300 Bedded Bakin Pertin General Hospital Upgradation Report - 30.01.2025

The document outlines machinery usage and work done on a construction site, detailing various equipment, contractors, and labor involved. It includes information on soil shifting, excavation, and transformer shifting work scheduled for January 30, 2025. Additionally, it lists materials issued and received, along with signatures from project managers and contractors.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views2 pages

300 Bedded Bakin Pertin General Hospital Upgradation Report - 30.01.2025

The document outlines machinery usage and work done on a construction site, detailing various equipment, contractors, and labor involved. It includes information on soil shifting, excavation, and transformer shifting work scheduled for January 30, 2025. Additionally, it lists materials issued and received, along with signatures from project managers and contractors.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

MACHINERY

SLUSED :
NO WORK
DONE: S. DONE:
WORK S. DONE:
WORK No. S. |STAFF: SITE:
7 6 5 3 2 1 1 No. 1 No. 1 1

AS-06BC-7099
30KVAAS-06AC-6601
(JCB)(DUMPER)
DG AR-13-7276 (JCB)(DUMPER)
|AR-010-9574
AR-01Q-6561 TODAY Contractor's
Rafiqul
Islam
Md. TODAY Contractor's
Amdadul
Islam
Md. KEEPING
WORK
GATE Amdadul
Islam
Md. Upgradation
K.
HYDRA K.
NO NO Shukla,
1729 MACHINE WORK WORK
Name Name Contractor's
Name
Ishtiaq of
Je NAME
DUE DUE 300
Po0er, TO TO
Ahmad,Bedded
RAIN RAIN
&
NO
Shahnawaz Bakin
Help)
Hospital,
General
Pertin

Hasan
READINGOP
334.85 996.5 2421.76753.9 38742 34576 Mason Mason Mason
4 6 &
Diganta
Measurement Measurement
M.R.Labour
Depatment
Supply
Mohan
PasighatBADRI
READING CL
334.85 998.2 2427.96760.138753 34584
10M/c M/c 1M/c (Surveyor)
Labour Labour RAI
&
Work Work CO.
RUNNING
TOTAL (2) (1)
(KM/HR)
0 1.7 6.2 6.2 A 11 8
Mason

TODAY
POWERHOUSE |NO |SOIL SHIFTING
SOIL WORK
SOIL SOIL
WORK
EXCAVATION SHIFTING
WORK DATE
EXCAVATION
NO
WORK DUE Remark Remark :30
o/T
TRANSFORMER
SHIFTING
WORK TO Jan
(STAND)
BREAKDOWN & & DETAILS
WORK
SHIFTING
SHIFTING 2025

WORK WORK M/c


REPORT NOTE MATERIALS
No. S. MATERIALS
No. S. No. S.STAFF: SITE
MATERIALS

- :
Site K.
Upgradation
epiyelrHydra
PREPARED
a Visit
ISSUEDTO ISSUED RECEIVED
Shukla,
K.

ByMaterial
Name Material
Name
TO
BY:
qivenHealth CONTRACTOR
RAFIQUL :
CONTRACTOR NameFROM:
Material Ishtiaq of
300
Bo0L'0ASDepartment
DEEPJYOTI
to Ahmad,Bedded
CRUSHER

NATH Power MD. : Bakin


Shahnawaz
SITE
AMDADUL
& Pertin
depatment PWD
Perpose
IssueFor
ISLAM
Perpose
IssueFor
Teamn General
ISLAM VEHICLENO Hasan

(E.E, &
Hospital,
Diganta
SIGNATURE
MANAGER
GENERAL A.E
&
ingkeng
veyuest
Yivan J.E
Sir) CHALLAN
NO.
PasighatBADRI
Mohan

Oty Qty (Surveyor) RAI


&
CO.

QUANTITY

Unit Unit

UNIT
DATE

:30

SIGNATURE
MANAGER
PROJECT Jan
2025

Remark Remark Remarks