D Daily Report 11FAB 23

The Daily Drilling Report No. 42 for the FBOS-B6 rig on November 2, 2023, indicates ongoing operations to drill out cement and prepare for the next phase. The report highlights a total depth of 3641 feet, with no injuries reported in the last seven days and a safety meeting held on October 2, 2023. The report also details equipment used, personnel on-site, and operational notes, including successful pressure tests on the BOP.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views1 page

D Daily Report 11FAB 23

The Daily Drilling Report No. 42 for the FBOS-B6 rig on November 2, 2023, indicates ongoing operations to drill out cement and prepare for the next phase. The report highlights a total depth of 3641 feet, with no injuries reported in the last seven days and a safety meeting held on October 2, 2023. The report also details equipment used, personnel on-site, and operational notes, including successful pressure tests on the BOP.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Safety First

DAILY DRILLING REPORT


Report No 42
Date: 11 2 2023
Rig Name FBOS-B6 Conssion NC151 Type Objective: DEVELOPMENT Company ZALLAF

SPUD DATE 1/1/2023 WELL No B9-NC151 Days : 42 Days Since Last Injury: 7

Present Operation: DRILL OUT CEMENT AND DN-TOOL


Next Operation: POOH

Proposed TD 3641 R.O.P Depth 3641 FD of Today Total Footge 3641 Move From: Move To:
Rig
Move Distance: Time:
B
H
A
8 1/2 BIT & 2*6 1/5 DC &2* 4/34 DC &2* 3 1/2 HWDP
N
O
0

Bit No #3 TypeRSX716M-A1 Size 12 1/4'' WOB 30-Dec RPM Pressure STg W 92lbs Flow Rate

Pump No. 1: m Liner Size: 7'' Pressure: T/Pressure SCR Toolpusher MOHAMMED
Mud
Pumps Pump No. 2: 70 Liner Size: 7'' Pressure: T/Pressure SCR Company Man RAMADAN

Hole Size
12 1/4'' Casing Size 13 5/8'' Casing Shoe 738 Mud Weight 9.4

BOP A-Date Last P/T: 11/2/2023 B - PRESSURE 1500-200 C -Date Last F/T: 11/2/2023

TM for Today 13 Cumulative 346 Since Last Cut 544 Length of Rope Remaining: 3290 Safety Meeting date 10/2/2023 Supject FIRST AID

REPAIRS A-Last 24 Hrs 0 B-Month: 0 TOTAL PERSONNELS 73 SET CARD 8 TRIC CARD 8

From To OPERATIONS
00.00 P/T C.S Flanges T/1500psi F/15Min. Ok
Cont. N/U BOP, Kill Line and HCR Valve
Redress BOP W/3 1/2''Rams, P/U, M/U Test Plug RIH W/3 1/2''Landing Jt
Close Pipe Ram and HCR P/T the Same T/500/2000psi Low/High PRESS F/15Min. Ok
09.30 Open Pipe Ram, Close HYDRL, P/T the Same T/500/1500psi Low/High Press F/15Min.Ok
09.30 P/U, M/U and RIH W/8 1/2''Bit (S.N SB117) and BHA (2jts 6''DC+2Jts 4 3/4''DC+3''HWDP)
Meanwhile, Mix and Prep 650bbls of 8.5ppg Filtrated Brine
00.00 Depth @00:00 2650ft.

00.00 06.00 OPERATIONS FROM 00.00 TO 06.00


00.00 Cont. RH W/Same BHA, Tag DV, DRLG through C.P.

06.00 Cont. RIH W/Same BHA Tag TOC. POOH and Rack Back on Rig Floor

Time Disribution - Hours NOTES for Operation


Rih Time for
Rig U/D 0 Trips 0
Csg Safety 1/2 1

Drilling 0 Servise 0 Fishing 0 2


Reaming 0 Repair 0 0 3
Log 0 Slip/Cut 0 0 4
CMT 9 1/2 NU Bop 12 0 5
C/Mud 0 Test Bop 2 0 6
Coring 0 NDBop 0 0 7

Diesel Used 2600 Diesel Balance 72,508

Field Break : Received: Dispatchure Requirements:

PERSONNEL In Rig 31 Camp 9 Clinte 14 Well Service 15 Visitor 0 Others 5 Note

No. of Vehicles/ Trucks : 9 Condition of Vehicles: Qty 8 Good 1 Bad


Crane PL 5-58015 Crane 514563 Forklift 5-14130 Truck 5-39846/530914 Water Truck Qty 2540997 Bulldozer N/A

140 Wt.: 1 90 Wt.: 1 50/20 Wt.: 1 40wt 6 37wt 1 ATF 2

Oxygen: Full 23 Empty 1 Acetylene: Full 11 Empty 0 Nitrogen Full 7 Empty 0