1MC08 BBV - MSD CV Dde N000 100302 S4 P02
1MC08 BBV - MSD CV Dde N000 100302 S4 P02
2190
Weep holes
Min. depth of UTX chamber base
1700
below lowest rail
Cable trough Cable trough
shown indicatively Min. depth of UTX shown indicatively
below lowest rail
Varies Varies
1 1
150 min.
Topsoil
Cable trough
shown indicatively
Topsoil
Slab Track
RC connection
chamber (5) 3500 HS2 Track HS2 Track
3500
Varies Varies
1 1
Drainage Drainage
corridor corridor
2190
Min. depth of UTX chamber base
1700
below lowest rail
Weep holes
150 min.
Key
METRES
@ 1:50
0 0.5 1 2 5
METRES
@ 1:20
0 0.2 0.5 1 2
Fit for Stage Acceptance
Legends/Notes: Project/Contract
Fit for Stage Acceptance TKAU OFAB RSHE --- HS2 accepts no responsibility for any circumstances which arise from
P02 the reproduction of this document after alteration, amendment or abbreviation (8) Depending drainage detail shown is indicative and will vary for
(1) All dimensions are in millimetres unless specified otherwise. (N1) Long Itchington Wood Tunnel to Birmingham Interchange Station
15/08/23 15/08/23 15/08/23 --- or if it is issued in part or issued incompletely in any way.
(2) This drawing must only be used in conjunction with asset specific drawings/diagrams. each location on drainage design. Pipe diameter and depth will
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used © Copyright Controller HMSO 2018. This material is published for High Speed Two (HS2) Limited with the permission of the Controller of Her Majesty’s Stationery Office". "The authors of this information are employed by Balfour Beatty Vinci JV. The work
for any other purpose. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any reported herein was carried out under a deed placed on 01/08/2017 by High Speed Two (HS2) Limited and should not be relied upon as authoritative by any third party. This report shall not be copied or reproduced in whole or in part except with the express
error or omission which is due to an error or omission in data supplied to us by other parties. consent of High Speed Two (HS2) Limited