1 18.00 Earh work excavaction for piplines /cables by manual means up to 600 mm trench /Cum 195.30 0.00 0.00 18.00 3515.00 18.00 3515.00
2 14.00 widthwork
Earh as perexcavaction
drawing and fortechincal
piplines specifications
/cables by manual including
meanssctting ut shoring
up to 600 mm trench /Cum 233.10 0.00 0.00 14.00 3263.00 14.00 3263.00
3 18.88 width as per
Refililling drawing
avalable andaround
earth techincal specifications
trenches /pipesline including
cables insctting
layersutnotshoring
excweding /Cum 214.20 0.00 0.00 18.88 4044.00 18.88 4044.00
4 31.50 20 cms in depth
Dismantling tile compacting
work in floors each
anddeposited
roofs laidlayer by ramming
in cement motarafter watering
including with a
stacking /Cum 38.85 0.00 0.00 31.50 1224.00 31.50 1224.00
5 2.70 material toand
Provding thelaying
appropriate dispoal
in position plan area sa perconcrate
cement dection for
of engneer
leveling in charge
course for all /Cum 6222.30 0.00 0.00 2.70 16800.00 2.70 16800.00
6 9.00 works
Provdingin foundacation the granate
and laying vitrified tiles in/ trap / blastsizes
different crushed gradedto
(thickness coarse aggregates
be sepcified by /Sqm 1166.55 0.00 0.00 9.00 10499.00 9.00 10499.00
7 5.00 manufacture
Providing ) withdadooing
skiting water absorption
rise of steps lesswith
thanwhite
0.08% and conforming
glazed tiles 6mm thickto IS on
. 15622,
10mm /Sqm 2066.40 0.00 0.00 5.00 10332.00 5.00 10332.00
8 3.00 thick cement
providing andplaster
fixing 1;3 and jointed
vireous chain dual withpuropse
white cement slurry over
closet suitable for asexisiting
sqattingaough
pan or /Each 7113.75 0.00 0.00 3.00 21341.00 3.00 21341.00
9 2.00 europen type
S.C.I gully or water
nahanicloset ( anglo
grating 100mm inW.C diaspan) with-A28,I
( P NO seat &Nlid fixed with C.P brass
-514) /Each 26.25 0.00 0.00 2.00 53.00 2.00 53.00
10 4.00 Provinding and fixing PTMT towel ring trapezoidal shape 215 mm long 200mm /Each 140.70 0.00 0.00 4.00 563.00 4.00 563.00
11 2.00 wide with minium
Provinding distance
and fixing mirrorofof37superior
mm from wall
glass (offace with concealed
approved quality ) fitting
and required /Each 912.45 0.00 0.00 2.00 1825.00 2.00 1825.00
12 6.00 shape and and
Providing size fixing
with plastic moulded
wash basin withframe of apporved
C.I brackers make
, 15 mm C.Pandbrass
shande with
pillar 6 32
traps /Each 2156.00 0.00 0.00 6.00 12936.00 6.00 12936.00
13 4.00 mm CP brass
Provinding andwastgw
fixing of standed
white vircouspatten
chianincluding
flat backpainting
or wallof fittings
corner and
type brackers
lipperd front /Each 1055.25 0.00 0.00 4.00 4221.00 4.00 4221.00
14 4.00 urinal basin of
Dismantling of430x260x350
flushing cistenmm of allor types
340x410x265 mm sizes repectively
( C .I /PVC/vitrous ( P NO ,I
of chain) including /Each 442.05 0.00 0.00 4.00 1768.00 4.00 1768.00
15 4.00 stacking11-18-4;
KSRB of use full matrials and
provinding nearfixing
the site andcost
sand disposal of unserviceable
iron soil waste double matrials
equal to /Each 1131.90 0.00 0.00 4.00 4528.00 4.00 4528.00
15.a 3.00 junction
P.T.M.T of required
urinal cock degree
15 mmwith dia assecs door insertion of rubber washer 3mm thick /Each 99.75 0.00 0.00 3.00 299.00 3.00 299.00
15.b 2.00 PTMT sweiveling showeer 15 mm /Each 68.25 0.00 0.00 2.00 137.00 2.00 137.00
15.c 5.00 PTMT towel ring (600 mm /Each 152.25 0.00 0.00 5.00 761.00 5.00 761.00
15.d 3.00 PTMT urinal sprader 15 mm /Each 57.75 0.00 0.00 3.00 173.00 3.00 173.00
15.e 4.00 100 mm S.C.I trap with vent hell /Each 341.25 0.00 0.00 4.00 1365.00 4.00 1365.00
16 7.00 Providing and fixing 150 mm bright finished floor door stoper with rubber cushion /Each 216.30 0.00 0.00 7.00 1514.00 7.00 1514.00
17 6.96 necessaryand
Poviding brasfixing
screwinetc to suit fully
position shutter thickness
penelled complete
shutters for windows with honne /Sqm 3467.10 0.00 0.00 6.96 24131.00 6.96 24131.00
wood stiles and rails of 25mm thick 75mm wide in two halvas with panels provided
Remarks
TI No Estimate Unit
Estimate Previous bill Present bill Up to date
Qty Estimates
Rate
Qty. Cost Qty. Cost Qty. Cost
Rs. P.
Rs. P. Rs. P. Rs. P.
1 2 3 4 5 6 7 8 9 10 11 #
18 8.00 Providing and fixing bright finished brass hanging type floor door stopper with /Nos 114.45 0.00 0.00 8.00 916.00 8.00 916.00
19 161.11 necessary
Wall screws
painting withetc complete
plastic common
emulsion paintSR 2021-22,Vbrand
of approved -2.P and
-107manufacture
12.58 to /Sqm 65.10 0.00 0.00 161.11 10488.00 161.11 10488.00
20 93.72 give an even
Finshing shaded
walls one coats
with water on old
proffing work paint
cement as perofspecifications
required shade and; new
as per direction
work ( toe /Sqm 69.30 0.00 0.00 93.72 6495.00 93.72 6495.00
21 17.04 coat applied @
Dismantling 4.84kgs
doors /10 m2
windows and) clerestory
to give an window
even shade after
(steel or thourghiy brooming
wood) shutter the
including /Sqm 211.05 0.00 0.00 17.04 3596.00 17.04 3596.00
22 11.04 choekhats architrave
Providing and fixing holdfast etc .factory
30mm thick Complete
foamandpenelled
stsckingdoors
to theshutters
appropriate
madedisposal
form /Sqm 301.35 0.00 0.00 11.04 3327.00 11.04 3327.00
23 8.00 m.s tube of 19 gauge
Disconnecting damgeedthickness size /taress
over head 19x19mm PVCfor stilesstorage
water and 15x15
tank ofmmanyforsize
topform
& /Each 237.30 0.00 0.00 8.00 1898.00 8.00 1898.00
24 2.00 water supply
Electrical line and removing from the terrace including shifiting at ground level
work /LS 10000.00 0.00 0.00 2.00 20000.00 2.00 20000.00
25 12.00 Providing and fixing C.P brass bib cock of approved quality conforming to IS /Each 453.60 0.00 0.00 12.00 5443.00 12.00 5443.00
26 0.00 ;8931line and misc pluming work and supply of all materials related to plumbing and
Pipe
26.1 5.00 tank with
CPVT bends elboews
ASHIRVAD SDR11 couping
5MTR and all other neceassry items including labours /Each 1105.93 0.00 0.00 5.00 5530.00 5.00 5530.00
26.2 20.00 1' CPVC ELBOW ASIRVAD /Each 48.31 0.00 0.00 20.00 966.00 20.00 966.00
26.3 2.00 1' CPVC TEE ASHIRVAD /Each 61.86 0.00 0.00 2.00 124.00 2.00 124.00
26.4 12.00 CPVC 1'CUPLING ASHIRVAD /Each 26.69 0.00 0.00 12.00 320.00 12.00 320.00
26.5 30.00 CPVC 1' *1/2 BRASS ELBOW ASHIRVAD /Each 170.34 0.00 0.00 30.00 5110.00 30.00 5110.00
26.6 18.00 CPVC 1'*1/2 BRASS FT ASHIRVAD /Each 139.83 0.00 0.00 18.00 2517.00 18.00 2517.00
26.7 6.00 CPVC 1'*1/2 BRASS TEE ASHIRVAD /Each 194.07 0.00 0.00 6.00 1164.00 6.00 1164.00
26.8 6.00 CPVC 1' BALL WALL ASHIRVAD /Each 401.69 0.00 0.00 6.00 2410.00 6.00 2410.00
26.9 4.00 CPVC 1'UNION FINLOEX /Each 97.03 0.00 0.00 4.00 388.00 4.00 388.00
26.10 4.00 ARP - 101041 TWO WAY BIB COCK /Each 1228.81 0.00 0.00 4.00 4915.00 4.00 4915.00
26.11 4.00 ARP -101107 LONG BODY BIB COCK /Each 1080.51 0.00 0.00 4.00 4322.00 4.00 4322.00
26.12 12.00 WASTER CUPLER CP /Each 338.98 0.00 0.00 12.00 4068.00 12.00 4068.00
26.13 6.00 PILLER COCK CERA F1012101 /Each 2220.34 0.00 0.00 6.00 13322.00 6.00 13322.00
26.14 15.00 75MM FINOLEX SWR PIPE 3MTR /Each 558.05 0.00 0.00 15.00 8371.00 15.00 8371.00
26.15 15.00 75MM MAINDROP FINOLEX /Each 118.64 0.00 0.00 15.00 1780.00 15.00 1780.00
26.16 6.00 75MM SWR ELBOW FINOLEX /Each 88.56 0.00 0.00 6.00 531.00 6.00 531.00
26.17 20.00 75MM SWR DOOR ELBOW FINOLEX /Each 111.20 0.00 0.00 20.00 2224.00 20.00 2224.00
26.18 15.00 75MM SWR DOOR TEE FINOLEX /Each 149.58 0.00 0.00 15.00 2244.00 15.00 2244.00
26.19 12.00 75MM SWR CLMP FINOLEX /Each 16.95 0.00 0.00 12.00 203.00 12.00 203.00
26.20 21.00 75MM SWR TEE FINOLEX /Each 124.15 0.00 0.00 21.00 2607.00 21.00 2607.00
26.21 8.00 110MM FINOLEX SWR PIPE 3MTR /Each 996.61 0.00 0.00 8.00 7973.00 8.00 7973.00
26.22 10.00 110MM SWR ELBOW FINELOX /Each 153.81 0.00 0.00 10.00 1538.00 10.00 1538.00
26.23 6.00 110MM SWR TEE FINOLEX /Each 225.00 0.00 0.00 6.00 1350.00 6.00 1350.00
26.24 8.00 110MM SWR DOOR ELBOW FINOLEX /Each 188.14 0.00 0.00 8.00 1505.00 8.00 1505.00
26.25 6.00 110MM SWR DOOR TEE FFINOLEX /Each 267.80 0.00 0.00 6.00 1607.00 6.00 1607.00
26.26 12.00 110MM VENT CLOW /Each 33.90 0.00 0.00 12.00 407.00 12.00 407.00
26.27 8.00 118 CPVC SOLVENT ASHIRVAD /Each 211.86 0.00 0.00 8.00 1695.00 8.00 1695.00
Remarks
TI No Estimate Unit
Estimate Previous bill Present bill Up to date
Qty Estimates
Rate
Qty. Cost Qty. Cost Qty. Cost
Rs. P.
Rs. P. Rs. P. Rs. P.
1 2 3 4 5 6 7 8 9 10 11 #
26.28 10.00 ROOFING NAILS /Each 84.75 0.00 0.00 10.00 848.00 10.00 848.00
26.29 30.00 CPVC CLMP /Each 8.47 0.00 0.00 30.00 254.00 30.00 254.00
26.30 8.00 PVC SOLUTION 250ML /Each 101.69 0.00 0.00 8.00 814.00 8.00 814.00
26.31 8.00 Providing Sump Rings including RCC Cover /Each 800.00 0.00 0.00 8.00 6400.00 8.00 6400.00
SUB TOTAL 2,64,962.00 2,64,962.00
Deduct Contractor's Profit 10% -26,496.00 -26,496.00
Total Amount 2,38,466.00 2,38,466.00
Add GST 18% 42,924.00 42,924.00
Total-Amount 2,81,390.00 2,81,390.00
PRE-MEASUREMENT
SL
PARTICULARS ITEM NO L B D QTY. UNIT
NO
1 Earh work excavaction for piplines /cables by manual means up to 600 mm trench width as per drawing and techincal
specifications including sctting ut shoring strutting barricading caution lights removal of stumps and others deleterious matter
including dressing of excavated surface disposing off or levelling the excavated earth of stacking the selected earth for resuse
in a radius of 50 m. filling avaibale excavated earth ( earth rock ) in ternchs ,plinth, sides of foundations ect. inlayers not
exceeding 20cm in epth , consolidating each desposited layer by remmaing and watering and up to lift 1.5 m incluing cost of
labours tools usage & others appurtentenances required to complete the work extra for excavating trenchs for pipes cables
and similar work in all kinds of soil where excavacation widith is upto 600mm for depth exceeding 1.5m but not exceeding 3
m add 20 % extra ( rate is over corresponding basic item for depth up to 1.5)
3 Refililling avalable earth around trenches /pipesline cables in layers not excweding 20 cms in depth compacting each
deposited layer by ramming after watering with a lead upto 50 m including cost of all labous complete as per specifications
4 Dismantling tile work in floors and roofs laid in cement motar including stacking material to the appropriate dispoal area sa
per dection of engneer in charge
Gents & ladies toilet /bathrooms 2 1.00 4.50 3.50 31.50
31.50 /Cum
6 Provding and laying vitrified tiles in different sizes (thickness to be sepcified by manufacture ) with water absorption less
than 0.08% and conforming to IS . 15622, of approved make in all colours & shade , over 12 mm rhick bed ofcement mator
1;3( 1 matching pigments etc .complete ( p no 61 , in 9.17.2)
Toilet block 1 3.000 3.000 9.00
9.00 /Sqm
Providing skiting dadooing rise of steps with white glazed tiles 6mm thick on 10mm thick cement plaster 1;3 and jointed with
7
white cement slurry over exisiting aough plaster surface using glazed tiles of approved make and size including cost of
matrials labours complete ..(P N9.38 , IN 9.38)
Skirting 1 1.00 5.00 5.00
5.00 /Sqm
10 Provinding and fixing PTMT towel ring trapezoidal shape 215 mm long 200mm wide with minium distance of 37 mm from
wall face with concealed fitting arrangement of approved quality and colour weighing not less than 88g ( P N 130 , I N 14.39)
Provinding and fixing mirror of superior glass (of approved quality ) and required shape and size with plastic moulded frame
11 of apporved make and shande with 6 mm thick hard board backing rectangular shape 453X357mm (P NO 128 IN 14.32.2)
Mirror 2 2.00
2.00 /Each
12 Providing and fixing wash basin with C.I brackers , 15 mm C.P brass pillar traps 32 mm CP brass wastgw of standed patten
including painting of fittings and brackers cutting and making good the walls wherever required white viteous chain wash
basin size 630X450 mm with single 15mm C.P brass pillar tap(P NO 124 I N 14.7.2)
Provinding and fixing white vircous chian flat back or wall corner type lipperd front urinal basin of 430x260x350 mm or
13
340x410x265 mm sizes repectively ( P NO ,I N)
Urinal Basin 4 4.00
4.00 /Each
14 Dismantling of flushing cisten of all types ( C .I /PVC/vitrous of chain) including stacking of use full matrials near the site
and disposal of unserviceable matrials to approved disposal area as per dircation of engneer in charge
KSRB 11-18-4; provinding and fixing sand cost iron soil waste double equal junction of required degree with assecs door
15
insertion of rubber washer 3mm thick bolts and nuts including cost of material labours testing complete as per specafications
KBS 11-1-10( 26/12.56) KSRB 11-18-41.1 ;- do - with acces door 100 x 100 x 100 mmm
common SR 2001-22-V -2 P
4 4.00 /Each
15.a P.T.M.T urinal cock 15 mm dia 3 3.00 /Each
16 Providing and fixing 150 mm bright finished floor door stoper with rubber cushion necessary bras screw etc to suit shutter
thickness complete
Door Stopper 7 7.00
7.00 /Each
Poviding and fixing in position fully penelled shutters for windows with honne wood stiles and rails of 25mm thick 75mm
17 wide in two halvas with panels provided with MDF of 12 mm thick including cost of material labours charges usages charge
complete as per specifications ( excluding cost of fixtures)
common SR 2021-22-v-.pv10.3jv13.34
Door 2 1.20 2.10 5.04
Ventilators 2 1.20 0.80 1.92
6.96 /Sqm
18 Providing and fixing bright finished brass hanging type floor door stopper with necessary screws etc complete common SR
2021-22,V -2.P -107 12.58
Door Stopper 2.00 4.000 8.00
8.00 /Nos
Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shaded one coats on old work
19
as per specifications and as per direction of engneer in charge ( in side ) ( P N 51, I N 8.63) ( INSIDE)
Toilet /bathroom 4 2.00 3.00 24.00
4 2.50 3.00 30.00
wash basin area and passage 2 8.20 3.00 49.20
1 5.50 3.00 16.50
ceiling 1 8.20 5.05 41.41
161.11 /Sqm
20 Finshing walls with water proffing cement paint of required shade ; new work ( toe coat applied @ 4.84kgs /10 m2 ) to give
an even shade after thourghiy brooming the surface to remove all dist , mortor drops and forgien matter including prapering
the surface even and sand paper smooth cost of matrials labours complete as per specifications and as per dircations of
engineer in charge ( P NO 45, I N 8.28) (OUTSIDE)
Dismantling doors windows and clerestory window (steel or wood) shutter including choekhats architrave holdfast etc .
21
Complete and stscking to the appropriate disposal area as per dircation of engineer in charge of area beyond ny 3m
main doors 2 1.20 2.10 5.04
toilet doors 8 1.00 1.50 12.00
17.04 /Sqm
22 Providing and fixing 30mm thick factory foam penelled doors shutters made form m.s tube of 19 gauge thickness size
19x19mm for stiles and 15x15 mm for top & bottom rails coverd with heat moulded PVC C channel of 5mm thick sheet &
30x50 mm wide to form stiles & 5mm thivk 75 mm wide PVC sheets for top rail & bottom rail on rither side 5mm thick
20mm wide PVC sheetas gap inset for top rail & bottom rail panelling of 5mm thivk PVC sheet fitted in the M.S. frame
sceld to the stiles & rails with 5x30 mm PVC sheet bending on either side & joined togeather with solvent cement adhesive
etc complete as per manufacture specifications & direction of engineer in charge fixed to frames with 3 nos of 75mm
aliminum hinges (P NO 105,1-12.53)
Disconnecting damgeed over head /taress PVC water storage tank of any size form water supply line and removing from the
23
terrace including shifiting at ground level as per directionof engineer in charge
coomon SR 2021-22-V2P-107 2.00 4.00 8.00
8.00 /Each
25 Providing and fixing C.P brass bib cock of approved quality conforming to IS ;8931
common SR 2021-22-V-2 P 107 2 6.00 12.00
12.00 /Each
Project Engineer
Zilla Nirmithi Kendra, Raichur
ZILLA NIRMITHI KENDRA . RAICHUR
R.A. Bill 1st & Final
B O Q CHART
Name of Work : Repair and Renovation of Toilet and Bathroom for Government PU College for Boys & Girls in
Sl. No. Description of item Material details Estimation quantity Unit Payment details Rate Amount Est. amount
1 Excavation Total Qty 18.00 Labours/Machinery 3006.00 3006.00
2 Excavation Total Qty 18.88 Labours/Machinery 2790.00 2790.00
3 Refilling Earth Total Qty 18.88 Labours/Machinery 3458.00 3458.00
4 Dismantling Total Qty 31.50 Labours/Machinery 1046.00 1046.00
5 PCC Bed 1:4:8 Total Qty 2.70
Cement 2.70 4.40 12.00 Bags 378.81 4546
Sand 2.70 0.94 2.54 Cum Materials 1680.00 4267
40mm down size 2.70 0.47 1.27 Cum 1190.00 1511
Labours/Machinery 4040 14364.00
6 Vitrified Tiles Total Qty 9.00
Vitrified Tiles 9.00 1.00 9.00 Sqm 560.00 5040
Cement 9.00 0.090 1.00 Bags Materials 378.81 379
Sand 9.00 0.020 0.18 Cum 1680.00 302
Labours/Machinery 3256 8977.00
9 Nahani Grating Total Qty 2.00 1 2.00 Each Materials 22.44 45 45.00
10 Towel Ring Total Qty 4.00 1 4.00 Each Materials 120.30 481 481.00
11 Mirror Total Qty 2.00 1 2.00 Each Materials 780.14 1560 1560.00
21 Dismantling Total Qty 17.04 1 17.04 /Sqm Labours/Machinery 180.45 3075 3075.00
22 Flush Door Shutter Total Qty 11.04 1 11.04 /Sqm Materials 257.65 2844 2844.00
23 Disconnecting Storage Tank Total Qty 8.00 1 8.00 /Each Labours/Machinery 202.89 1623 1623.00
24 Electrical Work Total Qty 2.00 1 2.00 /LS Labours/Machinery 8550.00 17100 17100.00
25 Bib Cock Total Qty 12.00 1 12.00 /Each Materials 387.83 4654 4654.00
26.1 CPVT ASHIRVAD SDR11 5MTR Total Qty 5.00 1 5.00 /Each Materials 945.57 4728 4728.00
26.2 1' CPVC ELBOW ASIRVAD Total Qty 20.00 1 20.00 /Each Materials 41.31 826 826.00
26.3 1' CPVC TEE ASHIRVAD Total Qty 2.00 1 2.00 /Each Materials 52.89 106 106.00
26.4 CPVC 1'CUPLING ASHIRVAD Total Qty 12.00 1 12.00 /Each Materials 22.82 274 274.00
26.5 CPVC 1' *1/2 BRASS ELBOW ASHIRVAD Total Qty 30.00 1 30.00 /Each Materials 145.64 4369 4369.00
26.6 CPVC 1'*1/2 BRASS FT ASHIRVAD Total Qty 18.00 1 18.00 /Each Materials 119.55 2152 2152.00
26.7 CPVC 1'*1/2 BRASS TEE ASHIRVAD Total Qty 6.00 1 6.00 /Each Materials 165.93 996 996.00
26.8 CPVC 1' BALL WALL ASHIRVAD Total Qty 6.00 1 6.00 /Each Materials 343.44 2061 2061.00
26.9 CPVC 1'UNION FINLOEX Total Qty 4.00 1 4.00 /Each Materials 82.96 332 332.00
26.10 ARP - 101041 TWO WAY BIB COCK Total Qty 4.00 1 4.00 /Each Materials 1050.63 4203 4203.00
26.11 ARP -101107 LONG BODY BIB COCK Total Qty 4.00 1 4.00 /Each Materials 923.84 3695 3695.00
26.12 WASTER CUPLER CP Total Qty 12.00 1 12.00 /Each Materials 289.83 3478 3478.00
26.13 PILLER COCK CERA F1012101 Total Qty 6.00 1 6.00 /Each Materials 1898.39 11390 11390.00
26.14 75MM FINOLEX SWR PIPE 3MTR Total Qty 15.00 1 15.00 /Each Materials 477.13 7157 7157.00
26.15 75MM MAINDROP FINOLEX Total Qty 15.00 1 15.00 /Each Materials 101.44 1522 1522.00
26.16 75MM SWR ELBOW FINOLEX Total Qty 6.00 1 6.00 /Each Materials 75.72 454 454.00
26.17 75MM SWR DOOR ELBOW FINOLEX Total Qty 20.00 1 20.00 /Each Materials 95.08 1902 1902.00
26.18 75MM SWR DOOR TEE FINOLEX Total Qty 15.00 1 15.00 /Each Materials 127.89 1918 1918.00
26.19 75MM SWR CLMP FINOLEX Total Qty 12.00 1 12.00 /Each Materials 14.49 174 174.00
26.20 75MM SWR TEE FINOLEX Total Qty 21.00 1 21.00 /Each Materials 106.15 2229 2229.00
26.21 110MM FINOLEX SWR PIPE 3MTR Total Qty 8.00 1 8.00 /Each Materials 852.10 6817 6817.00
26.22 110MM SWR ELBOW FINELOX Total Qty 10.00 1 10.00 /Each Materials 131.51 1315 1315.00
26.23 110MM SWR TEE FINOLEX Total Qty 6.00 1 6.00 /Each Materials 192.38 1154 1154.00
26.24 110MM SWR DOOR ELBOW FINOLEX Total Qty 8.00 1 8.00 /Each Materials 160.86 1287 1287.00
26.25 110MM SWR DOOR TEE FFINOLEX Total Qty 6.00 1 6.00 /Each Materials 228.97 1374 1374.00
26.26 110MM VENT CLOW Total Qty 12.00 1 12.00 /Each Materials 28.98 348 348.00
26.27 118 CPVC SOLVENT ASHIRVAD Total Qty 8.00 1 8.00 /Each Materials 181.14 1449 1449.00
26.28 ROOFING NAILS Total Qty 10.00 1 10.00 /Each Materials 72.46 725 725.00
26.29 CPVC CLMP Total Qty 30.00 1 30.00 /Each Materials 7.24 217 217.00
26.30 PVC SOLUTION 250ML Total Qty 8.00 1 8.00 /Each Materials 86.94 696 696.00
26.31 Providing Sump Rings including RCC Cover Total Qty 8.00 1 8.00 /Each Materials 684.00 5472 5472.00
Total 2,26,545.00
BOQ Chart
Consolitaded Abstract
S.no. Details Qty as per BOQ Unit Rate Amount GST Total Amount
1 Cement 14.00 Bags 378.81 5303 28% 1484.84 6,788.00
2 Sand 3.72 Cum 1680.00 6250 5% 312.5 6,563.00
3 40 mm Aggregate 1.27 Cum 1190.00 1511 5% 75.55 1,587.00
4 Vitrified Tiles 9.00 Sqm 560.00 5040 18% 907.2 5,947.00
5 White Glazed Tiles 222.00 Each 23.00 5106 18% 919.08 6,025.00
6 Water Closet 4.00 Each 1600.00 6400 18% 1152 7,552.00
7 Cover 4.00 Each 350.00 1400 18% 252 1,652.00
8 Nahani Grating 2.00 Each 22.44 45 18% 8.1 53.00
9 Towel Ring 4.00 Each 120.30 481 18% 86.58 568.00
10 Mirror 2.00 Each 780.14 1560 18% 280.8 1,841.00
11 Wash Basin 6.00 Each 725.00 4350 18% 783 5,133.00
12 Pillar Tap 6.00 Each 125.00 750 18% 135 885.00
13 Urinal Basin 4.00 Each 470.00 1880 18% 338.4 2,218.00
14 sand cost iron soil 4.00 Each 967.77 3871 18% 696.78 4,568.00
15 P.T.M.T urinal cock 15 mm dia 3.00 Each 85.29 256 18% 46.08 302.00
16 PTMT sweiveling showeer 15 mm 2.00 Each 58.35 117 18% 21.06 138.00
17 PTMT towel ring (600 mm 5.00 Each 130.17 651 18% 117.18 768.00
18 PTMT urinal sprader 15 mm 3.00 Each 49.38 148 18% 26.64 175.00
19 100 mm S.C.I trap with vent hell 4.00 Each 291.77 1167 18% 210.06 1,377.00
20 Door Stopper 7.00 Each 184.94 1295 18% 233.1 1,528.00
21 Honne Wood Door Shutter 6.96 Sqm 2964.37 20632 18% 3713.76 24,346.00
20 Door Stopper 8.00 Sqm 97.85 783 18% 140.94 924.00
20 Plastic Emulsion Paint 24.00 Litres 200.00 4800 18% 864 5,664.00
20 WPC Paint 44.99 Kgs 38.00 1709 18% 307.62 2,017.00
10 Flush Door Shutter 11.04 /Sqm 257.65 2844 18% 511.92 3,356.00
11 Bib Cock 12.00 /Each 387.83 4654 18% 837.72 5,492.00
12 CPVT ASHIRVAD SDR11 5MTR 5.00 /Each 945.57 4728 18% 851.04 5,579.00
13 1' CPVC ELBOW ASIRVAD 20.00 /Each 41.31 826 18% 148.68 975.00
14 1' CPVC TEE ASHIRVAD 2.00 /Each 52.89 106 18% 19.08 125.00
15 CPVC 1'CUPLING ASHIRVAD 12.00 /Each 22.82 274 18% 49.32 323.00
16 CPVC 1' *1/2 BRASS ELBOW ASHIRVAD 30.00 /Each 145.64 4369 18% 786.42 5,155.00
17 CPVC 1'*1/2 BRASS FT ASHIRVAD 18.00 /Each 119.55 2152 18% 387.36 2,539.00
18 CPVC 1'*1/2 BRASS TEE ASHIRVAD 6.00 /Each 165.93 996 18% 179.28 1,175.00
19 CPVC 1' BALL WALL ASHIRVAD 6.00 /Each 343.44 2061 18% 370.98 2,432.00
20 CPVC 1'UNION FINLOEX 4.00 /Each 82.96 332 18% 59.76 392.00
21 ARP - 101041 TWO WAY BIB COCK 4.00 /Each 1050.63 4203 18% 756.54 4,960.00
20 ARP -101107 LONG BODY BIB COCK 4.00 /Each 923.84 3695 18% 665.1 4,360.00
20 WASTER CUPLER CP 12.00 /Each 289.83 3478 18% 626.04 4,104.00
20 PILLER COCK CERA F1012101 6.00 /Each 1898.39 11390 18% 2050.2 13,440.00
12 75MM FINOLEX SWR PIPE 3MTR 15.00 /Each 477.13 7157 18% 1288.26 8,445.00
13 75MM MAINDROP FINOLEX 15.00 /Each 101.44 1522 18% 273.96 1,796.00
14 75MM SWR ELBOW FINOLEX 6.00 /Each 75.72 454 18% 81.72 536.00
15 75MM SWR DOOR ELBOW FINOLEX 20.00 /Each 95.08 1902 18% 342.36 2,244.00
16 75MM SWR DOOR TEE FINOLEX 15.00 /Each 127.89 1918 18% 345.24 2,263.00
17 75MM SWR CLMP FINOLEX 12.00 /Each 14.49 174 18% 31.32 205.00
18 75MM SWR TEE FINOLEX 21.00 /Each 106.15 2229 18% 401.22 2,630.00
19 110MM FINOLEX SWR PIPE 3MTR 8.00 /Each 852.10 6817 18% 1227.06 8,044.00
20 110MM SWR ELBOW FINELOX 10.00 /Each 131.51 1315 18% 236.7 1,552.00
21 110MM SWR TEE FINOLEX 6.00 /Each 192.38 1154 18% 207.72 1,362.00
20 110MM SWR DOOR ELBOW FINOLEX 8.00 /Each 160.86 1287 18% 231.66 1,519.00
20 110MM SWR DOOR TEE FFINOLEX 6.00 /Each 228.97 1374 18% 247.32 1,621.00
20 110MM VENT CLOW 12.00 /Each 28.98 348 18% 62.64 411.00
12 118 CPVC SOLVENT ASHIRVAD 8.00 /Each 181.14 1449 18% 260.82 1,710.00
13 ROOFING NAILS 10.00 /Each 72.46 725 18% 130.5 856.00
14 CPVC CLMP 30.00 /Each 7.24 217 18% 39.06 256.00
15 PVC SOLUTION 250ML 8.00 /Each 86.94 696 18% 125.28 821.00
16 Providing Sump Rings including RCC Cover 8.00 /Each 684.00 5472 18% 984.96 6,457.00
22 Skilled Labours 34.00 Nos 567.00 19278 18% 3470.04 22,748.00
23 Unskilled Labours 69.00 Nos 540.00 37260 18% 6706.8 43,967.00
24 Backhoe-loader 1 m3 bucket capacity 6.00 Hours 1361.00 8166 18% 1469.88 9,636.00
25 Tractor-Trolley 5.00 Hours 659.00 3295 18% 593.1 3,888.00
26 Concrete Mixer - 1 m3 1.83 Hours 396.00 723 18% 130.14 853.00
2,26,545.00 2,66,846.00
Project Engineer
Zilla Nirmithi Kendra
Raichur
R.A. Bill 1st & Final
LABOURS & USAGE OF MACHINERY DETAILS
A) Dismantling & Excavation
Sl.No Description Per Day Rate Hours Amount Days
1 Backhoe-loader 1 m3 bucket capacity 1361 6 8,166.00 1
2 Tractor-Trolley 659 5 3,295.00 1
Total Machinery A 11,461.00
Rate Nos Amount
Skilled Labour 1 567 1 567.00 1
Unskilled Labour 3 540 3 1,620.00 1
Total Labour A 2,187
B) Civil Works
Sl.No Description Rate Nos Amount Days
1 Skilled Labour 3 567 33 18,711.00 11
2 Unskilled Labour 6 540 66 35,640.00 11
Total Labour B 54,351.00
Rate Hours Amount Days
3 Concrete Mixer - 1 m3 396 2 723.00 1
Total Machinery B 723
Project Engineer