chapter 8 Test Process management and Improvement
chapter 8 Test Process management and Improvement
1
Session Objective
◦At the end of this chapter, students will be able to
◦ Explain software test plan
2
Software Test Management
◦ Software test management is a process of planning, executing,
monitoring and controlling software testing activities.
◦ It is the practice of organizing and controlling the processes and artifacts
required for the testing effort throughout the project cycle.
◦ Software test management often has multifunctional capabilities such as
testware management, test scheduling, the logging of results, test
tracking, incident management and test reporting.
◦ It uses manual and automated tools.
3
Software Test Management Processes
4
Software Test Planning
PROCESS 1
5
1. Software Test Planning
◦Software test planning is the practice of documenting
software testing requirements in an organized manner.
◦The test plan serves as a blueprint to conduct software
testing activities as a defined process which is minutely
monitored and controlled by the test manager.
6
…Test planning
◦ A test plan is a detailed document that outlines the
test tasks, (what)
test strategy,
test approach, (how)
testing objectives, (why)
resources (manpower, software, hardware) required for testing,
test schedule, (when)
test estimation and
test deliverables.
7
Importance of Software Test Plan
1) Test plan helps us determine the effort needed to validate the
quality of the application under test
2) Help people outside the test team such as developers, business
managers, customers understand the details of testing.
8
How to write a Software Test Plan
◦ Follow the eight steps below to create a test plan as per IEEE 829
I. Analyze the Product
Analyze the Design the Define the Test
II. Design the Test Strategy product Test Strategy Objectives
9
I. Analyze the product
◦ You must learn a product thoroughly before testing it. How can you test
a product without any information about it? The answer is impossible.
◦ You should research clients or the end users to know their needs and
expectations from the application.
Who will use the website?
What is it used for?
How will it work?
What software/ hardware the product uses?
10
…Analyze the product
◦ For instance, the product under test is Guru99.
◦ You can use the following approach to analyze the site
◦ Now let’s apply the above information to a real product:
◦ Analyze the banking website http://demo.guru99.com/V4.
◦ You should take a look around this website and also review product documentation.
◦ Review of product documentation helps you to understand all the features of the
website as well as how to use it. If you are unclear on any items, you
might interview customers, developers, designers to get more information.
11
II. Develop Test Strategy
◦ Test strategy is a critical step in making a test plan.
◦ A test strategy is a high-level document which is usually developed by test
manager.
◦ This document defines:
◦ The project’s testing objectives and the means to achieve them
◦ Determines testing effort and costs
◦ You should follow the steps below
12
2.1. Define Scope of Testing
◦ Before the start of any testing activity, scope of the testing should
be known. You must think hard about it.
◦ The components of the system to be tested (hardware, software, middleware,
etc.) are defined as "in scope"
◦ The components of the system that will not be tested also need to be clearly
defined as being "out of scope."
◦ Defining the scope of your testing project is very important for all
stakeholders. A precise scope helps you
◦ Give everyone confidence & accurate information of the testing you are doing
◦ All project members will have clear understanding about what is tested and what is
not
13
How you determine scope of your project
◦ To determine scope, you must have
Precise customer requirement
Project budget
Product specification
◦ For instance, if a customer wants you to conduct stress and load testing, but
the project budget does not permit to do so. In such a case what will you
do?
14
…H ow do you determine scope of your project?
◦ Well, in such case you need to convince the customer that stress and load
testing is extra work and will consume significant resources. Give him data
supporting your facts. Tell him if we conduct these tests, the budget will increase
by XYZ amount. If the customer disagrees, you have to modify your “in scope”
and “out of scope” testing
◦ As the software requirement specs, only focus on testing and the functions and
external interface (in scope testing)
◦ Non-functional testing such as stress and load testing currently will not be
tested. (out of scope)
15
2.2. Identify Testing Type
◦ A testing type is a standard test procedure that gives an expected test
outcome.
◦ Each testing type is formulated to identify a specific type of product
bugs. But, all testing types are aimed at achieving one common goal
“early detection of all the defects before releasing the product to the
customer”
◦ Your team cannot have enough efforts to handle all kind of testing.
◦ As test manager, you must set priority of the testing types
◦ Which testing types should be focused?
◦ Which testing types should be ignored for saving cost?
16
2.3. Document Risk & Issues
◦ Risk is future’s Risk Mitigation
with probability of
The project schedule is too Set test priority for each of the test
occurrence and a tight; it's hard to complete this
project on time
activity.
potential for
loss.
Test manager has poor Plan leadership training for
◦ When the risk actually management skill the manager
happens, it becomes the Lack of cooperation Encourage each team
negatively affects your member in his task, and
‘issue’. employees' productivity inspire them to greater efforts.
◦ In the test plan, you will
Wrong budget estimate and cost Establish the scope before
document those risks. overruns beginning work, pay a lot of
attention to project planning
and constantly track and measure
the progress
17
17
2.4. Create Test Logistics
◦ In test logistics, the test manager should answer the following questions:
◦ Who will test?
◦ When will the test occur?
◦ You may not know exact names of the tester who will test, but the type of tester can be
defined.
◦ To select the right member for specified task, you have to consider if his skill is qualified
for the task or not, also estimate the project budget. Selecting wrong member for the task
may cause the project to fail or delay.
◦ A person having the following skills is most ideal for performing software testing:
◦ Ability to understand customers point of view
◦ Strong desire for quality
◦ Attention to detail
◦ Good cooperation
◦ In your project, the member who will take in charge for the test execution is
the tester. Based on the project budget, you can choose in-source or outsource member as
the tester.
18
…When will the test occur?
◦ Test activities must be matched with associated development
activities.
◦ You will start to test when you have all required items shown in
the following figure
19
III. Define Test Objective
◦Test objective is the overall goal and achievement of the
test execution. The objective of the testing is
◦ finding as many software defects as possible;
◦ ensure that the software under test is bug free before release.
◦To define the test objectives, you should do the following
two steps:
1. List all the software features (functionality and non-
functional) which will be tested.
2. Define the target or the goal of the test based on the above
features
20
21
…Define Test Objectives
◦ This figure shows all the features which the guru99 website
may have.
◦ Based on above the features, you can define the test
objective of the project guru99 as follows
◦ Check that whether website guru99 functionality(account,
deposit…) is working as expected without any error or bugs in the
real business environment
◦ Check that the external interface of the website such as UI is
working as expected and meet the customer needs
◦ Verify the usability of the website. Are those functionalities
convenient for user or not?
22
IV. Define Test Criteria
◦ Test criteria is a standard or rule on which a test procedure or
test judgment can be based. There’re two types of test criteria:
(a) Suspension criteria
◦ Specify the critical suspension criteria for a test. If the
suspension criteria are met during testing, the active test cycle
will be suspended until the criteria are resolved.
◦ Example: if your team members report that 40% of test cases failed,
you should suspend testing until the development team fixes all the
failed cases.
23
TY OF COMPUTING | BIT | BAHIR 24
…Define Test Criteria
(b) Exit Criteria
◦ It specifies the criteria that denote a successful completion of a test
phase.
◦ The exit criteria are the targeted results of the test and are necessary
before proceeding the next phase of development.
25
…Define Test Criteria
◦ Some methods of defining exit criteria are by specifying a
targeted run rate and pass rate.
◦ Run rate - is the ratio between number of test cases executed/total
test cases of test specification.
◦ For example, the test specification has a total of 120 TCs, but the
tester only executed 100 TCs. So, the run rate is 100/120 = 0.83
(83%)
◦ Pass rate - is the ratio between number of test cases passed / test
cases executed.
◦ For example, in the above example, 100 TCs executed and 80 TCs
passed. So, the pass rate is 80/100 = 0.8 (80%)
26
…Define Test Criteria
◦This data can be retrieved in test metric documents.
◦Run rate is mandatory to be 100% unless a clear reason is
given.
◦Pass rate is dependent on project scope, but achieving
high pass rate shall be a goal.
27
……Define Test Criteria
Example: Your team has already done the test executions. They reported the test
result to you, and they want you to confirm the Exit Criteria.
28
V. Resource Planning
◦ Resource plan is a detailed summary of all types of resources
required to complete project task. Resource could be human,
physical (equipment and materials) and financial needed to
complete the test.
◦ The resource planning is important factor of the test planning
because it helps in determining the number of resources (employee,
equipment…) to be used for the project.
◦ Therefore, the test manager can make the correct schedule &
estimation for the project.
◦ This section represents the recommended resources for your
project.
29
No. Member Tasks
1. Test Manager Manage the whole software testing project
Define project directions
Human Acquire appropriate resources
Resource 2. Tester Identifying and describing appropriate test
techniques/tools/automation architecture
Verify and assess the Test Approach
This table Execute the tests, Log results, Report the defects.
Tester could be in-sourced or out-sourced members, base on the
shows project budget
various For the task which required low skill, I recommend you
members in choose outsourced members to save project cost.
your test 3. Developer in Test Implement the test cases, test program, test suite etc.
project team
4. Test Administrator Builds up and ensures Test Environment and assets
are managed and maintained
Support Tester to use the test environment for test execution
5. QA members Take in charge of quality assurance
Check to confirm whether the testing process is meeting specified
requirements
30
No. Resources Descriptions
1. Server Install the web application under test.
Physical Resource This includes a separate web server,
database server, and application server (if
For testing, a web applicable)
application, you should
plan the resources shown 2. Test tool The testing tool is to automate the testing,
in this table: simulate the user operation, generate the
test results.
There are tons of test tools you can use for
this project such as Selenium, QTP…etc.
3. Network You need a Network including LAN and
Internet to simulate the real business and
user environment
4. Computer The PC that users often use to connect the
web server
31
Financial Resources
◦ To estimate the financial requirements of a test, you need the
following items:
1. List of activities and their estimated direct and indirect costs must be
calculated
2. Items to be purchased and their estimated direct and indirect costs must be
calculated
3. Human resource to be hired
◦ There are three types of cost estimation techniques:
◦ Preliminary cost estimation - accuracy (-25%, +75%)
◦ Budgetary cost estimation - accuracy (-10%, +25%)
◦ Definitive cost estimation - accuracy (-5%, +10%)
32
VI. Plan Test Environment
◦ A testing environment is a setup of software and hardware on
which the testing team is going to execute test cases.
33
How to setup the test environment
◦ To finish this task, you need a strong cooperation between test
team and development team
◦ You should ask the developer some questions to understand the web
application under test clearly.
◦ Here’re some recommended questions. Of course, you can ask the
other questions if you need.
1. What is the maximum user connection which this website can
handle at the same time?
2. What are hardware/software requirements to install this
website?
3. Does the user's computer need any particular setting to browse
the website?
34
VII. Schedule & E stimation
In the test estimation phase, suppose you break out the whole project
into small tasks and add the estimation for each task as shown below
Task Members Estimate effort
35
…Schedule & E stimation
◦ Then you create the schedule to complete these tasks.
◦ Making schedule is a common term in project management. By creating a solid
schedule in the test planning, the test manager can use it as tool for monitoring
the project progress, control the cost overruns.
◦ To create the project schedule, the test manager needs several types of input
such as:
◦ Employee and project deadline: the working days, the project deadline,
resource availability are the factors which affected to the schedule
◦ Project estimation: base on the estimation, the test manager knows how long
it takes to complete the project (Expected time calculation). So, he can make
the appropriate project schedule
◦ Project risk: understanding the risk helps test manager add enough extra time
to the project schedule to deal with the risks. (Buffer)
36
…Schedule & E stimation
Suppose the boss wants to complete a project in one month, you
already estimated the effort for each task in Test Estimation. You can
create the schedule as shown below. (Gantt Chart)
37
VIII. Determine Test Deliverables
◦ Test deliverables are list of all the documents, tools and other
components that have to be developed and maintained in support of
the testing effort.
38
1) Test deliverables provided before the testing phase.
◦ Test plans document.
◦ Test cases documents
◦ Test design specifications.
2) Test deliverables are provided during the testing
◦ Test scripts
◦ Simulators.
◦ Test data
◦ Test traceability matrix
◦ Error logs and execution logs.
3) Test deliverables are provided after the testing cycles is over.
◦ Test results/reports
◦ Defect report
◦ Release notes
39
Types of Test Plan
◦One can have the following types of test plans:
1. Master Test Plan: a single high-level test plan for a project/ product
that unifies all other test plans.
2. Testing-Level-Specific Test Plans: Plans for each level of testing.
◦ Unit Test Plan ◦ System Test Plan
◦ Integration Test Plan ◦ Acceptance Test Plan
41
Brief description
◦ Test Plan Identifier: Provides a unique identifier for the document. Every
deliverable has a unique identification number which could be numeric or
alphanumeric based on the company configuration management.
◦ Introduction: Brief introduction about the project and objective of the current
release. Project could be platform configuration tool and objective could new
mobile App interface or new feature / enhancement in existing product or
defect fixes.
◦ Test item: Introduction and overview of Software Under Test.
◦ Features to test: In scope features. This could be newly added or updated
features. Indirect features that have technical or functional dependency on
newly added or updated features.
42
Brief description
◦ Features not to test: Out of scope features. Excluded product features from
current Test Plan. [Note: Provide reasoning for exclusion, like, non-impacted /
less impacted / less priority features, as applicable.]
◦ Approach: Strategy to test the software. Includes types of tests and how to
test. Functional, performance, security testing using combined [manual +
automation], manual only, automation only approach.
◦ Test deliverables: All the deliverables from the testing e.g. approaches, test
cases, reports etc.
◦ Item pass/fail criteria: Entry and Exit criteria for all items. E.g.
◦ Test Case: All Steps passed
◦ Feature: All test cases executed and no defects are detected.
◦ Testing tasks: All tasks / steps to execute for test planning and execution
◦ Environmental needs: Infrastructure required for application and testing.
43
Brief description
◦ Responsibilities: Roles and responsibilities for various testing / supported activities.
◦ Staffing and training needs: Training / hiring needs to bridge the gap of available
and expected skill.
◦ Schedule: Test estimation (Efforts) and high-level schedule. Schedule should be for
key deliverables or important milestones. Ideally, all test deliverables included in the
test plan should be scheduled. Detailed test schedule (at feature or defects or resource
level) is prepared at appropriate time during test execution.
Risks and Mitigation: Risk identification for applicable items, assumptions, and
mitigation plan.
◦ Approvals: Approvals and sign of dates.
Test plan is a guideline based on which test execution should be tracked. For successful
testing and good product test delivery, it is important to update and make required changes
in the plan as per changes in the any of the parameter which was basis of the test plan.
44
Test Design
PROCESS 2
45
Test Design
◦ In software engineering, test design is the process of creating and writing test
artifacts for testing a software.
◦ Tasks include:
Identifying test basis
Developing test scenarios
Identifying and describing test cases
Developing test suite
Identifying and structuring test scripts
Reviewing and accessing test coverage using traceability matrix
46
Test Basis
◦ Test basis is the source to create test scenarios and test cases.
◦ It can be
◦ the application itself or
◦ the requirement documents such as
◦ SRS (Software Requirement Specification),
◦ BRS (Business Requirement Specification), etc.
47
Test Scenario
◦ A test scenario is any functionality that can be tested.
◦ It is also called test condition or test possibility.
◦ As a tester, you may put yourself in the end user’s shoes and
figure out the real-world scenarios and use cases of the
Application Under Test (AUT).
◦ Test scenario is what to be tested and a test case is how to be
tested.
48
…Test Scenario
Module 1 Module 2
Test Case 1 Test Case 1 Test Case 1 Test Case 1 Test Case 1 Test Case 1
Test Case 2 Test Case 2 Test Case 2 Test Case 2 Test Case 2 Test Case 2
Test Case n Test Case n Test Case n Test Case n Test Case n Test Case n
49
…Test Scenario
◦ Example 1: Test Scenario for Flight Reservation
◦ For the Flight Reservation Application, a few test scenarios would be
◦ Test Scenario 1: Check the Login Functionality
50
…Test Scenario
◦ Test Scenario 2: Check that a New Order can be created
51
…Test Scenario
◦ Test Scenario 3: Check that an existing Order can be opened
52
…Test Scenario
◦ Test Scenario 4: Check that a user, can FAX an order
53
…Test Scenario
◦ Test Scenario 5: Check that the information displayed in the HELP section is
correct
54
…Test Scenario
◦ Test Scenario 6: Check that the information displayed in About section,
like version, programmer name, copy right information is correct
55
…Test Scenario
◦ Apart from these six scenarios, here is the list of all other scenarios
◦ Update Order
◦ Delete Order
◦ Check Reports
◦ Check Graphs and so on.
◦ We have already learned exhaustive testing is not possible.
◦ Suppose you have time only to execute 4 out of those 6 scenarios
which two low priority scenarios of these six will you eliminate.
◦ I am sure most of you would have guessed scenarios 5 & 6 since
they are not the core functionality of the application. This is
nothing but test prioritization.
56
Why to create test scenarios?
◦ Test scenarios are created for the following reasons:
◦ To ensure complete test coverage
◦ To get approval from various stakeholders like business analyst, developers,
customers to ensure the application under test is thoroughly tested. It ensures that
the software is working for the most common use cases.
◦ To quickly determine the testing work effort and accordingly create a proposal for
the client or organize the workforce.
◦ To determine the most important end-to-end transactions or the real use of the
software applications.
57
When not to create test scenario?
◦ Test scenarios may not be created when
The application under test is complicated, unstable and there is a
time crunch in the project.
Projects that follow agile methodology like Scrum, Kanban may
not create test scenarios.
Test scenario may not be created for a new bug fix or regression
testing. In such cases, test scenarios must be already heavily
documented in the previous test cycles.
58
How to create test scenario?
◦ As a tester, we follow the following five steps to create test scenarios:
◦ Step 1: Read the Requirement Documents like BRS, SRS of the Application Under
Test (AUT). You could also refer uses cases, books, manual, etc. of the
application to be tested.
◦ Step 2: For each requirement, figure out possible users actions and objectives.
Determine the technical aspects of the requirement. Ascertain possible
scenarios of system abuse and evaluate users with hacker's mindset.
◦ Step 3: After reading the requirements document and doing your due analysis, list
out different test scenarios that verify each feature of the software.
◦ Step 4: Once you have listed all possible Test Scenarios, a Traceability Matrix is
created to verify that each & every requirement has a corresponding Test
Scenario
◦ Step 5: The scenarios created are reviewed by your supervisor. Later, they are also
reviewed by other stakeholders in the project.
59
Test Case
◦ A test case is a set of actions executed to verify a particular feature or functionality of
your software application.
◦ A test case is a document which consists of a set of conditions or actions which are
performed on the software application in order to verify the expected functionality of
the feature.
◦ Here we describe the end to end logical flow of a specific requirement with test data,
prerequisites and expected results.
◦ Test scenarios are rather vague and cover a wide range of possibilities. Testing is all
about being very specific.
60
…Test case
◦Now, consider the Test Scenario: Check Login
functionality there are many possible cases like
◦ Test Case 1: Check results by entering valid User Id & Password
61
Format of Standard Test Case
Below is format of a standard login Test case
Test Case ID Test Scenario Test Steps Test Data Expected Results Actual Results Pass/Fail
TU01 Check Customer 1. Go to site Userid = User should Login As Expected Pass
Login with valid http://demo.guru99.com guru99 into application
Data 1. Enter UserId Password =
2. Enter Password pass99
3. Click Submit
TU02 Check Customer 1. Go to site Userid = User should not As Expected Pass
Login with http://demo.guru99.com guru99 Login into
invalid Data 1. Enter UserId Password = application
2. Enter Password glass99
3. Click Submit
62
Test Case Field Description
Test case ID: •Each test case should be represented by a unique ID. To indicate test types follow some convention like "TC_UI_1" indicating "User
Interface Test Case#1."
Test Priority: •It is useful while executing the test.
• Low
• Medium
• High
Name of the Module: •Determine the name of the main module or sub-module being tested
Test Designed by: •Tester's Name
Date of test designed: •Date when test was designed
Test Executed by: •Who executed the test- tester
Date of the Test Execution: •Date when test needs to be executed
Name or Test Title: •Title of the test case
Description/Summary of Test: •Determine the summary or test purpose in brief
Pre-condition: •Any requirement that needs to be done before execution of this test case. To execute this test case list all pre-conditions
Expected Results: •Mention the expected result including error or message that should appear on screen
Post-Condition: •What would be the state of the system after running the test case?
Actual Result: •After test execution, actual test result should be filled
Status (Fail/Pass): •Mark this field as failed, if actual result is not as per the estimated result
Notes: •If there are some special condition which is left in above field 63
Characteristics of Good Test Case
1. Test Cases need to be simple and transparent
◦ Create test cases that are as simple as possible. They must be clear and concise as the
author of test case may not execute them.
◦ Use assertive language like go to home page, enter data, click on this and so on. This
makes the understanding of the test steps easy and test execution faster.
4. Do not Assume
◦ Do not assume functionality and features of your software application
while preparing test case. Stick to the specification documents.
65
…Test Case
5. Ensure 100% Coverage
◦ Make sure you write test cases to check all software requirements mentioned in the specification
document. Use Traceability Matrix to ensure no functions/conditions is left untested.
66
…Test Case
8. Self cleaning
◦ The test case you create must return the Test Environment to the pre-test state and should not
render the test environment unusable. This is especially true for configuration testing.
67
Test Case Management Tools
◦ Test case management tools are the automation tools that help to manage and
maintain the Test Cases. Main features of a test case management tool are
1. For documenting Test Cases: With tools you can speed up Test Case creation
with use of templates
2. Execute the Test Case and Record the results: Test Case can be executed
through the tools and results obtained can be easily recorded.
3. Automate the Defect Tracking: Failed tests are automatically linked to the
bug tracker, which in turn can be assigned to the developers and can be
tracked by email notifications.
4. Traceability: Requirements, Test cases, Execution of Test cases are all
interlinked through the tools, and each case can be traced to each other to
check test coverage.
5. Protecting Test Cases: Test cases should be reusable and should be protected
from being lost or corrupted due to poor version control.
68
Types of test cases
There are two types of test cases as mentioned below:
1. Formal test cases: Formal test cases are those test cases which are authored as per
the test case format. It has all the information like preconditions, input data, output
data, post conditions, etc. It has a defined set of inputs which will provide the
expected output.
2. Informal test cases: Informal test cases are authored for such requirements where
the exact input and output are not known. In order to test them the formal test cases
are not authored but the activities will be done and the outcomes are reported once
the tests are run.
69
Test Suit
◦ In software engineering, a test suite is a collection of test cases that
are intended to be used to test a software program, to show that it
has some specified set of behaviors.
◦ Test suite is a container that has a set of tests which helps testers in
executing and reporting the test execution status.
◦ A test suit is a collection of test cases that are grouped for test
execution purposes.
70
Test Script
◦A test script is a set of instructions (written using
a scripting/programming language) that is performed on a
system under test to verify that the system performs as
expected.
71
Test Data
◦ Test data is the documented data that is basically used to test the software program.
◦ Test data may be produced by the tester, or by a program or function that aids the tester.
Test data may be recorded for re-use, or used once and then forgotten.
◦ Positive test data which is generally gives to system to generate the expected result and
◦ Negative test data which is used to test the unhandled conditions, unexpected,
exceptional or extreme input conditions.
◦ If the test data is inadequately designed, then such test inputs will not cover all possible
test scenarios, which impact the quality of the software application under test.
72
…Test Data
◦ Limitations
73
Generating Test Data
1) The best test data: try to create the best data set that should not be so
long and identifies bugs of all kinds of application functions but does
not exceed cost and time limitation for preparing test data and running
tests.
2) Unlawful data set-up: create wrong data set format. This invalid or
dishonest format of data cannot be accepted by system and generates an
error message. Check that, it has to generate an error message.
3) Boundary condition data set: data set holding out of range data.
Recognize application boundary cases to organize data set that will
cover lower as well as upper boundary conditions.
74
…Generating Test Data
4) Correct data set: create correct data set to ensure that an application is
responding as per the requirement or not and to know that the data is
correctly saved in a database/file or not.
6) Create large data set for performance, load and stress testing,
and regression testing: large amount of data set is required for these kinds
of testing. To do the performance testing for the DB application that
fetches/updates data from/to DB table – the large data set required.
75
…Generating
7) Blank or default data: execute your test cases in blank or
default data set environment to check that correct error
messages are generated or not.
76
Requirements Traceability Matrix (RTM)
◦ RTM captures all requirements proposed by the client or
software development team and their traceability in a single
document delivered at the conclusion of the life-cycle.
◦ It is used to track the requirements and to check the current
project requirements are met.
◦ In other words, it is a document that maps and traces user
requirement with test cases.
◦ The main purpose of RTM is to see that all test cases are
covered so that no functionality should miss while doing
software testing.
77
Requirement Traceability Matrix
◦RTM Parameters include
◦ Requirement ID
◦ Risks
◦ Requirement Type and Description
◦ Trace to design specification
◦ Unit test cases
◦ Integration test cases
◦ System test cases
◦ User acceptance test cases
◦ Trace to test script
78
79
Types of RTM
1) Forward traceability
◦ It maps requirements to test cases.
◦This matrix is used to check whether the project progresses
in the desired direction and for the right product.
◦It makes sure that each requirement is applied to the
product and that each requirement is tested thoroughly.
80
…Types of RTM
2) Backward or reverse traceability
◦ It maps test cases to requirements.
◦ It is used to ensure whether the current product remains on the right
track.
◦ The purpose behind this type of traceability is to verify that we are
not expanding the scope of the project by adding code, design
elements, test or other work that is not specified in the requirements.
81
…Types of RTM
3) Bi-directional traceability ( Forward+Backward)
◦ This traceability matrix ensures that all requirements are
covered by test cases.
◦ It analyzes the impact of a change in requirements affected by
the defect in a work product and vice versa.
82
Advantage of RTM
◦ It confirms 100% test coverage
◦ It highlights any requirements missing or document
inconsistencies
◦ It shows the overall defects or execution status with a focus on
business requirements
◦ It helps in analyzing or estimating the impact on the QA team's
work with respect to revisiting or re-working on the test cases
83
Test Execution
PROCESS 3
84
Test Execution
◦ Once the preparation of test case development and test
environment setup is completed, then test execution phase can
be kicked off.
◦ Test execution is the process of executing the code and
comparing the expected and actual results.
◦ In this phase, testing team start executing test cases based on
prepared test planning & prepared test cases in the prior step.
85
Test execution
◦ Once the test case is passed then same can be marked as passed.
◦ If any test case is failed then corresponding defect can be reported
to the developer team via bug tracking system & bug can be linked
for corresponding test case for further analysis.
86
…Test E xecution
◦ Once the bug fixed by development team then same test case can be
executed based on your test planning.
◦ If any of the test cases are blocked due to any defect then such test
cases can be marked as Blocked, so we can get the report based on
how many test cases passed, failed, blocked or not run etc.
◦ Once the defects are fixed, same Failed or Blocked test cases can be
executed again to re-test the functionality.
87
…Test
EntryE xecution
Criteria Activity Exit Criteria Deliverables
• Baselined RTM, Test • Execute tests as per plan • All tests planned • Completed RTM with
Plan, Test case/scripts • Document test results, and are executed execution status
are available log defects for failed cases • Defects logged • Test cases updated
• Test environment is • Update test plans/test and tracked to with results
ready cases, if necessary closure • Defect reports
• Test data set up is Map defects to test cases
done in RTM
• Retest the defect fixes
• Regression Testing of the
application
• Track the defects to
closure
88
Test Reporting
PROCESS 4
89
Test Reporting and Cycle Closure
◦ Call out the testing team member meeting & evaluate cycle
completion criteria based on test coverage, quality, cost, time, and
critical business objectives.
◦ Discuss what all went good, which area needs to be improved &
taking the lessons from current STLC as input to upcoming test
cycles, which will help to improve bottlenecks in the STLC
process.
◦ Test cases & bug reports will analyze to find out the defect
distribution by type and severity.
◦ Once complete the test cycle then test closure report & test metrics
will be prepared.
90
…Test Reporting and Cycle Closure
Entry Criteria Activity Exit Criteria Deliverables
• Testing has been • Evaluate cycle completion criteria • Test closure • Test closure
completed • Prepare test metrics report signed report
• Test results are • Document the learning out of the off by clients • Test metrics
available project
• Defect report • Prepare test closure report
• Qualitative and quantitative reporting
of quality of the work product to the
customer.
• Test result analysis to find out the
defect distribution by type and
severity
91
Defect Reporting
◦When a tester executes the test cases, he might come across
the test result which is contradictory to expected result.
◦This variation in the test result is referred as a software
defect.
◦While reporting the defect to the developer, your defect
report should contain the following attributes:
92
◦ Defect_ID - Unique identification number for the defect.
◦ Defect Description - Detailed description of the Defect including information about the
module in which Defect was found.
◦ Version - Version of the application in which defect was found.
◦ Steps - Detailed steps along with screenshots with which the developer can reproduce the
defects.
◦ Date Raised - Date when the defect is raised
◦ Reference- where in you Provide reference to the documents like . requirements, design,
architecture or maybe even screenshots of the error to help understand the defect
◦ Detected By - Name/ID of the tester who raised the defect
◦ Status - Status of the defect , more on this later
◦ Fixed by - Name/ID of the developer who fixed it
◦ Date Closed - Date when the defect is closed
◦ Severity which describes the impact of the defect on the application
◦ Priority which is related to defect fixing urgency. Priority could be High/Medium/Low based
on the impact urgency at which the defect should be fixed respectively
93
thank you!
94