Australian Standard: The Calculation of Short-Circuit Currents in Three-Phase A.C. Systems
Australian Standard: The Calculation of Short-Circuit Currents in Three-Phase A.C. Systems
Australian Standard
Review of Australian Standards. To keep abreast of progress in industry, Australi an Standards are subject
to periodic review and are kept up to date by the issue of amendments or new editi ons as necessary. It is
important therefore that Standards users ensure that they are in possession of the latest editi on, and any
amendments thereto.
This is a free 8 page sample. Access the full version online.
Full detail s of all Australi an Standards and related publications will be found in the Standards Australi a
Catalogue of Publications; this information is supplemented each month by the magazine ‘The Australian
Standard’, which subscribing members receive, and which gives detail s of new publi cati ons, new edit ions
and amendments, and of withdrawn Standards.
Suggesti ons for improvements to Australi an Standards, addressed to the head off ice of Standards Australi a,
are welcomed. Noti fi cati on of any inaccuracy or ambiguity found in an Australian Standard should be made
without delay in order that the matter may be investigated and appropriate action taken.
Australian Standard
Incorporating:
This is a free 8 page sample. Access the full version online.
Amdt 1—1992
PREFACE
This Standard was prepared by the Standards Australia Committee on Power Switchgear, in response
to requests from the industry for standard methods suitable for both manual and computer calculation
of prospective short-circuit currents.
It is based technically on the following IEC documents and acknowledgement is made of the
assistance received from these documents:
73(Central Office)5: Draft—Short-circuit calculation in three-phase a.c. systems
73(Central Office)17: Draft—Application guide for the calculation of short-circuit currents in low-
voltage radial systems neglecting the influence of motors
IEC 865: Calculation of the effects of short-circuit currents
The editorial presentation of this Standard does not follow these IEC documents but adopts a concise
and systematic approach which should be more readily understood by non-specialist electrical
engineers and students of electrical engineering.
The calculation procedure is divided into two basic steps—
(a) calculating the impedances of the circuit elements from their characteristics independent of the
fault; and
(b) the calculation of fault currents from the fault voltage and impedances.
This Standard is concerned with the calculation of the current in the fault. The distribution of resulting
currents in the network would need to be determined from detailed circuit analysis.
The major differences between this Standard and the above IEC documents are as follows:
(i) The IEC concept of a power station unit has been deleted, generators and transformers being
treated independently. This results in a different treatment of faults around power station units.
(ii) The concept of I 2 t (joule integral) of the short-circuit has been substituted for the thermal
equivalent short-circuit current in IEC 865, which permits a uniform presentation of results with
regard to both fuse and circuit-breaker characteristics.
(iii) The reader is provided with data to be assumed in the absence of known data. This is
particularly useful for calculations requiring zero-sequence data.
(iv) Values of the voltage factor (c) have been chosen to be representative of Australian practice.
(v) A more general equation has been provided for overhead line impedance.
(vi) Figure 8.2 for determination of the type of short-circuit producing the highest current when the
phase angles of the sequence impedances are equal, has been redrawn to cover a wider range,
allowing an improved appreciation of the relative significance of line-to-line-earth faults.
(vii) Appendix A has been included to cover standard calculations on a per unit basis.
(viii) Appendix C has been included showing equivalent circuits for the determination of zero-
sequence short-circuit currents in transformers.
(ix) The Appendices D and E provide different examples for the calculation of short-circuit currents
on ohmic and per unit bases respectively.
This is a free 8 page sample. Access the full version online.
CONTENTS
Page
FOREWORD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2 NOTATION
2.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
2.2 Quantity symbols . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Page
APPENDICES
A CALCULATIONS ON A PER UNIT BASIS . . . . . . . . . . . . . . . . . . . . . . . ..... 40
B DETERMINATION OF GEOMETRIC MEAN RADIUS GMR FOR USE IN
EQUATION 7.15 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. .. 44
C EQUIVALENT CIRCUITS FOR DETERMINATION OF ZERO SEQUENCE
SHORT-CIRCUIT CURRENTS IN TRANSFORMERS . . . . . . . . . . . . . . . . . . .. . 46
D WORKED EXAMPLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . 48
E WORKED EXAMPLE IN PER UNIT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . 79
F NOTATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . 86
This is a free 8 page sample. Access the full version online.
5 AS 3851—1991
FOREWORD
The purpose of this Standard is to standardize a general, practicable and concise procedure for the
calculation of short-circuit currents in electrical installations leading to conservative results with
sufficient accuracy. For this purpose, the current is computed by considering an equivalent voltage
source applied to the installation at the short-circuit location, with all other sources set to zero (see
Clause 5). The procedure is suitable for computation by manual methods, analogue simulators (e.g.
network analysers) or digital computers.
Other methods employing more complex models or those based on tests conducted on an existing
installation are not excluded provided they give at least the same precision. For example, in existing,
low voltage systems it is possible to determine the short-circuit and hence the prospective short-circuit
current, on the basis of measurements at the prospective short-circuit location.
While the measurement methods are limited to existing installations, calculation methods based on the
rated characteristics of electrical equipment and the topological arrangement of the system have
application to both existing systems and to systems at the planning stage.
The standard procedure consists of a basic conservative method with variations to give higher
accuracy when necessary, such as when the fault level is close to equipment ratings. The procedure
is varied according to—
(a) whether or not the short-circuit current is significantly influenced by generators and motors; and
(b) the requirements for increased accuracy of short-circuit calculation.
Two different short-circuit currents are calculated which differ in their magnitude—
(i) the maximum short-circuit current which determines the necessary capacity or rating of electrical
equipment; and
(ii) the minimum short-circuit current which can be a basis for assessing the adequacy of protection
sensitivity and the application of fuses having minimum breaking current limitations.
This is a free 8 page sample. Access the full version online.
AS 3851—1991 6
STANDARDS AUSTRALIA
Australian Standard
The calculation of short-circuit currents in three-phase a.c. systems
COPYRIGHT
AS 3851-1991 The calculation of short-circuit currents in
three-phase a.c. systems
This is a free 8 page sample. Access the full version online.
SAI Global also carries a wide range of publications from a wide variety of Standards Publishers: