The document outlines various submittals related to material approvals, quality plans, and methodologies for a construction project, with submission numbers ranging from 231274-WTC-CV-APPL-001 to 231274-WTC-CV-APPL-022. It details the purpose of each submittal, the titles and disciplines involved, and their final statuses, indicating approvals, holds, rejections, and resubmissions. Additionally, it includes information on revisions and issue dates for certain submissions.

Uploaded by

ebadatmallick6
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views

Doc. Log

The document outlines various submittals related to material approvals, quality plans, and methodologies for a construction project, with submission numbers ranging from 231274-WTC-CV-APPL-001 to 231274-WTC-CV-APPL-022. It details the purpose of each submittal, the titles and disciplines involved, and their final statuses, indicating approvals, holds, rejections, and resubmissions. Additionally, it includes information on revisions and issue dates for certain submissions.

Uploaded by

ebadatmallick6
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

SL

DATE SUBMITTAL NO REVISION


NO
11 - 231274-WTC-CV-APPL-001 0
12 - 231274-WTC-CV-APPL-002 0
13 - 231274-WTC-CV-APPL-003 0
14 - 231274-WTC-CV-APPL-004 0
15 - 231274-WTC-CV-APPL-005 0
16 - 231274-WTC-CV-APPL-006 0
17 - 231274-WTC-CV-APPL-007 0
18 - 231274-WTC-CV-APPL-008 0
19 - 231274-WTC-CV-APPL-009 0
20 - 231274-WTC-CV-APPL-010 0
21 - 231274-WTC-CV-APPL-011 0
22 - 231274-WTC-CV-APPL-012 0
23 - 231274-WTC-CV-APPL-013 0
24 - 231274-WTC-CV-APPL-014 0
25 - 231274-WTC-CV-APPL-015 0
26 - 231274-WTC-CV-APPL-016 0
27 - 231274-WTC-CV-APPL-017 0
34 15.01.2025 231274-WTC-CV-APPL-018 0
35 15.01.2025 231274-WTC-CV-APPL-019 0

37 21.01.2025 231274-WTC-CV-APPL-020 0
38 23.01.2025 231274-WTC-CV-APPL-021 0
39 24.01.2025 231274-WTC-CV-APPL-022 0
PURPOSE OF SUBMITTAL

Material Approval
Material Approval
Material Approval
Material Approval
Material Approval
Material Approval
Material Approval (MAR-007, 007A, 008)
Quality plan & ITP
Method Statement
Mobilization Plan
Material Approval
Material Approval
Material Approval
Material Approval
Material Approval (MAR-27, 27A, 28)
Material Approval
Material Approval
Drawing Approval (MAR-
40,40A,41,41A,42,42A,43,43A,44,44A)
Material Approval (MAR-039)

Material Approval (MAR-45, 45A, 46, 46A,


47, 47A, 48, 48A
Material Approval (MAR-049, 50)
Work Methodology
TITLE DISICIPLINE

Rebar grouting chemical (R-KER-II Hybrid resin) Civil


Rebar grouting chemical (R-KEX-II Pure Epoxy) Civil
Rebar grouting chemical (HY 200-R V3) Civil
Rebar grouting chemical (RE500 V4) Civil
Rebar grouting chemical (FIS V PLUS) Civil
Rebar grouting chemical (FIS EM PLUS) Civil
Ready mix concrete (Grade M40)-RCC & SCC Civil
Quality assurance plan & ITP Civil
Work method statement Civil
Work mobilization plan Civil
Rebar grouting chemical (VM 250) Civil
Rebar grouting chemical (PE 510 PURE EPOXY) Civil
Ready mix concrete (Grade M40)-RCC & SCC Civil
Epoxy based bond code (Nitobond EP) Civil
Ready mix concrete (Grade M40)-RCC & SCC, M-25 (RCC) Civil
Epoxy based bond code (Dr. Fixit pidicrete URP) Civil
Epoxy bond code (Rearm bond EBA) Civil
Approval request for Various grade of Concrete Mix design Civil
AAC Block Civil

Approval request for Ready Mix Concrete Civil


Approval request for Cebex 100, Renderoe plug Civil
Methodology for Pressure Grouting Civil
RECEIVED AT
CONTRACTOR NAME ISSUE DATE FINAL STATUS
TNR
APPL 23.12.2024 24.12.2024 Approved
APPL 23.12.2024 24.12.2024 Approved
APPL 23.12.2024 24.12.2024 Approved
APPL 23.12.2024 24.12.2024 Approved
APPL 23.12.2024 24.12.2024 Hold
APPL 23.12.2024 24.12.2024 Hold
APPL 23.12.2024 24.12.2024 Rejected
APPL 23.12.2024 24.12.2024 Resubmit
APPL 23.12.2024 24.12.2024 Resubmit
APPL 23.12.2024 24.12.2024 Hold
APPL 23.12.2024 24.12.2024 Hold
APPL 23.12.2024 24.12.2024 Hold
APPL 23.12.2024 24.12.2024 Rejected
APPL 23.12.2024 24.12.2024 Approved
APPL 23.12.2024 24.12.2024 Rejected
APPL 23.12.2024 24.12.2024 Approved
APPL 23.12.2024 24.12.2024 Hold
APPL 15.01.2025 15.01.2025 Approved as Noted
APPL 16.01.2025 16.01.2025 NA

APPL 21.01.2025 21.01.2025 Approved as Noted


APPL 23.01.2025 23.01.2025 Approved
APPL 24.01.2025 24.01.2025
2ND SUBMISSION
REVISION ISSUE DATE REMARKS
RECEIVED AT TNR

03.01.2025 R1 06.01.2025
03.01.2025 R1 06.01.2025

25.01.2025 R1 25.01.2025