Engineering Standard: IPS-E-PR-290
Engineering Standard: IPS-E-PR-290
ENGINEERING STANDARD
FOR
FIRST EDITION
JUNE 2015
June 2015 IPS-E-PR-290(1)
FOREWORD
The Iranian Petroleum Standards (IPS) reflect the views of the Iranian Ministry of Petroleum and are
intended for use in the oil and gas production facilities, oil refineries, chemical and petrochemical
plants, gas handling and processing installations and other such facilities.
IPS are based on internationally acceptable standards and include selections from the items
stipulated in the referenced standards. They are also supplemented by additional requirements
and/or modifications based on the experience acquired by the Iranian Petroleum Industry and the
local market availability. The options which are not specified in the text of the standards are
itemized in data sheet/s, so that, the user can select his appropriate preferences therein.
The IPS standards are therefore expected to be sufficiently flexible so that the users can adapt
these standards to their requirements. However, they may not cover every requirement of each
project. For such cases, an addendum to IPS Standard shall be prepared by the user which
elaborates the particular requirements of the user. This addendum together with the relevant IPS
shall form the job specification for the specific project or work.
The IPS is reviewed and up-dated approximately every five years. Each standards are subject to
amendment or withdrawal, if required, thus the latest edition of IPS shall be applicable
The users of IPS are therefore requested to send their views and comments, including any
addendum prepared for particular cases to the following address. These comments and
recommendations will be reviewed by the relevant technical committee and in case of approval will
be incorporated in the next revision of the standard.
GENERAL DEFINITIONS
Throughout this Standard the following definitions shall apply.
COMPANY :
Refers to one of the related and/or affiliated companies of the Iranian Ministry of Petroleum such as
National Iranian Oil Company, National Iranian Gas Company, National Petrochemical Company
and National Iranian Oil Refinery And Distribution Company.
PURCHASER :
Means the “Company" where this standard is a part of direct purchaser order by the “Company”,
and the “Contractor” where this Standard is a part of contract document.
CONTRACTOR:
Refers to the persons, firm or company whose tender has been accepted by the company.
EXECUTOR :
Executor is the party which carries out all or part of construction and/or commissioning for the
project.
INSPECTOR :
The Inspector referred to in this Standard is a person/persons or a body appointed in writing by the
company for the inspection of fabrication and installation work.
SHALL:
Is used where a provision is mandatory.
SHOULD:
Is used where a provision is advisory only.
WILL:
Is normally used in connection with the action by the “Company” rather than by a contractor,
supplier or vendor.
MAY:
Is used where a provision is completely discretionary.
June 2015 IPS-E-PR-290(1)
0. INTRODUCTION ............................................................................................................................. 2
1. SCOPE ............................................................................................................................................ 3
2. REFERENCES ................................................................................................................................ 3
3. DEFINITIONS AND TERMINOLOGY ............................................................................................. 3
4. SYMBOLS AND ABBREVIATIONS ............................................................................................... 4
5. UNITS .............................................................................................................................................. 4
6. FORMAT ......................................................................................................................................... 5
6.1 General ..................................................................................................................................... 5
6.2 Covers and Size ...................................................................................................................... 5
6.3 Titles ......................................................................................................................................... 5
6.4 Dividers .................................................................................................................................... 6
7. BASIC CONSIDERATIONS IN PREPARING OPERATING MANUALS ....................................... 6
8. NOTEWORTHY POINTS ................................................................................................................ 7
9. CONTENTS OF OPERATING MANUAL........................................................................................ 7
APPENDICES:
1
June 2015 IPS-E-PR-290(1)
0. INTRODUCTION
The Standard Practice Manuals titled as "Fundamental Required for the Project Design and
Engineering" is intended for convenience of use and a pattern of follow-up and also a guidance.
These Standard Engineering Practice Manuals, also indicate the check points to be considered by
the process engineers for assurance of fulfillment of prerequisitions at any stage in the
implementation of process plant projects.
It should be noted that these Iranian Petroleum Standards (IPS), as Practice Manuals do not
profess to cover all stages involved in every process project, but they reflect the stages that exist in
general in process projects of oil, gas and petrochemical industries of Iran.
These preparation stages describe the following and related standard three main phases which can
be distinguished in every project & include, but not be limited to:
Phase II) Detailed Design, Engineering and Procurement Stages (Containing Two Standards)
Phase III) Start-Up Sequence and General Commissioning Procedures (Containing Two
Standards)
2
June 2015 IPS-E-PR-290(1)
1. SCOPE
This Engineering Standard covers the minimum requirements of format, in preparing process and/or
utility units operating manuals, including essential instructions and points of noteworthy.
The purpose of this Manual is to standardize the content and format of operating manuals which
shall be prepared by the Contractor. Although operating manuals differ to some extent from process
to process, the basic philosophy and general aspects shall conform to the concepts of this
Standard.
Note 1:
This standard specification is reviewed and updated by the relevant technical committee on
Feb. 2001. The approved modifications by T.C. were sent to IPS users as amendment No. 1
by circular No. 137 on Feb. 2001. These modifications are included in the present issue of
IPS.
Note 2:
This is a revised version of this standard, which is issued as revision (1)-2015. Revision (0)-
1996 of the said standard specification is withdrawn.
2. REFERENCES
Throughout this Standard the following dated and undated standards/codes are referred to. These
referenced documents shall, to the extent specified herein, form a part of this standard. For dated
references, the edition cited applies. The applicability of changes in dated references that occur
after the cited date shall be mutually agreed upon by the Company and the Vendor. For undated
references, the latest edition of the referenced documents (including any supplements and
amendments) applies.
- "Contractor": Refers to the persons, firm or company whose tender has been accepted by the
"Employer", and includes the contractor’s personnel representative, successors and permitted
assigns.
3
June 2015 IPS-E-PR-290(1)
- "Unit" or "Units": Refer to one or all process, offsite and/ or utility units and facilities as
applicable to form a complete operable refinery/and or plant.
5. UNITS
This standard is based on international system of units (SI), as per IPS-E-GN-100 except where
otherwise specified.
4
June 2015 IPS-E-PR-290(1)
6. FORMAT
6.1 General
In principle, a separate operating manual shall be prepared for each process and/or utility unit.
However, in the case of short volumes, operating manuals for two or maximum three units can be
integrated into one book upon approval of the Company. The compiled operating manuals should
consist of related units, where possible.
6.2.1 Language
“The ruling language” shall be the English language. However from time to time the ‘Company’ may
instruct that certain correspondence etc. shall be in both Farsi and English.
The format of operating manuals shall essentially conform to company requirements:
Note: The quality of operating manual (binding, cover, paper etc.) shall be approved by the
company.
For covers, type and size and color of titles and any other characters, shall be approved by
company.
6.3 Titles
6.3.1 The manual shall be named as:
"Operating Manual"
5
June 2015 IPS-E-PR-290(1)
6.4 Dividers
Dividers should be provided to separate each chapter with appropriate designations of the
concerned subject.
7.1.1 Purpose
The purpose of an operating manual is not only to help the operation engineers and staff at the
customer side to operate the plant safely, but also to present all detailed procedures for the plant
start-up and shut down in the various operation cases.
7.1.2.1 Operating manuals should contain all operating procedures, guidances, hints, cautions and
trouble shooting guides necessary for plant safe and correct operation.
7.1.2.2 The detailed operation procedures should also include the sequence of valve operation,
time schedule, etc.
7.1.2.3 The Contractor should carefully study the past history of troubles experienced and
countermeasures, employed in similar processes and provide the latest instructions.
7.1.2.4 Abnormal levels of operating variables (temperature, pressure, flow rate, fluid level in
vessel, etc.) together with appropriate countermeasures should be listed in the operating manual as
far as possible to avoid similar troubles.
7.1.3.1 Operating manual should be checked carefully against project design document latest
revision.
7.1.3.2 The operation philosophy or operation notes which was prepared at the early stages of the
basic design shall be reviewed.
7.1.3.3 The necessary facilities, equipment, instruments and lines, etc., for each operation mode
(namely start-up, normal shut down, emergency, regeneration, maintenance, etc.) must be taken
into consideration.
6
June 2015 IPS-E-PR-290(1)
8. NOTEWORTHY POINTS
8.1 General
a) Figures:
(i) Trip sequence (flow) diagram.
(ii) Simplified flow scheme of plant heat-up.
(iii) Simplified flow scheme of catalyst reduction, activation, oxidation and regeneration
(generally, for Licensed Units).
(iv) Simplified flow scheme of feed cut-in, shut-down and other operation modes.
(v) Furnace drying curve.
(vi ) Other charts as needed.
b) Tables:
(i) Pressure relief valves load summary tables.
(ii) Setting point list for instruments (especially alarm and trip elements).
(iii) Analytical schedule.
(iv) Utility summary tables.
(v) Heat and material balance tables.
(vi) Major Equipment Specification Summary.
9.1 In order to standardize the quality of the operating manual, the chapters which shall be included
in the operating manual, are listed in Appendix C.
9.2 Some of the items specified in Appendix C may be modified and/or changed depending upon
the particular process and shall be approved by the Company.
7
June 2015 IPS-E-PR-290(1)
9.3.1 Sections A, B, C
9.3.2 Sections A, B, C (plant design, normal and turn down capacity), (feed characteristics),
(product and by-product specifications)
9.3.2.1 Type and source of feed and unit different operating modes to be specified.
9.3.2.2 The characteristics of feed, products and by-products (if necessary) shall be specified. The
typical feed and product charateristics for refinery are presented in Appendix C.
For Chapter I "Introduction" see Appendix C.
8
June 2015 IPS-E-PR-290(1)
• Air, Nm /h.
3
- Instrument
- Plant.
• Plant water, m /h.
3
Utility Summary Tables shall be provided separately for summer and winter operating cases when
the unit is operated under design flow rate. Additional cases may (such as start of run and end of
run for catalytic units) be included upon the Company’s request.
9.3.6.1 Effluent summary shall cover all unit effluents except those streams considered as the unit
products/byproducts as presented in section C.
9.3.6.2 The effluent summary shall include the following streams where applicable:
- Sour water.
- Oily water.
- Spent caustic solution.
- Chemical sewer.
- All other disposed liquid and solid wastes.
9.3.6.3 The following characteristics for each effluent shall be specified.
3
- Quantity, kg/h and/or m /h.
- +
- Impurities such as H2S, NH3, Oil, Cl , Na , etc. in ppm (wt), (mg/kg)
- Sources including all equipment involved.
- Destinations such as oily water sewer, non oily water sewer, chemical sewer, etc.
9
June 2015 IPS-E-PR-290(1)
Note:
All waste items disposed to environment shall comply to IPS-E-PR-725.
9.4.2 Section B
Detailed line up of the process flow separately for each section of the unit to be provided.
10
June 2015 IPS-E-PR-290(1)
9.9.1 Simplified logic diagrams for the unit, plant and equipment with step-wise operation guide-line
shall be given.
9.9.2 Main features of the advanced control systems and optimization to be specified where
applicable. Reference to the relevant specifications shall be made.
9.9.3 Set points of all alarms and shut down switches shall be listed.
11
June 2015 IPS-E-PR-290(1)
9.10.1 Several operating activities shall be conducted at the same time during the start-up and shut-
down period. So, all such activities which shall be performed in parallel for a safe and reliable start-
up and shut-down operation shall be described.
9.10.2 Special attention shall be made to the Vendor’s or Licensor’s instruction manuals and the
operating manual shall be reviewed carefully to be in congruent with the Vendor’s or Licensor’s
instructions.
9.10.3 All start-up and shut-down procedures shall be prepared in detailed step-wise activities
which will be performed by the operators with simplified start-up/shut-down sketches.
9.11.1 Safeguarding systems and equipment provided to protect the plant during emergency cases
such as emergency shut-down plant depressurizing shall be elaborated as defined Appendix B in
section XI.
9.11.2 The minimum requirement for load summary data of pressure relief valves shall be specified
as shown in Appendix F.
9.11.3 Since measures to be considered in an emergency vary according to the type, degree and
duration of the emergency encountered, determining measures to be taken into account during
commissioning and performance test period. This should be emphasized in the operating manual.
9.11.4 Steps to be taken in each emergency case shall be outlined in full description such that to
help operators to recognize and act upon immediately.
9.12.1 Miscellaneous procedures called by the nature of unit process and/or special equipment
operation not included in the other chapters shall be covered as required.
9.13 Chapter XIII (Health, Safety & Environment System operating manual):
This section describes the HSE aspects of the facility that need to be considered for HSE operating
manual
• Health:
This operation relates to the health of the people and working in the plant or living in the vicinity
of the plant whose health should be a concern for the management of the plant. This should
also address the health and well being of animals and other living organisms present in the
vicinity of the plant, for e.g. marine life in any water body which would be affected by the
operations of the plant.
A brief description of toxicity of the chemicals used in the plant / unit, acceptable noise levels for
humans and other animals, magnitude of injuries due to fire and explosion, first aid measures
for treating injuries etc. should be provided.
• Safety:
This section relates to the safe start-up, operation and shutdown of the plant during its entire
lifetime. This section should address the normal hazards those are encountered in day-to-day
operations of the plant. This section should also address the safety measures available to
prevent any accident. Some of the normal hazards could be loss of containment of any
hazardous fluid due to overflow, leak or rupture, static electricity build-up, accidental fall from
heights, burns due to exposure to hot surfaces, exposure to toxic fluids while collecting samples
and piling up of flammable solid waste (wood, paper, cloth etc.).
12
June 2015 IPS-E-PR-290(1)
• Environment:
This section describes the limits for discharge of hazardous solid, liquid and gaseous effluents
to the environment based on local laws and regulations and procedures for compliance to them.
9.16.1 An equipment item index shall be provided to show at least the following requirements in
section A for the operator’s easy reference:
- Equipment category (e.g., tower, vessel, heat exchanger, pumps, compressors, etc.).
- Equipment number.
- Equipment service name.
- Quantity.
- Referenced P & IDs.
9.16.2 A project general legend diagram, process flow diagram (PFD), process and instrument
diagram (P&ID), material flow diagram (MFD), utility flow diagram (UFD), shall be inserted in this
section.
13
June 2015 IPS-E-PR-290(1)
APPENDICES
APPENDIX A
TYPICAL FRONT COVER TITLE
NIOC
Iranian Offshore Oil Company
Islamic Republic of Iran
Ministry of Petroleum
National Iranian oil company
Location :
Dorood Project Onshore Facilities & New Plant
Document Title. :
Plant Operating Manual
Document No. :
Project Code:
Contract no.:
Date : June-2005
Volume-I
14
June 2015 IPS-E-PR-290(1)
APPENDIX B
CONTENTS OF OPERATING MANUAL
I. INTRODUCTION
V. AUXILIARY SYSTEMS
15
June 2015 IPS-E-PR-290(1)
APPENDIX B (continued)
16
June 2015 IPS-E-PR-290(1)
APPENDIX B (continued)
X. NORMAL OPERATION
A. GENERAL
B. NORMAL OPERATING CONDITIONS
C. CHECK POINTS AND ADJUSTMENTS
D. REDUCED OPERATION
XI. NORMAL SHUT-DOWN PROCEDURE
A. GENERAL
B. LOAD DOWN
C. SHUT-DOWN PROCEDURE
(to be continued)
17
June 2015 IPS-E-PR-290(1)
APPENDIX B (continued)
XIV. SAFETY
A. GENERAL
B. SAFE PLACE TO WORK
C. HAZARDS AND HAZID (HAZARD IDENTIFICATION)
D. GOOD HOUSEKEEPING
E. REQUIREMENTS FOR WELDING PERMITS
F. HAZARDOUS CHEMICALS
G. FLAMMABLE GAS/AIR MIXTURE
H. FIRE-FIGHTING EQUIPMENT
XVII. DRAWINGS
A. GENERAL
B. PROCESS FLOW DIAGRAMS
C. PIPING AND INSTRUMENT DIAGRAMS
D. UTILITY FLOW DIAGRAMS
E. PLOT PLAN.
F. ELECTRICAL SINGLE LINE DIAGRAMS
G. MATERIAL FLOW DIAGRAM (MFD)
18
June 2015 IPS-E-PR-290(1)
APPENDIX C
C.2 Characteristics of Products (in Addition to Item D.1 Above) Where Applicable:
- RVP, kPa (abs.).
- Flash point, °C.
- Viscosity at two temperatures, Pa.s.
- Pour point, °C.
- Conradson Carbon, Ash Content (in mass%) for heavy oils
- etc.
19
June 2015 IPS-E-PR-290(1)
APPENDIX D
TYPICAL HEAT AND MATERIAL BALANCE TABLE
20
June 2015 IPS-E-PR-290(1)
APPENDIX E
TYPICAL UTILITY SUMMARY TABLE
(to be continued)
21
June 2015 IPS-E-PR-290(1)
APPENDIX E (continued)
22
June 2015 IPS-E-PR-290(1)
APPENDIX F
23
June 2015 IPS-E-PR-290(1)
APPENDIX G
CHEMICAL CONSUMPTION LIST
Cyclic (Depend Of
3 PK-102 Reactor Catalyst Hydrocracker 7.5 m3 7.5 m3 25 / 35 Reactor Performace &
Vendor Suggestion)
Notes:
1. The rate depend on type of corrosion inhibitor
2. Chemical packages are note in the scope of Flow Lines & Gas Transmission EPC
Project.
3. MESC code no. Shall be submitted by procurement section
4. Vendor shall be proposed type of chemical and dosage of injection based on his
experience and proposed cyclic life of chemical /catalyst and ....
24