Survey Nos. 8/2 & 25/1, Ajapar, Anjar Survey Nos.
8/2 & 25/1, Ajapar, Anjar
Construction rate of RCC SHED Construction
Actual rate of only Shed
Actual Area Area as Adjusted Rate per Adj.
as per Plan Adjusted Area Rate per Sq. Mtr. Actual Value Adj. Value per Plan Area Sq. Mtr. Actual Value Value
Land 19628 676 13268528 0 Land 19628 676 13268528 0
Constructed Portion 3340.7 16800 56123760 0 Constructed Portion 3340.7 12300 41090610 0
Less: Depriciation @ 0% 0 Less: Depriciation @ 20.4% (17 years) 8382484.44 0
Constructed Portion
Constructed Portion Value 56123760 0 Value after 32708125.56 0
after Depriciation Depriciation
Total 69392288 0 Total 45976653.56 0
Stamp Duty 4.90% 3400222 0 Stamp Dut 4.90% 2252856 0
Reg. Fees 1% 693923 0 Reg. Fees 1% 459767 0
4094145 0 2712623 0
Stamp Duty & Reg. Charges @ 6% 4163537.28 0 Stamp Duty & Reg. C 2758599.2136 0