THAT OCCURRING DURING
THE HANDLING AND INSTALLATION OR AT THE CONNECTIONS BETWEEN THE DUCT BANK AND
THE MANHOLES. THE RELATED MANUFACTURE'S RECOMMENDATIONS SHOULD BE CONSIDERED
TO ACCOUNT FOR THESE CIRCUMSTANCES.

8. ICT NETWORK LAYOUT REFER TO DRAWING NO. 13-180001-4800000492-CH2-INF-DRG-161550 TO


13-180001-4800000492-CH2-INF-DRG-161551.

50mm
SIDEWALK

BACKFILLING

200mm
MATERIAL
WARNING TAPE

450mm
40/33 HDPE SCADA AND

200mm
SECURITY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF NEOM. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT FROM NEOM.
SAND
STAGE 3B - DEVELOPED DESIGN
TELECOMMUNICATION
130mm B STAGE 3D-TENDERING AND IFC MAF 02.03.23
A STAGE 3B - DEVELOPED DESIGN MAF 23.01.23
REV DESCRIPTION APP DATE
C PURPOSE OF ISSUE:

FOR APPROVAL
CLIENT: PROJECT MANAGEMENT CONSULTANT:

2 TELECOM & ICT DUCTS TRENCH


-
FOR LEAD-IN DUCTS
C:\Users\paulj\Desktop\NEOM Sindalah Island (electrical)\Logistic Hub\13-180001-4800000492-CH2-INF-DRG-560550.dwg

DESIGN CONSULTANT NAME & LOGO (s): CONTRACTOR NAME & LOGO (s):

DESIGN SUB-CONSULTANT NAME & LOGO (s):

B DESIGN CONSULTANT / CONTRACTOR: NEOM'S REVIEW:


DRAWN: RKK 02.03.23
CHECKED: PS/PB 02.03.23 CHECKED:
APPROVED: MAF 02.03.23 APPROVED:

SCALE: NTS SHEET SIZE: A0


DISCIPLINE NAME:
INFRASTRUCTURE

4800000492/002 - BOH LOGISTIC HUB


ICT CIVIL WORK DUCT BANK DETAILS
PROJECT NAME:

4800000492/002 - SINDALAH ISLAND


BOH LOGISTICS HUB AND SERVICE JETTY
13 - SINDALAH ISLAND
NEOM
A
KINGDOM OF SAUDI ARABIA
REGION ASSET CODE CONTRACT CODE

13 180001 4800000492
02/03/2023 2:05:35 PM

DRAWING NUMBER
ORIGINATOR DISCIPLINE DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

CH2 INF DRG 560550 B


NEOM-NEN-PRC-010_TMP02_02.00