0% found this document useful (0 votes)
2 views

REF615 Report Format1

The document is a test report for a Feeder Protection Relay (REF-615) conducted for M/s. Jindal Steel Power. It details the inspection results, measurements, and test outcomes, confirming that all tested parameters passed and the relay is fit for commissioning. The report includes specific settings and results for various protection functions, indicating compliance with relevant standards.

Uploaded by

reltecempmails
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views

REF615 Report Format1

The document is a test report for a Feeder Protection Relay (REF-615) conducted for M/s. Jindal Steel Power. It details the inspection results, measurements, and test outcomes, confirming that all tested parameters passed and the relay is fit for commissioning. The report includes specific settings and results for various protection functions, indicating compliance with relevant standards.

Uploaded by

reltecempmails
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

No.

254/5, 3rd Main Road, Mahalaksmi Layout, Bangalore -560086, Mob : 9448040046, 9964441111

Certificate No Page No
Test date Next test due date
Client Details M/s.Jindal Steel Power,
Chhendipada Road,Nisha
Sub P.O. Jindal Nagar, Pin Code -759111,
District Angul, (Odisha), India
Project 2X525 MW, ACPP-II,

TEST REPORT FOR FEEDER PROTECTION RELAY (REF-615)

Location
Switchgear
Name
Feeder Name

1.0. Name plate details.:


Make
Type
Model No.
In (CT Ratio)
Vn( PT Ratio)
Vx (Aux Volts)
Sl.No.

2.0. General check :


Item Description Result
01 Inspect for physical damage / defects.  Yes  N/A PASS
Installation and Wiring Correct To Relevant
02  Yes  N/A PASS
Drawings
03 Check Tightness of all connections  Yes  N/A PASS
04 Panel Earthling /Case Earthing Check  Yes  N/A PASS
05 AC/DC Voltage Checks  Yes  N/A PASS
06 Indication/Target Checks  Yes  N/A PASS
07 Binary Input Contacts Check  Yes  N/A PASS
08 Relay Output Checked  Yes  N/A PASS
All Protection Setting Verified as per Actual
09  Yes  N/A PASS
Setting
10 Relay Key Pad Function Checked  Yes  N/A PASS
11 Relay Display Found  Yes  N/A PASS
LED Reset Button, Label and Function
12  Yes  N/A PASS
Checked
13 AL CT/PT Connection and Links Checked  Yes  N/A PASS

3.0. Details :
CT Ratio
Test by REPL Witnessed by JPL Engineer Certified by JPL Incharge
No.254/5, 3rd Main Road, Mahalaksmi Layout, Bangalore -560086, Mob : 9448040046, 9964441111

PT Ratio
Phase Over Current Protection 51/50 :
(DPHLPDOC1:1) Ip> Ip> Set Characteristics set TMS
PHIPTOC1-1 I> I> Set Characteristics set Time
Earth Fault Protection 51N/50N : -
(DEFLPDEF1:1) Ie> Ie> Set Characteristics set TMS
EFHPTOC1-1 : Ie>> Ie>> Set Characteristics set Time
Sensitive Earth Fault 51NS:
DEFLPDEF2:1 Is> Is> Set Characteristics set TMS
Under Voltage 27
Stage -1 Voltage set Time set
4.0.Measurements Check :
a) Current Measurements : CT Ratio : , NCT Ratio :
Phase Injected Current Expected Value Measured Current In Relay (A.AC)
In (A.AC) In (A.AC) IA IB IC IN
R-N
Y-N
B-N
RYB
NCT
Note : Current Tolerance : ± 1.5 %,
b) Voltage Measurements : PT Ratio :
Phase Injected Voltage Expected Value Measured Voltage In Relay (Kv.AC)
In (V.AC) In (Kv.AC) RY YB BR RYB-N
R-Y
Y-B
B-R
R-N
Y-N
B-N
Voltage Tolerance : ± 1.5 %,
5.0. Phase Over Current Protection 51/50 : -
(DPHLPDOC1:1)
Setting :
Ip> Set IEC Character Set TMS/Time Delay Set
Test Results :
Phase Pickup Operating Time In (Secs) at Multiplies of Set current
In (A.AC) 2Times 5Times 10Times
Expected Actual Expected Actual Expected Actual Expected Actual
R
Y
B
RYB
Pass Criteria- ±1.% of the set value or ± 20ms

PHIPTOC1-1
Setting :
I> Set IEC Character Set TMS/Time Delay Set

Test by REPL Witnessed by JPL Engineer Certified by JPL Incharge


No.254/5, 3rd Main Road, Mahalaksmi Layout, Bangalore -560086, Mob : 9448040046, 9964441111

Test Results :
Phase Pick up Expected trip time Actual trip time
In (A.AC In (Secs) In (Secs)
R
Y
B
RYB
Pass Criteria- ±1.% of the set value or ± 20ms

6.0. Earth Fault Protection 51N/50N : -


(DEFLPDEF1:1)

Setting :
Ie> Set IEC Character Set TMS/Time Delay Set

Test Results :
Phase Pickup Operating Time In (Secs) at Multiplies of Set current
In (A.AC) 2Times 5Times 10Times
Expected Actual Expected Actual Expected Actual Expected Actual
N
Pass Criteria- ±1.% of the set value or ± 20ms

EFHPTOC1-1 :

Setting :
Ie>> Set IEC Character Set TMS/Time Delay Set

Test Results :
Phase Pick up Expected trip time Actual trip time
In (A.AC In (Secs) In (Secs)
N
Pass Criteria- ±1.% of the set value or ± 20ms

7.0.Sensitive Earth Fault 51NS:


DEFLPDEF2:1

Setting :
Is> Set IEC Character Set TMS/Time Delay Set

Test Results :
Phase Pickup Operating Time In (Secs) at Multiplies of Set current
In (A.AC) 2Times 5Times 10Times
Expected Actual Expected Actual Expected Actual Expected Actual
N
Pass Criteria- ±1.% of the set value or ± 20ms

8.0. Under Voltage Protection (27) : -


Setting :
U< Set IEC Character Set TMS/Time Delay Set

Test Results :
Test by REPL Witnessed by JPL Engineer Certified by JPL Incharge
No.254/5, 3rd Main Road, Mahalaksmi Layout, Bangalore -560086, Mob : 9448040046, 9964441111

Phase Pick up Expected trip time Actual trip time


In (V.AC) In (Secs) In (Secs)
RY
YB
BR
RYB

9.0. Programmable LED's :


LED LED Function
1
2
3
4
5
6
7
8
9
10

10. Binary Inputs :


BI Function
X110-INPUT-1
X110-INPUT-2
X110-INPUT-3
X110-INPUT-4
X110-INPUT-5
X110-INPUT-6
X110-INPUT-7
X110-INPUT-8
X120-INPUT-1
X120-INPUT-2
X120-INPUT-3
X120-INPUT-4
X130-INPUT-1
X130-INPUT-2
X130-INPUT-3
X130-INPUT-4

11. Binary Outputs :


BO Function
X100-PO1
X100-PO2
X100-SO1
X100-SO2

Test by REPL Witnessed by JPL Engineer Certified by JPL Incharge


No.254/5, 3rd Main Road, Mahalaksmi Layout, Bangalore -560086, Mob : 9448040046, 9964441111

X100-PO3
X100-PO4
X110-SO1
X110-SO2
X110-SO3
X110-SO4

12.0, Remarks :
Status Remarks ( OK/Not OK)
Above Test Results Found
Tested Good
Relay Fit for Commissioning/Operational

13. Reference Standard :


Field Testing of Electrical Relays and Instrument Transformers : IS9124-1979

14. Standards Used for Testing :


Standards Details Make/Model No/SL.No Calibration Validity
Three Phase Relay Test Kit
Digital Multi Meter
Leakage Tester

Test by REPL Witnessed by JPL Engineer Certified by JPL Incharge

You might also like