Lab # 1 COMM-24W - Report Marking
Lab # 1 COMM-24W - Report Marking
CAN/ULC-S536-13
CUSTOMER
Chrysler LLC
BUILDING
Chrysler R&D building
This site has been inspected and tested in compliance with applicable standards.
Completed
Friday, July 29
ACCEPTED BY TESTED BY
Brett Titchner
G Comments
H A copy of this report will be given to the following who is the owner Yes No --
This is to be certify that the information contained in this Fire Alarm Anual Test and Inspection Report is correct and
complete.
Yes = Tested Correctly No = Did Not Test Correctly N/A = Not Applicable
(REFER TO DEFICIENCIES, C2.13) FUNCTION OR FEATURE NOT PROVIDED ON THIS FIRE
ALARM SYSTEM
F Ground fault tested on positive and negative initiates trouble signal. Yes No N/A
I Automatic transfer from alert signal to alarm signal operates. Yes No N/A
J Manual transfer from alert signal to alarm signal operates. Yes No N/A
Automatic transfer from alert signal to alarm signal cancel (acknowledge)
K Yes No N/A
feature operates on a two-stage system.
O Alarm signal, when silenced, automatically reinitiates upon subsequent alarm. Yes No N/A
Audible and visual alert signals and alarm signals programmed and operate
Q Yes No N/A
per design and specification; or documentation as detailed in Appendix E,
Description of Fire Alarm System for Inspection and Test Procedures.
Input circuit, alarm and supervisory operation, including audible and visual
R Yes No N/A
indication operates.
X Coded signal sequences are not interrupted by subsequent alarms. Yes No N/A
AB Main power supply to emergency power supply transfer operates. Yes No N/A
Smoke detector alarm verification (status change confirmation) verified. [Refer
AC Yes No N/A
Subsection 6.7.4.3, Smoke Detector Alarm Verification (Status Change
Confirmation)].
F Ground fault tested on positive and negative initiates trouble signal. Yes No N/A
I Automatic transfer from alert signal to alarm signal operates. Yes No N/A
J Manual transfer from alert signal to alarm signal operates. Yes No N/A
Automatic transfer from alert signal to alarm signal cancel (acknowledge)
K Yes No N/A
feature operates on a two-stage system.
O Alarm signal, when silenced, automatically reinitiates upon subsequent alarm. Yes No N/A
Audible and visual alert signals and alarm signals programmed and operate
Q Yes No N/A
per design and specification; or documentation as detailed in Appendix E,
Description of Fire Alarm System for Inspection and Test Procedures.
Input circuit, alarm and supervisory operation, including audible and visual
R Yes No N/A
indication operates.
X Coded signal sequences are not interrupted by subsequent alarms. Yes No N/A
AB Main power supply to emergency power supply transfer operates. Yes No N/A
Smoke detector alarm verification (status change confirmation) verified. [Refer
AC Yes No N/A
Subsection 6.7.4.3, Smoke Detector Alarm Verification (Status Change
Confirmation)].
F Ground fault tested on positive and negative initiates trouble signal. Yes No N/A
I Automatic transfer from alert signal to alarm signal operates. Yes No N/A
J Manual transfer from alert signal to alarm signal operates. Yes No N/A
Automatic transfer from alert signal to alarm signal cancel (acknowledge)
K Yes No N/A
feature operates on a two-stage system.
O Alarm signal, when silenced, automatically reinitiates upon subsequent alarm. Yes No N/A
Audible and visual alert signals and alarm signals programmed and operate
Q Yes No N/A
per design and specification; or documentation as detailed in Appendix E,
Description of Fire Alarm System for Inspection and Test Procedures.
Input circuit, alarm and supervisory operation, including audible and visual
R Yes No N/A
indication operates.
X Coded signal sequences are not interrupted by subsequent alarms. Yes No N/A
AB Main power supply to emergency power supply transfer operates. Yes No N/A
Smoke detector alarm verification (status change confirmation) verified. [Refer
AC Yes No N/A
Subsection 6.7.4.3, Smoke Detector Alarm Verification (Status Change
Confirmation)].
Device Description:
F Output circuits for selective voice paging, including visual indication, operates. Yes No N/A
Output circuits for selective voice paging trouble operation, including visual
G Yes No N/A
indication, operates.
C Correct designations for common control functions and indicators. Yes No N/A
C Correct designations for common control functions and indicators. Yes No N/A
C Correct designations for common control functions and indicators. Yes No N/A
A Fused in accordance with the manufacturer's marked rating of the system. Yes No N/A
Battery voltage and current with main power supply alarm system in Voltage: 25.1 V dc
D
supervisory condition. Current:
Battery voltage and current with main power supply alarm system in full load Voltage: 24.8 V dc
E
alarm condition. Current: 13.5 A
F Charging current on a fully charged battery. 2A
(iii) Silent accelerated test. (Refer to Appendix F2, Silent Accelerated Test);or Yes No N/A
(iv) A battery capacity meter test. (Refer to Appendix F3, Battery Capacity
Yes No N/A
Meter Test); or
(v) In lieu of the above battery tests, replace the battery with a new set having
Yes No N/A
a current date code, amp-hour capacity and type as recommended by the
manufacturer.
S Battery voltage not less than 85% of its rating after the tests. Yes No N/A
T Generator provides power to the AC circuit serving the fire alarm system. Yes No N/A
Trouble condition at the emergency generator shall result in an audible
U Yes No N/A
common trouble signal and a visual indication at the required annunciator.
N Multi-line sequential display operates as per Clause 6.4.1(N), where utilized. Yes No N/A
N Multi-line sequential display operates as per Clause 6.4.1(N), where utilized. Yes No N/A
Printer location:
Confirm that a trouble signal received at the control unit or transponder under
A Yes No N/A
an open loop fault.
Where fault isolation modules are installed in data communication links
B Yes No N/A
serving field devices, wiring shall be shorted on the isolated side, annunciation
of the fault confirmed, and then a field device on the source side shall be
operated, and activation confirmed at control unit or transponder.
Where fault isolation in data communication links is provided between control
C
units and transponders and between transponders, introduce a short circuit
fault and confirm annunciation of the fault and operation outside the shorted
section between each pair of:
The fire signal receiving center transmitter is integral to the fire alarm control
A Yes No N/A
unit.
An interconnection between the fire alarm control unit and a separate fire
B Yes No N/A
signal receiving center transmitter is provided.
OPERATION OF ANCILLARY
RECORD SPECIFIC LIST OF ANCILARY CIRCUIT
CIRCUIT CONFIRMED
Alarm to Plant 3 Yes No
C2.13 DEFICIENCIES
C2.14 RECOMMENDATIONS
EQUIPMENT CREATED CREATION CORRECTIVE PROPOSED
ADDRESS DESCRIPTION IMAGE
TYPE BY DATE ACTION SOLUTION
C2.15 REMARKS
- All Sprinkler flow switches and low pressure switches were “finger tripped”. The operability of these device should
be tested with actually flowing water and dropping the air pressure on the appropriate sprinkler systems by a licensed
sprinkler fitter.
- It was noticed outside the RAM truck boardroom that the fire alarm DB levels were 40 DB. Recommend adding horn
or horn/strobe to this area. It was also noticed there is no horn in the main lobby, recommend adding in this location.
- The elastomer lab and the fabrication lab DB levels are over 100 DB. These horns cannot be reattached to a lower
wattage, replacement required to lower DB levels.
- Both loop one and Loop 2 are wired DCLB, in the event of a short on the address of the loop everything on the loop
will be coming operative. Recommend re-wiring loops to DCLA with fault isolators every 25 devices as recommended
by the manufacturer.
- Annunciator points are being shared for an area zone, sprinkler flows and duct detectors. Recommend separating
zones, flows and duct detectors to have their own annunciator points as per OBC 3.2.4.9.
- The electromagnetic locks in the building are automatically reset upon reset of the fire alarm panel, it is
recommended that they be rewired to reset manually via manual keyswitch as per OBC 3.4.6.16(4) and that this
keyswitch be located as per OBC 3.4.6.16(4) for any door with an electromagnetic lock equipped on it, it should also
comply with OBC 3.4.6.16(4)(g).
- Air handler 6 supply and return duct detectors and the CQEC supply duct detector are mounted above a drop
ceiling, and should have a remote LED to show below the ceiling that they are in an alarm state.
“Y” Yes - Acceptable “N” No – Unacceptable (Explain NO answers in Remarks) “N/A” Not Applicable
,,,,,,,,,
FIRE PUMP LATCH SUPERV Y N Y Y N100 Y 07/29/2022 15:03:38 PM
RUNNING | J L02M031
-22
DUCT LATCH SUPERV Y N Y Y N100 Y 07/04/2022 11:09:07 AM
DETECTOR L01M024
POWER |
LOSS NEW
RTS
SIGNAL CCT LATCH SUPERV Y N Y Y N100 Y 07/05/2022 12:23:50 PM
POWER | L01M025
LOSS NEW
RTS
SIGNAL LATCH SUPERV Y N Y N100 Y 07/05/2022 12:21:18 PM
CCT#11 L01M074
POWER |
LOSS, DYNO
SIGNAL CCT LATCH SUPERV Y N Y Y N100 Y 07/05/2022 12:23:18 PM
POWER | L02M027
LOSS, XP6-1
SIGNAL CCT LATCH SUPERV Y N Y Y N100 Y 07/05/2022 12:23:13 PM
POWER | L02M029
LOSS, XP6-2
FIRE PUMP LATCH SUPERV Y N Y Y N100 Y 07/05/2022 12:07:26 PM
TROUBLE/ | L02M032
LOSS OF
PWR
Z001,,,,,,,,,
KITCHEN MONITOR N N/A N100 N/A Tested by Others 07/05/2022 12:57:09 PM
HOOD | L01M020
DISCHARGE
OFFICE TO PULL STATION Y N Y Y N100 Y 07/04/2022 10:24:47 AM
PLANT | L01M030
DOUBLE
DOORS
OFFICE WEST PULL STATION Y N Y Y N100 Y 07/07/2022 19:27:14 PM
| ENTRANCE L01M004
OFFICE EAST PULL STATION Y N Y Y N100 Y 07/04/2022 09:35:07 AM
DOOR G-6 L01M016
KITCHEN PULL STATION Y N Y Y N100 Y 07/04/2022 09:34:32 AM
DOOR L01M003
OFFICE EAST PULL STATION Y N Y Y N100 Y 07/04/2022 09:35:47 AM
EXIT | L01M005
DOOR
EMPLOYEE PULL STATION Y N Y Y N100 Y 07/04/2022 09:33:02 AM
ENT WEST | L01M032
VESTIBULE
OFFICE TO PULL STATION Y N Y Y N100 Y 07/04/2022 09:36:01 AM
MAIN LOBBY | L01M034
DOUBLE
DOORS
Z001,,,,,,,,,
OFFICE TO PULL STATION Y N Y Y N100 Y 07/04/2022 09:37:37 AM
LOBBY NTH | L01M036
SINGLE
DOOR
OFFICE TO PULL STATION Y N Y Y N100 Y 07/04/2022 09:39:08 AM
WASHRM STH L01M037
| CORRIDOR
G12
MAIN LOBBY PULL STATION Y N Y Y N100 Y 07/04/2022 09:36:37 AM
| VESTIBULE L01M038
CAFETERIA PULL STATION Y N Y Y N100 Y 07/04/2022 09:34:02 AM
EXIT L01M001
MAIN LOBBY PULL STATION Y N Y Y N100 Y 07/04/2022 09:36:22 AM
L01M002
OFFICE WATERFLOW Y N Y Y N100 Y 25 Seconds 07/29/2022 15:44:19 PM
SPRINKLER L01M054
| J-10
Z002,,,,,,,,,
FM200 MONITOR N N/A N100 N/A Tested by Fire 07/05/2022 12:57:09 PM
DISCHARGE L01M048 Defence
| OLD RTS E-9
PUMP ROOM PULL STATION Y N Y Y N100 Y 07/04/2022 10:18:11 AM
EXIT DOOR | L01M017
OLD RTS E-6
OLD RTS PULL STATION Y N Y Y N100 Y 07/04/2022 10:00:54 AM
MEZZANINE L01M014
| C-7
OLD RTS PULL STATION Y N Y Y N100 Y 07/04/2022 10:53:14 AM
MEZZANINE L01M015
| WEST E-6
AHU-201 Smoke (Duct I) Y N Y Y N100 Y 1.4 in/h20 07/04/2022 10:54:04 AM
SUPPLY L01D014
DUCT | RTS
MEZZ D-7
AHU-201 Smoke (Duct I) Y N Y Y N100 Y 07/04/2022 10:51:40 AM
RETURN L01D015
DUCT | RTS
MEZZ D-7
AHU-202 Smoke (Duct I) Y N Y Y N100 Y 1.2 in/h20 07/04/2022 10:54:40 AM
SUPPLY L01D016
DUCT | RTS
MEZZ D-8
AHU-202 Smoke (Duct I) Y N Y Y N100 Y 1.3 in/h20 07/04/2022 10:52:04 AM
RETURN L01D017
DUCT | RTS
MEZZ D-8
AHU-203 Smoke (Duct I) Y N Y Y N100 Y 1.1 in/h20 07/05/2022 17:36:51 PM
SUPPLY L01D018
DUCT | RTS
CNTRL RM
ENVIROMENT WATERFLOW Y N Y Y N100 Y 25 Seconds 07/05/2022 12:56:19 PM
AL BOOTH | L01M058
D-9
Z003,,,,,,,,,
GARAGE PULL STATION Y N Y Y N100 Y 07/04/2022 09:53:49 AM
OFFICE | L01M018
C-11
SOUTH EAST PULL STATION Y N Y Y N100 Y 07/04/2022 09:46:28 AM
GARAGE | A- L02M001
17
SOUTH EAST PULL STATION Y N Y Y N100 Y 07/04/2022 09:45:48 AM
GARAGE | A- L02M002
19
Z003,,,,,,,,,
AHU-205 Smoke (Duct I) Y N Y Y N100 Y 1.2 in/h20 07/05/2022 17:18:22 PM
SUPPLY L01D021
DUCT |
GARAGE C-10
RTU-201 Smoke (Duct I) Y N Y Y N100 Y 1.4 in/h20 07/05/2022 17:22:01 PM
RETURN L01D024
DUCT |
GARAGE C-12
RTU-201 Smoke (Duct I) Y N Y Y N100 Y 1.1 in/h20 07/05/2022 17:22:26 PM
SUPPLY L01D023
DUCT |
GARAGE C-12
AHU-205 Smoke (Duct I) Y N Y Y N100 Y 1.2 in/h20 07/05/2022 17:17:52 PM
RETURN L01D022
DUCT |
GARAGE C-10
AHU-206 Smoke (Duct I) Y N Y Y N100 Y 1.3 in/h20 07/05/2022 17:13:22 PM
SUPPLY L02D001
DUCT |
GARAGE C-18
AHU-206 Smoke (Duct I) Y N Y Y N100 Y 1.3 in/h20 07/05/2022 17:14:20 PM
RETURN L02D002
DUCT |
GARAGE C-18
GARAGE WATERFLOW Y N Y Y N100 Y 25 Seconds 07/05/2022 12:52:04 PM
OFFICE | L01M072
D-11
DYNO ROOM WATERFLOW Y N Y Y N100 Y 25 Seconds 07/05/2022 12:56:30 PM
| B-11 L01M068
GARAGE WATERFLOW Y N Y Y N100 Y 25 Seconds 07/05/2022 12:56:24 PM
SPRINKLER L01M064
| A-11
Z004
CHILLER/MEC Smoke (Photo) Y N Y Y N100 Y Heat/Smoke Combo 07/05/2022 18:11:10 PM
H ROOM | B- L02D010
23
Z004,,,,,,,,,
CHILLER PULL STATION Y N Y Y N100 Y 07/04/2022 09:43:33 AM
MECH ROOM L02M003
| B-23
SOUTH EXIT PULL STATION Y N Y Y N100 Y 07/04/2022 09:45:03 AM
DOOR B-22 L02M004
PAINT MIX PULL STATION Y N Y Y N100 Y 07/04/2022 09:42:42 AM
ROOM D-23 L02M005
CHILLER RM WATERFLOW Y N Y Y N100 Y 20 Seconds 07/04/2022 12:17:42 PM
SPRINKLER | L02M059
B-22
SOUTH EAST Y N Y Y N100 Y 25 Seconds 07/04/2022 12:19:57 PM
SPRINKLER | L02M056
B-22
Z005,,,,,,,,,
SOUTH WEST PULL STATION Y N Y Y N100 Y 07/04/2022 09:41:32 AM
EXIT DOOR | L02M007
G-22
WEST EXIT PULL STATION Y N Y Y N100 Y 07/04/2022 09:40:57 AM
DOOR | J- L02M008
20
WEST EXIT PULL STATION Y N Y Y N100 Y 07/04/2022 09:39:42 AM
DOOR | J- L02M009
13
WEST WATERFLOW Y N Y Y N100 Y 27 Seconds 07/04/2022 12:05:16 PM
SPRINKLER L02M063
| J-20
Z005,,,,,,,,,
WEST WATERFLOW Y N Y Y N100 Y 10 Seconds 07/04/2022 12:00:45 PM
SPRINKLER L02M066
| J-13
CQEC OFFICE WATERFLOW Y N Y Y N100 Y 27 Seconds 07/04/2022 12:09:26 PM
SPRNKLR | J- L02M067
20
FIRE PUMP WATERFLOW Y N Y Y N100 Y 48 Seconds 07/05/2022 12:04:09 PM
ROOM | J- L02M089
23
WEST WATERFLOW Y N Y Y N100 Y 27 Seconds 07/04/2022 12:11:29 PM
MEZZANINE L02M070
| J-20
Z005,Z062,,,,,,,,
AC-18J Smoke (Duct P) Y N Y Y N100 Y 1.3 in/h20 07/05/2022 17:53:13 PM
SUPPLY L02D003
DUCT | CQE
Z006,,,,,,,,,
WATERFLOW Y N Y Y N100 Y 17 Seconds 07/05/2022 12:56:42 PM
L02M010
Z007,,,,,,,,,
AHU1 SUPPLY Smoke (Duct I) Y N Y Y N100 Y 1.2 in/h20 07/04/2022 10:56:55 AM
DUCT | L01D012
NEW RTS
MEZZ
AHU6 SUPPLY Smoke (Duct I) Y N Y N/A N100 N/A 1.2 in/h20 07/08/2022 20:52:32 PM
DUCT | L01D025
NEW RTS
MEZZ
AHU4 SUPPLY Smoke (Duct I) Y N Y Y N100 Y 1.3 in/h20 07/04/2022 11:06:26 AM
DUCT | L01D031
NEW RTS
MEZZ
AHU4 Smoke (Duct I) Y N Y N100 Y 1.3 in/h20 07/05/2022 17:32:52 PM
RETURN L01D032
DUCT |
NEW RTS
MEZZ
AHU6 Smoke (Duct I) Y N Y N/A N100 N/A 1.2 in/h20 07/08/2022 20:52:32 PM
RETURN L01D026
DUCT |
NEW RTS
MEZZ
AHU5 SUPPLY Smoke (Duct I) Y N Y Y N100 Y 1.2 in/h20 07/04/2022 11:01:50 AM
DUCT | L01D027
NEW RTS
MEZZ
AHU5 Smoke (Duct I) Y N Y Y N100 Y 1.2 in/h20 07/04/2022 11:00:55 AM
RETURN L01D028
DUCT |
NEW RTS
MEZZ
DET#6 Smoke (Ion) Y N Y Y N100 Y 07/05/2022 18:30:39 PM
CONTROL RM L01D006
| UNDER
FLOOR
SUBSTATION Smoke (Ion) Y N Y Y N100 Y 07/05/2022 11:48:44 AM
WEST | L01D033
NEW RTS
MEZZ
SUBSTATION Smoke (Ion) Y N Y Y N100 Y 07/05/2022 11:49:15 AM
CENTER | L01D034
NEW RTS
MEZZ
SUBSTATION Smoke (Ion) Y N Y Y N100 Y 07/05/2022 11:49:59 AM
EAST | L01D035
NEW RTS
MEZZ
DET#2 Smoke (Ion) Y N Y Y N100 Y 07/05/2022 18:16:23 PM
CONTROL RM L01D002
| UNDER
FLOOR
DET#3 Smoke (Ion) Y N Y Y N100 Y 07/05/2022 18:16:36 PM
CONTROL RM L01D003
| UNDER
FLOOR
DET#4 Smoke (Ion) Y N Y Y Y 07/05/2022 18:17:23 PM
CONTROL RM
| UNDER
FLOOR
DET#5 Smoke (Ion) Y N Y Y N100 Y 07/05/2022 18:19:41 PM
CONTROL RM L01D005
| UNDER
FLOOR
DET#7 Smoke (Ion) Y N Y Y N100 Y 07/05/2022 18:18:17 PM
CONTROL RM L01D007
| UNDER
FLOOR
Z007,,,,,,,,,
DET#8 Smoke (Ion) Y N Y Y N100 Y 07/05/2022 18:19:11 PM
CONTROL RM L01D008
| UNDER
FLOOR
DET#9 Smoke (Ion) Y N Y Y N100 Y 07/05/2022 18:20:38 PM
CONTROL RM L01D009
| UNDER
FLOOR
DET#10 Smoke (Ion) Y N Y Y N100 Y 07/05/2022 18:21:31 PM
CONTROL RM L01D010
| UNDER
FLOOR
DET#11 ALFA Smoke (Ion) Y N Y Y N100 Y 07/05/2022 18:22:42 PM
ROMEO RM | L01D011
UNDER
FLOOR
DET#1 Smoke (Ion) Y N Y Y N100 Y 07/05/2022 18:14:46 PM
CONTROL RM L01D001
| UNDER
FLOOR
CONTROL/PU WATERFLOW Y N Y Y N100 Y 17 Seconds 07/04/2022 12:28:48 PM
MP ROOMS | L01M026
NEW RTS FF-
6
RTS & WATERFLOW Y N Y Y N100 Y 0 Seconds 07/04/2022 12:25:43 PM
MEZZANINE L01M010
AREA | NEW
RTS FF-6
Z007,Z129
AHU3 Smoke (Duct P) Y N Y Y N100 Y 1.2 in/h20 07/05/2022 18:02:05 PM
RETURN L01D030
DUCT |
NEW RTS
MEZZ
Z007,Z129,,,,,,,,
AHU3 SUPPLY Smoke (Duct P) Y N Y Y N100 Y 1.2 in/h20
DUCT | L01D029
NEW RTS
MEZZ
Z009
3900HS DYNO LATCH SUPERV Y N Y Y N100 Y 07/05/2022 11:37:37 AM
CHAMBER | L01M040
1ST FLR
3900HS DYNO LATCH SUPERV Y N Y Y N100 Y 07/05/2022 11:37:56 AM
DUCT | 1ST L01M041
FLR
Z009,,,,,,,,,
3900HD LATCH SUPERV Y N Y Y N100 Y 07/05/2022 09:09:22 AM
PANEL FIRE L01M057
| DYNO 1ST
FL
THERMOTRO MONITOR N N/A N100 N/A Tested by Fire 07/05/2022 12:57:09 PM
N CHAMBER L01M078 Defence
| ALARM F1-17
4900 PANEL MONITOR Y N Y N/A N100 N/A Tested by Fire 07/29/2022 15:03:38 PM
DISCHARGE | L01M103 Defence
DYNO BOOTH
DYNO 3900 PULL STATION Y N Y Y N100 Y 07/05/2022 13:46:13 PM
MEZZ | L01M050
DYNO D1-18
SOUTH PULL STATION Y N Y Y N100 Y 07/04/2022 09:49:34 AM
STAIRS | L01M051
DYNO BSMT
Z009,,,,,,,,,
SOUTH PULL STATION Y Y Y Y N100 Y Manual station in 07/04/2022 09:47:23 AM
STAIRS EXIT L01M052 blocked by door when
| DYNO 1ST door propped open
FL
NORTH PULL STATION Y N Y Y N100 Y 07/04/2022 09:49:34 AM
STAIRS | L01M045
DYNO BSMT
NORTH PULL STATION Y N Y Y N100 Y 07/04/2022 09:49:58 AM
STAIRS EXIT L01M046
| DYNO 1ST
FL
DYNO 4900 PULL STATION Y N Y Y N100 Y 07/04/2022 09:51:33 AM
MEZZ | L01M047
DYNO
DYNO NORTH Smoke (Photo) Y N Y Y N100 Y 07/05/2022 11:41:56 AM
STAIRS | L01D036
DYNO 1ST FL
DYNO SOUTH Smoke (Photo) Y N Y Y N100 Y 07/05/2022 11:42:57 AM
STAIRS | L01D037
DYNO 1ST FL
DYNO WATERFLOW Y N Y Y N100 Y 3 Seconds 07/04/2022 12:20:42 PM
EXPANSION L02M097
| B-22
Z011,,,,,,,,,
OFFICE LOW LATCH SUPERV Y N Y Y N100 Y 07/05/2022 12:51:50 PM
PRESSURE | L01M056
J-10
Z012,,,,,,,,,
FM200 1ST LATCH SUPERV N N/A N100 N/A Tested by Fire 07/05/2022 12:57:09 PM
DETECTOR | L01M019 Defence
OLD RTS E-9
FM200 LATCH SUPERV N N/A N100 N/A Tested by Fire 07/05/2022 12:57:09 PM
TROUBLE L01M049 Defence
| OLD RTS E-9
ENVIROMENT LATCH SUPERV Y N Y Y N100 Y 07/05/2022 12:54:04 PM
AL BOOTH | L01M059
VALVE D-9
Z013,,,,,,,,,
GARAGE LOW LATCH SUPERV Y N Y Y N100 Y 07/05/2022 12:54:11 PM
PRESSURE | L01M066
A-11
DYNO ROOM LATCH SUPERV Y N Y Y N100 Y 07/05/2022 12:54:32 PM
VALVE | B- L01M069
11
GARAGE LATCH SUPERV Y N Y Y N100 Y 07/05/2022 12:52:09 PM
OFFICE | L01M073
VALVE D-11
Z014,,,,,,,,,
CHILLER RM LATCH SUPERV Y N Y Y N100 Y 07/04/2022 12:14:17 PM
SPRINKLER | L02M060
VALVE B-22
CHILLER LATCH SUPERV Y N Y Y N100 Y 07/04/2022 12:16:42 PM
ROOM LOW L02M061
| PRESS B-22
SOUTH EAST LATCH SUPERV Y N Y Y N100 Y 07/04/2022 12:14:36 PM
SPRINKLER | L02M057
VALVE B-22
S-E LATCH SUPERV Y N Y Y N100 Y 07/04/2022 12:19:12 PM
SPRINKLER L02M058
LOW |
PRESS B-22
Z015,,,,,,,,,
Z015,,,,,,,,,
FIRE PUMP LATCH SUPERV Y N Y Y N100 Y 07/29/2022 15:03:38 PM
SWT NOT IN | L02M030
AUTO J-23
WEST LOW LATCH SUPERV Y N Y Y N100 Y 07/04/2022 12:02:10 PM
PRESSURE | L02M068
J-13
CQEC OFFICE LATCH SUPERV Y N Y Y N100 Y 07/04/2022 12:08:16 PM
VALVE | J-20 L02M069
WEST LATCH SUPERV Y N Y Y N100 Y 07/04/2022 12:12:11 PM
MEZZANINE L02M071
VALVE | J-20
FIRE PUMP LATCH SUPERV Y N Y Y N100 Y 07/05/2022 12:02:08 PM
ROOM | L02M090
VALVE J-23
WEST LATCH SUPERV Y N Y Y N100 Y 07/04/2022 12:03:50 PM
SPRINKLER L02M064
VALVE | J-20
FIRE PUMP LATCH SUPERV Y N Y Y N100 Y 07/05/2022 11:58:10 AM
DISCHARGE | L02M033
VALVE V-4
FIRE PUMP LATCH SUPERV Y N Y Y N100 Y 07/05/2022 11:59:30 AM
SUCTION | L02M035
VALVE V-6
SUPP LATCH SUPERV Y N Y Y N100 Y 07/05/2022 12:00:12 PM
BYPASS L02M036
SUCTION |
VALVE V-7
WEST LOW LATCH SUPERV Y N Y Y N100 Y 07/04/2022 12:07:06 PM
PRESSURE | L02M065
J-20
SUPP LATCH SUPERV Y N Y Y N100 Y 07/05/2022 12:01:10 PM
BYPASS L02M034
DISCHARG |
VALVE V-5
Z016,,,,,,,,,
LIGHT LATCH SUPERV Y N Y Y N100 Y 07/05/2022 12:54:37 PM
TUNNEL DRY L02M011
SYS | LOW
PRESSURE
LIGHT LATCH SUPERV Y N Y Y N100 Y 07/05/2022 12:54:42 PM
TUNNEL DRY L02M013
SYS | VALVE
LIGHT LATCH SUPERV Y N Y Y N100 Y 07/05/2022 12:54:48 PM
TUNNEL FIRE L02M014
| HOSE VALVE
LIGHT LATCH SUPERV Y N Y N/A N100 N/A 07/05/2022 12:52:25 PM
TUNNEL L02M015
SOUTH |
YARD PIV
Z017,,,,,,,,,
CO2 SYS LATCH SUPERV N N/A N100 N/A Tested by Fire 07/05/2022 12:57:09 PM
SHUNT TRIP L01M021 Defence
| POWER GG-
9
RTS & LATCH SUPERV Y N Y Y N100 Y 07/05/2022 12:51:45 PM
MEZZANINE L01M011
AREA | VALVE
FF-6
CO2 LATCH SUPERV N N/A N100 N/A Tested by Fire 07/05/2022 12:57:09 PM
TROUBLE JJ- L01M013 Defence
6A | RTS
PUMP RM
CONTROL/PU LATCH SUPERV Y N Y Y N100 Y 07/05/2022 12:51:57 PM
MP ROOMS | L01M027
VALVE FF-6
Z019,,,,,,,,,
THERMOTRO LATCH SUPERV N N/A N100 N/A Tested by Fire 07/05/2022 12:57:09 PM
N CHAMBER L01M079 Defence
| TBL F1-17
DYNO LATCH SUPERV Y N Y Y N100 Y 07/04/2022 12:14:57 PM
EXPANSION L02M098
| VALVE B-22
3900HD LATCH SUPERV Y N Y Y N100 Y 07/05/2022 09:16:57 AM
PANEL L01M060
TROUBLE |
DYNO 1ST FL
4900 PNL TST TRACK SUPERV Y N Y Y N100 Y Tested by Fire 07/29/2022 15:03:38 PM
SHUTDWN | L01M101 Defence
DYNO BOOTH
Z020,,,,,,,,,
4900 PANEL TRACK SUPERV Y N Y Y N100 Y Tested by Fire 07/29/2022 15:03:38 PM
TRB/SUPV | L01M100 Defence
DYNO BOOTH
Z021,,,,,,,,,
4900 PANEL TRACK SUPERV Y N Y N/A N100 N/A Tested by Fire 07/29/2022 15:03:38 PM
INTERLOCK | L01M102 Defence
DYNO BOOTH
Z030,,,,,,,,,
VEHICLE PULL STATION Y N Y Y N100 Y 07/04/2022 10:03:39 AM
DYN. SIM LAB L03M002
| CNTRL RM
N/W
VEHICLE PULL STATION Y N Y Y N100 Y 07/04/2022 10:02:50 AM
DYN. SIM LAB L03M001
| CNTRL RM E.
VEHICLE PULL STATION Y N Y Y N100 Y 07/04/2022 10:03:20 AM
DYN. SIM LAB L03M003
| SIM. ROOM
Z031,,,,,,,,,
VEHICLE Smoke (Duct P) Y N Y Y N100 Y 1.3 in/h20 07/04/2022 11:12:21 AM
DYNAMIC SIM L03D001
| LAB - ACU-12
Z032,,,,,,,,,
VEHICLE Smoke (Duct P) Y N Y Y N100 Y 1.3 in/h20 07/04/2022 11:14:01 AM
DYNAMIC SIM L03D002
| LAB - ACU-13
Z033,,,,,,,,,
VEHICLE WATERFLOW Y N Y Y N100 Y 21 Seconds 07/04/2022 11:59:20 AM
DYN. SIM LAB L03M020
| FLOW
Z034,,,,,,,,,
VEHICLE LATCH SUPERV Y N Y Y N100 Y 07/04/2022 11:57:05 AM
DYN. SIM LAB L03M021
| SPK. VLV
Z062,,,,,,,,,
AC-18J DD RELAY Y N Y N/A N100 N/A 07/05/2022 17:47:37 PM
RELAY | L02M062
CQEC OFFICE
Z129
AHU 3 Y N Y N/A N100 N/A 07/05/2022 18:02:38 PM
RETURN L01M031
DUCT DE |
FAN
SHUTDOWN
Z129,,,,,,,,,
Z129,,,,,,,,,
AHU3 SUPPLY RELAY Y N Y N/A N100 N/A 07/04/2022 11:02:30 AM
DUCT DET | L01M029
FAN
SHUTDOWN
Z201,Z000,,,,,,,,
EMS RELAY Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
SHUTDOWN L01M090
RTS |
EXPANSION
HVAC-2 RELAY Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
SHUTDOWN L01M062
| DYNO
HVAC-1 RELAY Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
SHUTDOWN L01M061
| DYNO
VEHICLE RELAY Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
DYN. SIM LAB L03M010
| ACU-12
S/DWN
VEHICLE RELAY Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
DYN. SIM LAB L03M011
| ACU-13
S/DWN
VEHICLE RELAY Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
DYN. SIM LAB L03M012
| SFTY
S/DOWN
REF-1 RELAY Y N Y N/A N/A 07/29/2022 15:03:38 PM
SHUTDOWN
| DYNO
REF-2 RELAY Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
SHUTDOWN L01M065
| DYNO
REF-3 RELAY Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
SHUTDOWN L01M067
| DYNO
REF-4 RELAY Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
SHUTDOWN L01M070
| DYNO
DYNO 4900 RELAY Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
SHUTDOWN L01M075
| DYNO
BOOTH
HVAC101 RELAY Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
SHUTDOWN L01M081
HVAC102 RELAY Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
SHUTDOWN L01M082
HVAC103 RELAY Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
SHUTDOWN L01M083
EMS RELAY Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
SHUTDOWN L01M084
| MEZZ PANEL
EMS RELAY Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
SHUTDOWN L01M085
| GARAGE
PANEL
Z202,Z000,,,,,,,,
HORN CCT#11 HORN CIRCUIT Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
DYNO | L01M071
EXPANSION
HORN CCT#9 HORN CIRCUIT Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
RTS | L01M088
EXPANSION
HORN CCT#8 HORN CIRCUIT Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
RTS | L01M087
EXPANSION
Z202,Z000,,,,,,,,
HORN CCT#7 HORN CIRCUIT Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
RTS | L01M086
EXPANSION
HORN CCT#1 HORN CIRCUIT Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
OFFICE, | L02M020
OLD RTS#2
HORN CCT#5 HORN CIRCUIT Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
OLD | RTS L02M021
CELL#1
HORN CCT#6 HORN CIRCUIT Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
DOOR SLAM | L02M022
SHAKER, PS
HORN HORN CIRCUIT Y N Y N/A N100 N/A
CCT#10 MEZZ L02M023
| J-13 AREA
HORN CCT#2 HORN CIRCUIT Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
S-OFFICE, | L02M024
GARAGE
AREAS
HORN CCT#3 HORN CIRCUIT Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
OLD RTS, | L02M025
PUMP RM
HORN CCT#4 HORN CIRCUIT Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
GARAGE, | L02M026
DYNO AREAS
Z203,Z000,,,,,,,,
OFFICE RELAY Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
DOOR L01M094
CONTROL
GUARDSHAC RELAY Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
K AUDIBLE & | L01M089
GATE
CONTROL
GATE RELAY Y N Y N/A N100 N/A 07/29/2022 15:03:38 PM
CONTROL L01M080
ZL0001
3900HS RELAY Y N Y N/A N100 N/A 07/05/2022 11:38:15 AM
PANEL ALARM L01M042
| RELAY
Zone Unassigned
[Other] Y N Y N/A Horn #3 N/A 07/04/2022 10:17:38 AM
EOL
Column
C5
ANCILLARY DEVICE Y N Y N/A N100 N/A 07/04/2022 10:31:58 AM
CIRCUIT ALARM
TO PLANT
3
ANCILLARY DEVICE Y N Y N/A N100 N/A 07/04/2022 10:31:46 AM
CIRCUIT TROUBLE
TO PLANT
3
Heat Detector Y N Y Y 3900HD Y 07/05/2022 09:48:31 AM
DYNO -
DUCT
Heat Detector Y N Y Y 3900HD Y 07/05/2022 09:48:35 AM
DYNO -
CHAMBE
R
CQEC OFFICE Horn Y N Y N/A N100 N/A 07/05/2022 12:10:40 PM
CQEC Horn Y N Y N/A N100 N/A 07/05/2022 12:10:38 PM
CONFERENC
E ROOM -
MASERATI
BOARDROOM
Zone Unassigned
DYNO 4900 Horn Y N Y N/A N100 N/A 07/05/2022 12:10:45 PM
BASEMENT
HYDRAULIC Horn Y N Y N/A N100 N/A 07/05/2022 12:11:03 PM
PUMP ROOM
WEST
RTS LAB Horn Y N Y N/A N100 N/A 07/05/2022 12:12:04 PM
NORTH
RTS CELL #2 Horn Y N Y N/A N100 N/A 07/05/2022 12:12:03 PM
SOUTH
COLUMN A13 Horn Y N Y N/A N100 N/A 07/05/2022 12:12:36 PM
RTS CELL #1 Horn Y N Y N/A N100 N/A 07/05/2022 12:11:53 PM
NORTH
OLD RTS Horn Y N Y N/A N100 N/A 07/05/2022 12:11:50 PM
MEZZANINE
WEST WALL
ENVIRONMEN Horn Y N Y N/A N100 N/A 07/05/2022 12:11:48 PM
TAL
CHAMBER PIT
COLUMN A7 Horn Y N Y N/A N100 N/A 07/05/2022 12:11:46 PM
RTS Horn Y N Y N/A N100 N/A 07/05/2022 12:11:43 PM
EXPANSION
MEZZ
COLUMN KK7
RTS Horn Y N Y N/A N100 N/A 07/05/2022 12:11:40 PM
EXPANSION
MEZZ
COLUMN
HH10
TEST CELL #4 Horn Y N Y N/A N100 N/A 07/05/2022 12:11:31 PM
WEST
RTS Horn Y N Y N/A N100 N/A 07/05/2022 12:11:35 PM
EXPANSION
MEZZ
COLUMN
CC10
TEST CELL #5 Horn Y N Y N/A N100 N/A 07/05/2022 12:11:25 PM
WEST
TEST CELL #6 Horn Y N Y N/A N100 N/A 07/05/2022 12:11:20 PM
WEST
HYDRAULIC Horn Y N Y N/A N100 N/A 07/05/2022 12:11:10 PM
PUMP ROOM
NORTH
OFFICE Horn Y N Y N/A N100 N/A 07/05/2022 12:12:54 PM
SOUTH
OFFICE Horn Y N Y N/A N100 N/A 07/05/2022 12:12:53 PM
NORTH
OFFICE Horn Y N Y N/A N100 N/A 07/05/2022 12:12:51 PM
OUTSIDE
TRAINING
ROOM
OFFICE Horn Y N Y N/A N100 N/A 07/05/2022 12:12:49 PM
NORTH
CORRIDOR
CAFETERIA Horn Y N Y N/A N100 N/A 07/05/2022 12:12:48 PM
GARAGE Horn Y N Y N/A N100 N/A 07/05/2022 12:12:46 PM
SUPV. OFFICE
COLUMN D22 Horn Y N Y N/A N100 N/A 07/05/2022 12:12:33 PM
BY OLD PAINT
MIX ROOM
COLUMN F22 Horn Y N Y N/A N100 N/A 07/05/2022 12:12:31 PM
Zone Unassigned
PENTHOUSE Horn Y N Y N/A N100 N/A 07/05/2022 12:12:15 PM
COLUMN J22
COLUMN G11 Horn Y N Y N/A N100 N/A 07/05/2022 12:12:14 PM
QUALITY Horn Y N Y N/A N100 N/A 07/05/2022 12:12:12 PM
ENGINEERIN
G OFFICE
TEST CELL #6 Horn / Strobe Y N Y N/A N100 N/A 07/05/2022 12:11:18 PM
WEST
TEST CELL #6 Horn / Strobe Y N Y N/A N100 N/A 07/05/2022 12:11:17 PM
EAST
RTS Horn / Strobe Y N Y N/A N100 N/A 07/05/2022 12:11:15 PM
EXPANSION
LAB BY
ENTRANCE
TO CELL #6
RTS Horn / Strobe Y N Y N/A N100 N/A 07/05/2022 12:11:13 PM
EXPANSION
LAB SOUTH
ROOM
TEST CELL #5 Horn / Strobe Y N Y N/A N100 N/A 07/05/2022 12:11:23 PM
WEST
TEST CELL #5 Horn / Strobe Y N Y N/A N100 N/A 07/05/2022 12:11:22 PM
EAST
RTS Horn / Strobe Y N Y N/A N100 N/A 07/05/2022 12:11:33 PM
EXPANSION
LAB WEST
TEST CELL #4 Horn / Strobe Y N Y N/A N100 N/A 07/05/2022 12:11:30 PM
WEST
TEST CELL #4 Horn / Strobe Y N Y N/A N100 N/A 07/05/2022 12:11:28 PM
WEST
TEST CELL #4 Horn / Strobe Y N Y N/A N100 N/A 07/05/2022 12:11:27 PM
EAST
COLUMN GG6 Horn / Strobe Y N Y N/A N100 N/A 07/05/2022 12:11:44 PM
DYNO Horn / Strobe Y N Y N/A N100 N/A 07/05/2022 12:11:01 PM
EXPANSION
SOUTH
STAIRS
BASEMENT
DYNO Y N Y N/A N100 N/A 07/05/2022 12:11:00 PM
EXPANSION
4900
CHAMBER
DYNO Horn / Strobe Y N Y N/A N100 N/A 07/05/2022 12:10:58 PM
EXPANSION
COLUMN F1-
15A
DYNO Horn / Strobe Y N Y N/A N100 N/A 07/05/2022 12:10:57 PM
EXPANSION
COLUMN F1-
17
DYNO Horn / Strobe Y N Y N/A N100 N/A 07/05/2022 12:10:55 PM
EXPANSION
COLUMN D1-
18
DYNO Horn / Strobe Y N Y N/A N100 N/A 07/05/2022 12:10:53 PM
EXPANSION
COLUMN A1-
17
DYNO Horn / Strobe Y N Y N/A N100 N/A 07/05/2022 12:10:51 PM
EXPANSION
COLUMN A1-
15C
Zone Unassigned
DYNO Horn / Strobe Y N Y N/A N100 N/A 07/05/2022 12:10:49 PM
EXPANSION
NORTH
STAIRS
BASEMENT
DYNO Horn / Strobe Y N Y N/A N100 N/A 07/05/2022 12:10:48 PM
EXPANSION
COLUMN B1-
15A
DYNO Horn / Strobe Y N Y N/A N100 N/A 07/05/2022 12:10:42 PM
BASEMENT
CENTRE F1-
15B
ISOLATOR @ Isolation Module Y N Y N/A N100L1 N/A 07/04/2022 10:31:20 AM
B-11 (NEW
DYNO AREA)
ISOLATOR @ Isolation Module Y N Y N/A N100L3 N/A 07/04/2022 10:31:17 AM
MAIN PANEL
(OUTGOING)
ISOLATOR @ Isolation Module Y N Y N/A N100L3 N/A 07/04/2022 10:31:14 AM
MAIN PANEL
(INCOMING)
DYNO 4900 Strobe Y N Y N/A N100 N/A 07/05/2022 12:10:44 PM
BASEMENT
RTS Strobe Y N Y N/A N100 N/A 07/05/2022 12:11:38 PM
EXPANSION
MEZZ
COLUMN
HH10
RTS Strobe Y N Y N/A N100 N/A 07/05/2022 12:11:36 PM
EXPANSION
MEZZ
COLUMN
CC10
RTS Strobe Y N Y N/A N100 N/A 07/05/2022 12:11:41 PM
EXPANSION
MEZZ
COLUMN KK7
RTS CELL #1 Strobe Y N Y N/A N100 N/A 07/05/2022 12:11:51 PM
NORTH
STEERING Y N Y N/A N100 N/A 07/05/2022 12:12:35 PM
TEST LAB
RTS CELL #2 Strobe Y N Y N/A N100 N/A 07/05/2022 12:12:01 PM
SOUTH
RTS CELL #2 Strobe Y N Y N/A N100 N/A 07/05/2022 12:12:00 PM
WEST
RTS CELL #2 Strobe Y N Y N/A N100 N/A 07/05/2022 12:11:57 PM
NORTH
RTS CELL #1 Strobe Y N Y N/A N100 N/A 07/05/2022 12:11:55 PM
COLUMN D8
HYDRAULIC Strobe Y N Y N/A N100 N/A 07/05/2022 12:11:12 PM
PUMP ROOM
EAST
HYDRAULIC Strobe Y N Y N/A N100 N/A 07/05/2022 12:11:08 PM
PUMP ROOM
NORTH
HYDRAULIC Strobe Y N Y N/A N100 N/A 07/05/2022 12:11:06 PM
PUMP ROOM
SOUTH
HYDRAULIC Strobe Y N Y N/A N100 N/A 07/05/2022 12:11:04 PM
PUMP ROOM
WEST
QUALITY Strobe Y N Y N/A N100 N/A 07/05/2022 12:12:10 PM
ENGINEERIN
G OFFICE
RTS LAB Strobe Y N Y N/A N100 N/A 07/05/2022 12:12:08 PM
COLUMN E8
Zone Unassigned
RTS LAB Strobe Y N Y N/A N100 N/A 07/05/2022 12:12:06 PM
COLUMN D8
PENTHOUSE Strobe Y N Y N/A N100 N/A 07/05/2022 12:12:26 PM
COLUMN J13
PENTHOUSE Strobe Y N Y N/A N100 N/A 07/05/2022 12:12:24 PM
COLUMN J15
PENTHOUSE Strobe Y N Y N/A N100 N/A 07/05/2022 12:12:22 PM
COLUMN J17
PENTHOUSE Strobe Y N Y N/A N100 N/A 07/05/2022 12:12:21 PM
COLUMN J18
PENTHOUSE Strobe Y N Y N/A N100 N/A
COLUMN J19
PENTHOUSE Strobe Y N N/A N100 N/A 07/05/2022 12:12:17 PM
COLUMN J21
GARAGE Strobe Y N Y N/A N100 N/A 07/05/2022 12:12:44 PM
SUPV. OFFICE
OUTSIDE
WALL
GARAGE Strobe Y N Y N/A N100 N/A 07/05/2022 12:12:42 PM
LUNCH ROOM
GARAGE Strobe Y N Y N/A N100 N/A 07/05/2022 12:12:40 PM
MENS
WASHROOM
GARAGE Strobe Y N Y N/A N100 N/A 07/05/2022 12:12:38 PM
WOMENS
WASHROOM
Chrysler LLC
For
Chrysler R&D building
3939 Rhodes Drive
Windsor, Ontario N8W 5B5
Canada
This site has been inspected and tested in compliance with applicable standards.
Completed
Friday, July 29, 2022
Test Session :2022 Annual Inspection
ACCEPTED BY TESTED BY
Brett Titchner
Chrysler LLC Honeywell Building Technologies
PO Box 3382 715 Peachtree Street, N.E.
Livonia, Michigan 48151 Atlanta, GA 30303
United States United States
INSPECTION STATUS
Acceptable
Inspection or maintenance completed
Inspector Information
Control Units
MANUFACTURER DESCRIPTION
Certification
The device sensitivity data specified herein was gathered according to the NFPA 72 standard for fire alarm and signaling systems on
Friday, July 29, 2022
ACCEPTED BY TESTED BY
07/29/2022 07/29/2022
Brett Titchner