Final year computer engineering students at NMIET are required to attend Project Stage-II, Review-I on 08/02/2025 at 09:00 am, focusing on complete project implementation. Presentations must include a comprehensive set of topics and adhere to specific guidelines, including attendance and uniform requirements. All project group members must finalize their presentations with their guides prior to the review, and no extensions will be granted.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
4 views1 page
Implementation: Notice
Final year computer engineering students at NMIET are required to attend Project Stage-II, Review-I on 08/02/2025 at 09:00 am, focusing on complete project implementation. Presentations must include a comprehensive set of topics and adhere to specific guidelines, including attendance and uniform requirements. All project group members must finalize their presentations with their guides prior to the review, and no extensions will be granted.
ENGINEERING AND TECHNOLOGY (NMIET) Under Administrative Support - PimpriChinchwad Education Trust (PCET) Approved by AICTE Accredited by NBA & NAAC Affiliated to SPPU Department of Computer Engineering Date:03/02/2025 Notice “Project Stage-II, Review-I” IMPLEMENTATION All final year computer engineering Students are hereby informed that PROJECT STAGE-II, REVIEW-I based on “Complete Project Implementation” is scheduled on date 08/02/2025, Saturday, at 09:00 am onwards. Attendance is compulsory for all students.
1. Presentation should include these points (Project Presentation contains PPTs
with minimum 35 Slides)- Project Title, Problem Domain , Existing System, problem statement, project Scope & objective, Literature Survey, review papers (in descending order latest to older), proposed system (Algorithm, methodology, Mathematical Model, Architecture), System design, flow chart, Basic UML Diagrams (Use case diagrams, Class diagram, activity Diagram, component Diagram, sequence Diagram), Project Implementation (Module wise design & Module wise Output), project testing results, Advantages, disadvantages, application, Conclusion, Future Scope, references & Annexure (Published paper & Certificates). 2. Finalization of project poster softcopy (from guide). 3. Status of survey & implementation papers. 4. Checking of project log book.
*Strictly follow Guidelines:
1. Compulsory all Project Group members need to be present. 2. All students need to finalized their PPT from respective guide before review. 3. 100% of the project implementation should be completed. 4. All students Strictly follow the reporting time & be in uniform. 5. No extension of project review.